8194-v2 |
MTCA.4 Demonstration and Reference Design Project |
Craig C Drennan |
Instrumentation
|
19 Nov 2020 |
6811-v6 |
AD/Instrumentation Status Meeting Minutes and Slides |
Craig C Drennan |
PXIE
Beam Instrumentation
Beam Instrumentation
FAST
Beam Instrumentation
Monitoring Instrumentation
Instrumentation
Beamline
Beam Instrumentation
IOTA
|
04 May 2020 |
5322-v7 |
Sequenced Chassis Control Card, Linac Marx Modulator System Specification |
Craig C Drennan et al. |
Upgrades
|
07 Apr 2020 |
7799-v1 |
Material for Introduction to Digital Logic |
Craig C Drennan |
Talks
|
01 Nov 2019 |
2523-v1 |
Booster Beam Loss Monitor Upgrade Specification |
Craig C Drennan |
Front-end Systems
Beam Instrumentation
|
16 Oct 2019 |
7576-v1 |
PCB Review: 1 GSPS VME ADC DAC Damper Controller |
Craig C Drennan et al. |
Booster
Instrumentation
|
23 Sep 2019 |
7025-v2 |
DAQ Modernization Discussions |
Craig C Drennan |
Instrumentation
Controls
|
16 Sep 2019 |
6997-v1 |
AD Instrumentation Photos |
Craig C Drennan |
Instrumentation
|
14 Feb 2019 |
6973-v2 |
Documentation for the Universal Clock Decoder discussions of support and updates. |
Craig C Drennan |
Controls
Hardware
Front-end Systems
Controls
Magnets
Controls
Data Acquisition
BPM
Controls
Power Supplies
Power Supplies
|
31 Jan 2019 |
6955-v1 |
IOTA BPM System Meetings |
Craig C Drennan |
Instrumentation
BPM
|
21 Jan 2019 |
6868-v1 |
Service Building Clean Up Photos |
Craig C Drennan |
External Beams
|
26 Nov 2018 |
6261-v1 |
Meeting Minutes, PIP-II Machine Protection System -- System Design |
Craig C Drennan |
Instrumentation
|
15 Apr 2018 |
6058-v4 |
Meetings: AD/Instruments Department Meeting |
Craig C Drennan |
Instrumentation
|
26 Mar 2018 |
6231-v1 |
Meeting Minutes, PIP II-IT Discussion and Requests for Work During the March Run |
Craig C Drennan |
Instrumentation
|
20 Mar 2018 |
6189-v2 |
Meeting Minutes, PIP-II Machine Protection Introduction to Computing Division |
Craig C Drennan |
PXIE
|
12 Mar 2018 |
6183-v1 |
Meeting Minutes, IPM Development Status |
Craig C Drennan |
Ion Profile Monitor
Main Injector
|
07 Mar 2018 |
6049-v4 |
LBNF Hadron Monitor Notes |
Craig C Drennan |
Ion Profile Monitor
|
24 Jan 2018 |
4884-v2 |
Data Transfer Protocol for the USB to FIFO Interface |
Craig C Drennan et al. |
LLRF
|
30 Nov 2017 |
5804-v2 |
LLRF Controls Settings |
Craig C Drennan |
LLRF
|
30 Nov 2017 |
3891-v15 |
VME-DDS Frequency and Phase Control Module |
Craig C Drennan |
LLRF
|
30 Nov 2017 |
5307-v4 |
New Booster LLRF DDS -- ACNET Parameters and Curve Application Notes |
Craig C Drennan et al. |
LLRF
|
13 Nov 2017 |
5864-v1 |
Booster BPM Upgrade 2014 to 2017 |
Craig C Drennan |
Beam Instrumentation
|
24 Oct 2017 |
5334-v1 |
Collection of Booster Synchronization Documents |
Craig C Drennan |
LLRF
|
03 Mar 2017 |
5273-v1 |
Booster Acceleration Phase Lock Controller |
Craig C Drennan |
LLRF
Operations
|
15 Nov 2016 |
4411-v7 |
Booster LLRF System Block Diagram |
Craig C Drennan |
LLRF
|
14 Nov 2016 |
4964-v2 |
Cogging Test Switch |
Craig C Drennan |
LLRF
|
23 Jun 2016 |
5166-v1 |
VME DDS Frequency Curves |
Craig C Drennan |
LLRF
|
25 May 2016 |
5150-v1 |
Phase Changes to A RF and B RF at Transition |
Craig C Drennan |
LLRF
|
04 May 2016 |
4459-v2 |
Booster Paraphase Curve Generator VXI Module |
Craig C Drennan |
LLRF
|
17 Feb 2016 |
4781-v2 |
Booster to Main Injector Phase-Lock Controller |
Craig C Drennan |
LLRF
|
16 Nov 2015 |
4936-v1 |
Early Injection studies -- Frequency Trigger OR'ing Module |
Craig C Drennan |
LLRF
|
28 Aug 2015 |
4935-v1 |
Acceleration Gate Module |
Craig C Drennan |
LLRF
|
28 Aug 2015 |
4827-v5 |
XFR Modification to Resetting Beam Sync (AA) and Offset Beam Sync (OAA) |
Craig C Drennan |
LLRF
RF
LLRF
RF
Operations
LLRF
|
05 Jun 2015 |
3696-v2 |
Installation, Timing and Gating Details for BPMs In the Booster and 400 MeV Line |
Craig C Drennan |
Beam Instrumentation
|
22 Apr 2014 |
4414-v5 |
Booster Longitudinal Damper System Block Diagram -- Draft for Review |
Craig C Drennan |
LLRF
Beam Dynamics
|
03 Mar 2014 |
4413-v1 |
Booster LLRF VXI DSP Module 2013 |
Craig C Drennan |
LLRF
|
15 Jul 2013 |
4153-v5 |
Booster Main Injector Phase Lock Divide-By-32 Phase Error Trajectory Method |
Craig C Drennan |
LLRF
|
18 Jun 2013 |
4367-v1 |
Booster Cogging Teststand Notes |
Craig C Drennan et al. |
Operations
|
10 May 2013 |
3723-v13 |
Booster Beam Loss Monitor Integrator and Data Acquisition Upgrade |
Craig C Drennan |
Beam Instrumentation
Front-end Services
Operations
|
17 Apr 2013 |
2757-v3 |
Updating Calibration Values in the Booster BPM System |
Craig C Drennan |
Upgrades
BPM
|
02 Apr 2013 |
4198-v1 |
Booster Cogging Teststand Progress -- PIP Presentation |
Craig C Drennan et al. |
LLRF
Upgrades
PIP
|
20 Aug 2012 |
3367-v1 |
Characterization of the Fast Phase Detector in the Booster LLRF System |
Craig C Drennan |
Controls
LLRF
Operations
|
24 Jul 2012 |
3889-v3 |
Linac Beam Velocity Measurement |
Craig C Drennan |
Front-end Systems
Controls
Beam Instrumentation
Operations
Beam Instrumentation
Operations
|
24 Jul 2012 |
3922-v2 |
Booster Dual Phase Detector Module for MI Phase Lock Control |
Craig C Drennan |
LLRF
|
17 Jul 2012 |
3940-v1 |
Linac Toroid Upgrade Meeting Summaries -- Sept, 2, 2011 -- Oct. 27, 2011 |
Craig C Drennan |
Front-end Systems
Intensity Measurements
Beam Instrumentation
|
16 Jul 2012 |
4103-v1 |
PIP Presentation on Booster Main Injector Phase Lock |
Craig C Drennan |
LLRF
PIP
|
28 Mar 2012 |
4023-v1 |
Booster BPM, Daughter Trigger Generator Adjustments |
Craig C Drennan |
Beam Instrumentation
|
14 Dec 2011 |
3770-v2 |
Meeting Minutes: Linac and 400 MeV Beam Position Monitor Upgrade |
Craig C Drennan et al. |
Beam Instrumentation
|
23 Nov 2011 |
3950-v4 |
Booster BLM Upgrade -- Presentation Slides |
Craig C Drennan |
Front-end Systems
Beam Instrumentation
ACNET
|
07 Nov 2011 |
3789-v2 |
NTF BPM: Note on the New BPM Installation In the NTF Beam Line |
Craig C Drennan |
NTF
|
06 Oct 2011 |
3948-v2 |
Toroid Requirements in the Linac |
Craig C Drennan et al. |
Beam Instrumentation
|
20 Sep 2011 |
3801-v4 |
Beam Position Monitor Requirements in the Linac and 400 MeV Line |
Craig C Drennan |
Upgrades
Beam Instrumentation
|
12 Sep 2011 |
3890-v1 |
Booster BLM and BPM upgrade Meeting Minutes, Fall 2010 |
Craig C Drennan |
Front-end Systems
Beam Instrumentation
|
29 Jun 2011 |
3795-v1 |
Booster BLM Tests on BLMS06 |
Craig C Drennan |
Beam Instrumentation
|
17 Mar 2011 |
3780-v1 |
Interfacing to the Booster BLM Upgrade Integrator/Digitizer VME Module |
Craig C Drennan |
Beam Instrumentation
|
17 Feb 2011 |
3767-v1 |
Meeting Minutes: Linac Multi-Wires in the Momentum Dump Line |
Craig C Drennan |
Upgrades
Operations
Beam Instrumentation
Studies
Linac
|
05 Jan 2011 |
3730-v3 |
Linac and Booster Beam Diagnostics |
Craig C Drennan |
Beam Instrumentation
Beam Instrumentation
|
07 Dec 2010 |
3644-v1 |
Microsoft Project for Booster LLRF Upgrade Schedule and Effort |
Craig C Drennan |
LLRF
|
21 Jul 2010 |
3643-v1 |
Examination of BGA and LGA Connections on the Booster LLRF DDS Module Prototype |
Craig C Drennan |
LLRF
|
21 Jul 2010 |
3642-v1 |
Booster Wire Scanner Integrator |
Craig C Drennan |
Beam Instrumentation
|
20 Jul 2010 |
1410-v10 |
BLM Upgrade Users' Guide |
Alan Baumbaugh et al. |
Beam Instrumentation
Beam Instrumentation
Beam Loss Monitors (BLM)
Instrumentation
TeV ABORT
|
21 Jun 2010 |
3604-v1 |
Configuring the Booster LLRF System for Testing New Frequency and Phase Control Components |
Craig C Drennan |
LLRF
|
04 May 2010 |
3486-v6 |
Installation Planning for BPM-HRM Booster DAQ Extension |
Craig C Drennan |
Beam Instrumentation
|
14 Dec 2009 |
3214-v2 |
Booster Bunch Length Monitor |
Craig C Drennan |
Beam Instrumentation
|
26 Oct 2009 |
3368-v7 |
Booster Corrector Installation Data -- Shutdown 2009 |
Craig C Drennan |
Controls
Power Supplies
|
10 Sep 2009 |
3425-v1 |
Booster LLRF Electronics Upgrade -- Electronic Design Efforts, April 2009 |
Craig C Drennan |
LLRF
|
21 Jul 2009 |
2762-v5 |
Penetrations for Corrector Cables |
Craig C Drennan |
Power Supplies
|
29 Apr 2009 |
2974-v2 |
Mathematical Description of the Booster LLRF Controls |
Craig C Drennan |
Controls
LLRF
|
15 Apr 2009 |
2828-v4 |
Requirements for the Booster LLRF DDS Module |
Craig C Drennan et al. |
Hardware
LLRF
|
15 Apr 2009 |
3366-v1 |
Collection of Published Papers for the Booster Corrector Upgrade |
Craig C Drennan |
Booster
|
13 Apr 2009 |
3315-v2 |
Choices for Instrumenting Booster Corrector RTD's |
Craig C Drennan |
Controls
Operations
|
24 Feb 2009 |
3230-v1 |
Examination of the Booster Short Straight Corrector Prototype Installation |
Craig C Drennan |
Upgrades
|
20 Oct 2008 |
3205-v4 |
Pulse Stretcher Application For Measuring BDot Coils on Booster MP02 Current |
Craig C Drennan |
Beam Instrumentation
Booster
|
29 Sep 2008 |
2863-v2 |
Conversion Between New Booster Correctors and Old |
Craig C Drennan |
Operations
Power Supplies
|
02 Oct 2007 |
2859-v11 |
Booster Corrector Installation Data -- Shutdown 2007 |
Craig C Drennan |
Controls
Upgrades
Power Supplies
|
19 Sep 2007 |
1881-v5 |
SPECIFICATION FOR THE BOOSTER CORRECTOR MAGNETS AND POWER SUPPLIES |
Craig C Drennan |
Controls
|
19 Jul 2007 |
2792-v7 |
Minutes of the Booster Corrector Prototype Test Planning Meeting |
Craig C Drennan |
Upgrades
|
05 Jul 2007 |
2804-v1 |
Proton Plan Booster Corrector Upgrade -- Directors Review Aug. 2006 |
Craig C Drennan |
Upgrades
|
11 Jun 2007 |
2632-v3 |
Coordinate System for New Booster Corrector Magnet System |
Craig C Drennan et al. |
Controls
Upgrades
Beam Dynamics
Operations
|
30 May 2007 |
2791-v1 |
System Overview for the Multi-element Corrector Magnets and Controls for the Fermilab Booster. |
Craig C Drennan |
Upgrades
|
29 May 2007 |
1883-v2 |
Booster Floor Plan Markup for New Corrector System |
Craig C Drennan |
Power Supplies
|
14 May 2007 |
2773-v3 |
Booster Corrector Power Cable Installation Details |
Craig C Drennan |
Power Supplies
|
14 May 2007 |
2734-v2 |
Booster Long Straight Corrector Package Installation |
Craig C Drennan |
Upgrades
|
24 Apr 2007 |
2718-v1 |
March 27, 2007 Booster Corrector Status for DOE Review |
Craig C Drennan |
Upgrades
|
27 Mar 2007 |
2700-v1 |
Transformer Test Results BMA001 |
Craig C Drennan |
Operations
|
19 Mar 2007 |
2520-v3 |
Booster Corrector Magnet -- Measurement of Mutual Inductance |
Craig C Drennan |
Beam Dynamics
|
20 Oct 2006 |
1882-v4 |
New Booster Corrector Magnet Power Amplifier Controls Specification |
Craig C Drennan |
Power Supplies
|
16 Aug 2006 |
1127-v2 |
TeV BLM Test Card Review Docs |
Craig C Drennan |
Beam Loss Monitors (BLM)
Instrumentation
TeV ABORT
|
16 Apr 2004 |