3617-v2 |
Run III: Continued Running of the Tevatron Collider Beyond 2011 |
Valeri A Lebedev et al. |
Tevatron
|
26 May 2010 |
3345-v1 |
What happens in a gas filled RF cavity when beam goes thru it? |
Alvin Tollestrup |
Adv. Accelerator R&D
Accelerator Seminar
|
25 Mar 2009 |
621-v1 |
BEAM LOSS AND BACKGROUNDS IN THE CDF AND D0 DETECTORS DUE TO NUCLEAR ELASTIC BEAM-GAS SCATTERING |
Alexandr Drozhdin et al. |
Collimators
Energy Deposition
DZero Forward Proton Detector
|
02 Jun 2008 |
3067-v2 |
Instrumentation-Systems-SDA meeting of April 2, 2008 |
David P Capista et al. |
SDA
Instrumentation
|
08 Apr 2008 |
2888-v5 |
Instrumentation-Systems-SDA meeting of October 3, 2007 |
Timofei B Bolshakov et al. |
SDA
Flying Wires
|
04 Oct 2007 |
2853-v3 |
Instrumentation-Systems-SDA meeting of August 1, 2007 |
David P Capista et al. |
SDA
|
09 Aug 2007 |
1997-v1 |
Proton Vertical Emittance Blow up by AntiProtons |
Vladimir Shiltsev et al. |
Transverse Dynamics
Beam-beam Effects
|
19 Oct 2005 |
1469-v13 |
Beam-Beam Effects Paper: Text, Figs and PAC'05 article |
Yuri Alexahin et al. |
Beam-beam Effects
|
01 Sep 2005 |
1864-v1 |
Longitudinal Beam-Beam Effects in Tevatron |
Vladimir Shiltsev et al. |
Beam-beam Effects
|
08 Jun 2005 |
1337-v2 |
notes from Instrumentation/Beam Physics Meetings |
Nathan Eddy et al. |
DCCTs
Ion Profile Monitor
Intensity Measurements
SyncLite (SL)
Instrumentation/beam Physics
Tune Measurement
Sampled Bunch Display (SBD)
Schottky
FBI
Dampers
Abort Gap Measurements
Flying Wires
|
29 Mar 2005 |
1519-v2 |
Study of the IBS in Tevatron |
Vladimir Shiltsev et al. |
Emittance
|
28 Mar 2005 |
1477-v2 |
Projects in the Accelerator Division suited for University collaboration |
William J. Ashmanskas et al. |
SDA
|
15 Dec 2004 |
1345-v1 |
Documents for New MI SBD |
Chandrashekhara M. Bhat et al. |
Beam Instrumentation
Sampled Bunch Display (SBD)
|
22 Sep 2004 |
1155-v1 |
Emittance Growth, Beam Lifetime in the Tevatron at 150 GeV |
Valeri A Lebedev et al. |
Emittance
|
03 May 2004 |
1074-v1 |
Analysis of Store 3261 |
Alvin Tollestrup |
Beam Studies
|
13 Mar 2004 |
976-v1 |
Meeting on Tev abort gap losses and CDF |
Jean Slaughter et al. |
Meetings
Instrumentation
|
14 Jan 2004 |
963-v1 |
Micro Magnet Review 12-17-03 |
Pierre Bauer et al. |
Magnets
Magnets
|
07 Jan 2004 |
881-v1 |
Emittance in the Tevatron: Talk 10-15-03 |
Alvin Tollestrup |
Run II
Sampled Bunch Display (SBD)
Longitudinal Dynamics
|
20 Oct 2003 |
722-v1 |
Calibration of the SBD using T:IBEAM as a reference |
Alvin Tollestrup |
Instrumentation
|
08 Jul 2003 |
693-v1 |
Tev SBD, FBI calibrations |
Alvin Tollestrup |
Talks
Meetings
Instrumentation
Sampled Bunch Display (SBD)
FBI
Tevatron Group
|
27 Jun 2003 |
658-v1 |
Calibration of the SBD- 6-6-03 |
Alvin Tollestrup |
Instrumentation
Sampled Bunch Display (SBD)
Tevatron Group
|
06 Jun 2003 |
610-v1 |
losses at start of acceleration |
Alvin Tollestrup |
Sampled Bunch Display (SBD)
Beam ramp
|
21 May 2003 |
541-v2 |
Tev SBD response and Toy algorithm for unscrambling longitudinal phase space |
Alvin Tollestrup |
Emittance
Run II
Instrumentation
Sampled Bunch Display (SBD)
|
21 May 2003 |
556-v1 |
Beam Loss and Backgroundis in the CDF and D0 Detectors due to Nuclear Elastic Beam-Gas Scattering |
Alexandr Drozhdin et al. |
Energy Deposition
Collimators
|
11 Apr 2003 |
548-v2 |
A simple numerical algorithm for obtaining longitudinal phase space density from the time projection of the current |
Alvin Tollestrup |
Emittance
Sampled Bunch Display (SBD)
Longitudinal Dynamics
|
07 Apr 2003 |
244-v1 |
Response of the FBI and SBD in Store 1834 |
Alvin Tollestrup |
Sampled Bunch Display (SBD)
FBI
General
|
13 Dec 2002 |