142-v1 |
Vacuum System Design and Performance Calculations for Phase 1 of the 5 MeV Electron Cooling Test Beam Facility |
Gerald P. Jackson |
Vacuum
Vacuum
Design Properties
Studies
|
01 Jul 2003 |
378-v1 |
The Recycler Ring Vacuum: A Comprehensive Report |
Terry G. Anderson et al. |
Vacuum
|
20 Jun 2003 |
385-v1 |
Notes for MI/RR Group Meeting of 21 October 2002 |
Bruce C. Brown et al. |
MI-RR-Group
Stochastic Cooling
Studies
|
14 Jan 2003 |
356-v1 |
Analysis of the Beam Loss Observed During the October 12, 2000 Main Injector Deceleration Studies |
Gerald P. Jackson |
Studies
Beam Dynamics
|
23 Oct 2000 |
329-v1 |
Recycler Commissioning Plan |
Gerald P. Jackson |
Commissioning
Studies
|
11 Nov 1998 |
326-v1 |
Measurement of Oscillatory Modes in the Recycler Gradient Magnet Hangers: First RGF at Location 628D |
Consolato Gattuso et al. |
Magnets
|
26 May 1998 |
328-v1 |
Transient Measurement of the Betatron Phase Advance Around the Recycler Ring |
Gerald P. Jackson |
Lattice
Controls
Beam Instrumentation
|
16 May 1998 |
325-v1 |
Specifications for the Line-of-Sight Laser-Based Signal Transmission of the Recycler Stochastic Cooling Systems |
Gerald P. Jackson |
Stochastic Cooling
|
04 May 1998 |
324-v2 |
Specifications for the TE01 Signal Transmission of the Recycler Stochastic Cooling Systems |
Gerald P. Jackson |
Stochastic Cooling
Beam Dynamics
|
04 May 1998 |
310-v1 |
Options for Line-of-Sight Signal Transmission of the Recycler Stochastic Cooling Systems |
Gerald P. Jackson |
Stochastic Cooling
Magnets
|
27 Oct 1997 |
172-v1 |
Stochastic Cooling of the Recycler Antiproton Stack Momentum Spread Including Intrabeam Scattering and Barrier Buckets |
Gerald P. Jackson |
Stochastic Cooling
|
29 Mar 1996 |
145-v2 |
Outline of the 5 MeV Electron Test Beam Project |
Gerald P. Jackson |
Electron Cooling
Electron Cooling
|
21 Aug 1995 |
143-v1 |
Design Specifications for the 90o Dipoles for the Recycler Ring Electron Cooling Beamline |
Gerald P. Jackson |
Magnets
Electron Cooling
Magnets
|
14 Aug 1995 |
137-v1 |
Design of the Beam Profile Monitor for Phase 1 of the 5 MeV Electron Cooling Test Beam Facility |
Gerald P. Jackson |
Beam Instrumentation
|
11 Aug 1995 |