7763-v2 |
Proton Source 8-hr Studies (January-June, 2019) |
Chandrashekhara M. Bhat et al. |
Beam Instrumentation
LLRF
Upgrades
Beam Dynamics
Operations
Power Supplies
HLRF
Studies
|
22 Oct 2019 |
6037-v1 |
g-2 Ring Injection Kicker Step Response |
Dennis Barak et al. |
g-2
|
19 Jan 2018 |
4774-v1 |
PIP Status Report Meeting |
Trevor A Butler et al. |
Upgrades
PIP
Linac
|
25 Feb 2015 |
4021-v2 |
PIP Linac Modulator Specification Data |
Trevor A Butler et al. |
PIP
Linac
|
22 Sep 2014 |
4501-v1 |
PIP General Info |
Trevor A Butler et al. |
PIP
|
27 Dec 2013 |
4499-v1 |
3-CELL TEST RESULTS & 9-CELL PLAN |
Howard Pfeffer |
HLRF
PIP
|
18 Dec 2013 |
4262-v1 |
Linac Low Energy Modulators Status Update |
Howard Pfeffer |
HLRF
PIP
|
19 Dec 2012 |
3700-v1 |
LHC Hardware Commissioning Experience |
Bob Flora et al. |
Talks
|
25 Oct 2010 |
3050-v1 |
Pelletron GVM signal spikes |
Howard Pfeffer |
Electron Cooling
|
12 Mar 2008 |
2584-v1 |
The Measurements and Analysis of Electromagnetic Interference arising from the Booster GMPS |
Weiren Chou et al. |
Beam Instrumentation
Power Supplies
|
11 Dec 2006 |
2548-v1 |
Report from Booster Corrector Review |
Thomas H Nicol et al. |
Upgrades
Proton Plan
|
08 Nov 2006 |
2350-v1 |
Electron Beam Generations and Control in Tevatron Electron Lenses |
Vsevolod Kamerdzhiev et al. |
Adv. Accelerator R&D
Beam-beam Compensation
|
17 Jul 2006 |
718-v1 |
NuMI Hadronic Hose Technical Design Report |
Robert J. Ducar et al. |
Decay Pipe
|
08 Jul 2003 |