8630-v1 |
PSP/TaskForce meeting held on 13 Aug 2020 |
Phil Adamson et al. |
AD Task Force
Proton Source Planning
|
14 Aug 2020 |
2618-v1 |
First Results from MI8 Collimator Use |
Phil Adamson et al. |
Transfer Lines
ES&H
Collimation
Studies
|
22 May 2020 |
7540-v1 |
Radiation Studies for Main Injector Activation Using MARS in a `Toy Model' |
Phil Adamson et al. |
Main Injector
Beam Physics
|
09 Aug 2019 |
6174-v1 |
LHC Operation and Status |
Phil Adamson |
Accelerator Seminar
|
05 Mar 2018 |
5657-v1 |
Crystal assisted manipulation of high energy beam - Walter Scandale |
Phil Adamson |
Accelerator Seminar
|
11 Aug 2017 |
5549-v1 |
The European XFEL - Alignment Work and Geodetic Control Network Adjustment |
Phil Adamson |
Accelerator Seminar
|
10 Jul 2017 |
4854-v7 |
Modified Running Scenarios for the g-2 and Mu2e Experiments |
Phil Adamson et al. |
Mu2e
g-2
|
18 Jun 2015 |
4811-v3 |
700 kW operations for NOvA |
Phil Adamson |
Accelerator Seminar
|
14 May 2015 |
4244-v1 |
Meeting Notes from RR BPM System -- November 1, 2012 |
Phil Adamson et al. |
BPM
Beam Instrumentation
BPM
|
01 Nov 2012 |