7115-v1 |
LCLS-II CMTS Cavity Probe Calibrations |
Edward W. Cullerton et al. |
CMTF
CMTS-1
LLRF
|
20 Mar 2019 |
5350-v5 |
Y567b Power Amplifier Tests at 76 and 106 MHz |
Robyn L Madrak et al. |
Upgrades
PIP
HLRF
|
09 Feb 2018 |
5240-v1 |
PIP Status Report Meeting |
Trevor A Butler et al. |
PIP
|
28 Sep 2016 |
5239-v1 |
PIP Status Report Meeting |
Matthew H Gardner et al. |
PIP
|
27 Sep 2016 |
4972-v2 |
Obsolete ADAP-06-0021 RF Department Management Plan in Support of the FMI Project |
John S Reid |
ADAP
|
06 Oct 2015 |
4821-v1 |
Plan for PA test at 76/106 MHz |
Joseph E. Dey et al. |
PIP
|
30 Apr 2015 |
4753-v1 |
PIP Status Report Meeting |
Ken Domann et al. |
Booster
PIP
|
02 Feb 2015 |
4718-v1 |
PIP Status Report Meeting |
Ken Domann et al. |
PIP
HLRF
|
25 Nov 2014 |
4712-v1 |
PIP Status Report Meeting |
Ryan Crawford et al. |
Booster
PIP
Linac
|
19 Nov 2014 |
4651-v1 |
PIP General Info |
William A Pellico et al. |
PIP
|
14 Aug 2014 |
4620-v1 |
PIP Status Report Meeting |
William A Pellico et al. |
Booster
PIP
HLRF
|
20 Jun 2014 |
4550-v2 |
Booster RF System Upgrades for 15 Hz Operation |
John S Reid et al. |
Upgrades
Accelerator Seminar
|
04 Mar 2014 |
4266-v1 |
Refurbished Booster RF |
John S Reid |
Booster
Upgrades
PIP
HLRF
|
21 Dec 2012 |
4241-v1 |
Refurbished Booster RF |
John S Reid |
PIP
HLRF
|
24 Oct 2012 |
4197-v1 |
New Ferrite Testing for Booster Tuners |
Dennis Barak et al. |
PIP
HLRF
|
15 Aug 2012 |
4180-v1 |
Second Refurbished Booster RF Cavity for 15Hz |
John S Reid |
PIP
HLRF
|
18 Jul 2012 |
4084-v1 |
First Refurbished Booster RF Cavity for 15Hz |
John S Reid |
Booster
PIP
HLRF
|
07 Mar 2012 |
3749-v2 |
Proton Source Workshop RF Presentation |
John S Reid |
HLRF
|
08 Dec 2010 |
3197-v1 |
2nd Meeting on the Feasibility of a Muon g-2 Experiment at FNAL |
Keith E Gollwitzer et al. |
Upgrades
|
04 Sep 2008 |
2883-v1 |
Booster RF Repetition Rate Limit |
Robert J. Ducar et al. |
Projects
Proton Plan
Upgrades
HLRF
|
26 Sep 2007 |
2317-v4 |
Main Injector HLRF Anode Limit Program & Cavity Tuner RF Voltage Limit |
Tim G. Berenc et al. |
RF
Proton Plan
HLRF
|
14 Sep 2006 |
2311-v2 |
Main Injector RF Power Calculations for the Proton Plan |
Tim G. Berenc et al. |
RF
Proton Plan
HLRF
|
30 Jun 2006 |
841-v7 |
Pbar acceleration in MI using 2.5 MHz and 53 MHz rf Systems |
Chandrashekhara M. Bhat et al. |
RF
Controls
HLRF
Studies
LLRF
Longitudinal Dynamics
HLRF
Beam Dynamics
|
07 Nov 2005 |
1477-v2 |
Projects in the Accelerator Division suited for University collaboration |
William J. Ashmanskas et al. |
SDA
|
15 Dec 2004 |
1196-v1 |
Tev RF Noise Measurements |
John S Reid |
HLRF
|
08 Jun 2004 |
864-v3 |
Pbar acceleration in the MI using 2.5 MHz and 53 MHz rf Systems |
Chandrashekhara M. Bhat et al. |
Operations
HLRF
Studies
Project
LLRF
|
09 Oct 2003 |