340-v2 |
SWIC and Multiwire Timing |
James L. Crisp et al. |
Controls
Transfer Lines
Beam Instrumentation
|
26 Sep 2019 |
339-v2 |
Stripline Detectors for Fermilab Main Injector |
James L. Crisp et al. |
Beam Instrumentation
Beam Dynamics
|
26 Sep 2019 |
604-v2 |
Increasing the Range of Recycler IBEAM |
James L. Crisp et al. |
Beam Instrumentation
|
22 Aug 2003 |
3614-v1 |
Instability Study in the Recycler |
Chandrashekhara M. Bhat et al. |
MI-RR-Group
Studies
Beam Dynamics
RF
Electron Cooling
|
21 May 2010 |
3506-v1 |
Linac and A0 water temperature regulation |
James L. Crisp |
Operations
Controls
Water
HLRF
Linac
|
24 Nov 2009 |
3281-v1 |
Microwave Electron Cloud Measurements in the Main Injector |
James L. Crisp et al. |
Beam Instrumentation
Project X
|
13 Jan 2009 |
3028-v1 |
Recycler batch length effects on R:BEAM as measured with a Bergoz 'New Parametric Current Transformer' |
James L. Crisp |
DCCTs
Intensity Measurements
Beam Instrumentation
|
11 Feb 2008 |
2938-v1 |
Instrumentation-Systems-SDA meeting of November 7, 2007 |
James L. Crisp et al. |
SDA
Instrumentation
|
29 Nov 2007 |
2283-v3 |
Updated list of Projects in the Accelerator Division suited for University collaboration |
William J. Ashmanskas et al. |
SDA
|
12 Jun 2006 |
2221-v1 |
Proposed Booster bpm geometry |
James L. Crisp |
BPM
Beam Instrumentation
Upgrades
|
03 Apr 2006 |
1328-v1 |
Recycler BPM System |
Charles Briegel et al. |
Beam Instrumentation
|
31 Mar 2006 |
1892-v1 |
Recycler Transverse Damper Status |
James L. Crisp |
Instabilities
BPM
Beam Dynamics
BPM
Dampers
|
06 Jul 2005 |
1476-v1 |
Tevatron Resistive Wall Current Monitor Circuit Schematic |
James L. Crisp et al. |
Instrumentation
Sampled Bunch Display (SBD)
FBI
Intensity Measurements
|
24 Nov 2004 |
1344-v1 |
Main Injector bpm scale factors |
James L. Crisp |
BPM
Beam Instrumentation
|
14 Sep 2004 |
1034-v1 |
Wall-current monitor photographs |
James L. Crisp et al. |
Instrumentation
Talks
Sampled Bunch Display (SBD)
FBI
|
22 Feb 2004 |
812-v1 |
Tev bpm sources of error |
James L. Crisp |
BPM
Tevatron BPM
BPM
|
29 Aug 2003 |
736-v1 |
Coupling Between Adjacent BPMs |
James L. Crisp |
BPM
BPM
Monitoring Instrumentation
|
17 Jul 2003 |
546-v1 |
Tevatron Stripline Data Showing Head-Tail Motion |
James L. Crisp |
Instabilities
Beam Studies
|
04 Apr 2003 |
545-v1 |
Tevatron Separator Beam Impedance |
James L. Crisp et al. |
Instabilities
Kickers and Separators
|
04 Apr 2003 |
544-v1 |
Tevatron C0 and F0 Lambertson Beam Impedance |
James L. Crisp et al. |
Instabilities
Magnets
Magnets
Magnets
|
04 Apr 2003 |
438-v1 |
Recycler BPM Proposal - July 10, 2002 |
James L. Crisp et al. |
BPM
BPM
Beam Instrumentation
|
13 Feb 2003 |
412-v1 |
FNAL instrumentation: Lessons Learned |
James L. Crisp |
BPM
Beam Instrumentation
Beam Loss Monitors (BLM)
Data Acquisition
|
27 Jan 2003 |
408-v1 |
Measured Longitudinal Beam Impedance of Booster Gradient Magnets |
James L. Crisp et al. |
Magnets
|
27 Jan 2003 |
286-v1 |
The Effect of Quadrupole Magnetic Fields on Main Injector BPM Measurements |
James L. Crisp et al. |
BPM
Beam Instrumentation
BPM
|
31 Jan 1997 |