8708-v2 |
Booster Physics/Operations Group Telework Report-20200930 |
Chandrashekhara M. Bhat et al. |
Booster
|
01 Oct 2020 |
8705-v2 |
Booster Physics/Operations Group Telework Report-20200806 |
Chandrashekhara M. Bhat et al. |
Beam Instrumentation
Booster
Other
Beam Dynamics
Studies
Extraction Lattice
Collimation
|
01 Oct 2020 |
8621-v1 |
Booster Physics/Operations Group Telework Report-20200806 |
Chandrashekhara M. Bhat et al. |
Booster
|
13 Aug 2020 |
8266-v6 |
E4R test Facility |
David E. Johnson |
Upgrades
|
10 Jul 2020 |
8545-v1 |
Booster Physics/Operations Group Telework Report-20200702 |
Chandrashekhara M. Bhat et al. |
Beam Instrumentation
Booster
Upgrades
Beam Dynamics
Operations
Extraction Lattice
Collimation
Other
Studies
|
06 Jul 2020 |
1926-v2 |
Reducing Losses in Main Injector by MI8 Line Scraping |
Bruce C. Brown et al. |
Transfer Lines
Studies
Collimation
Electron Cooling
|
18 May 2020 |
80-v1 |
Kicker Operating Margins |
David E. Johnson |
Magnets
Magnets
|
28 Feb 2020 |
79-v1 |
Beamline Power Supply Ripple and Regulation Specifications |
David E. Johnson |
Transfer Lines
Power Supplies
|
28 Feb 2020 |
11-v1 |
MI-14 Beamlines Solutions for TeV Injection, Slow Extraction, Pbar Production, and Pbar Injection |
David E. Johnson |
Extraction
Transfer Lines
Beam Transfer
|
07 Feb 2020 |
8-v1 |
A 150 GeV MI_11 to Tevatron Beamline Solution |
David E. Johnson |
Transfer Lines
|
07 Feb 2020 |
314-v1 |
Recycler Dump Magnet Requirements |
David E. Johnson et al. |
Magnets
Magnets
|
26 Sep 2019 |
6925-v1 |
PSP Meeting held on 21 Dec 2018 |
David E. Johnson et al. |
Proton Source Planning
|
21 Dec 2018 |
6330-v1 |
Fermilab Workshop on Megawatt Rings & IOTA/FAST Collaboration Meeting (Day 1) |
Chandrashekhara M. Bhat et al. |
PIP
|
09 May 2018 |
5352-v2 |
Laser Notcher status 3-22-17 |
David E. Johnson |
PIP
|
22 Mar 2017 |
5272-v1 |
Answers to Reviewer Questions |
David E. Johnson |
PIP
|
22 Nov 2016 |
5268-v2 |
July Commissioning and Upgrade palns |
David E. Johnson |
PIP
|
22 Nov 2016 |
5267-v1 |
Pulse Formation and Fiber System |
David E. Johnson |
PIP
|
22 Nov 2016 |
5266-v2 |
Overall Design of Laser Notcher System |
Kevin Duel et al. |
PIP
|
22 Nov 2016 |
5265-v1 |
Welcome / Charge / Motivation |
Fernanda G Garcia et al. |
PIP
|
22 Nov 2016 |
5262-v1 |
PIP Status Report Meeting |
David E. Johnson et al. |
PIP
|
28 Oct 2016 |
5254-v1 |
Laser Nothcher Status 10-19-2016 |
David E. Johnson et al. |
Projects
PIP
|
19 Oct 2016 |
5240-v1 |
PIP Status Report Meeting |
Trevor A Butler et al. |
PIP
|
28 Sep 2016 |
5239-v1 |
PIP Status Report Meeting |
Matthew H Gardner et al. |
PIP
|
27 Sep 2016 |
5206-v1 |
PIP Status Report Meeting |
David E. Johnson et al. |
PIP
Linac
|
11 Aug 2016 |
5097-v2 |
Laser Notcher Status |
David E. Johnson |
Projects
Projects
PIP
|
02 Mar 2016 |
5060-v1 |
PIP Status Report Meeting |
Chandrashekhara M. Bhat et al. |
PIP
|
01 Feb 2016 |
5013-v2 |
Workshop on Booster Performance and Enhancements 23 Nov - 24 Nov |
Chandrashekhara M. Bhat et al. |
PIP
|
09 Dec 2015 |
4920-v1 |
PIP Status Report Meeting |
Ryan Crawford et al. |
Booster
PIP
Linac
|
12 Aug 2015 |
4820-v1 |
PIP Status Report Meeting |
Ryan Crawford et al. |
PIP
|
29 Apr 2015 |
4738-v2 |
Laser Notcher Demonstration Experiment |
Matthew H Gardner et al. |
PIP
|
14 Jan 2015 |
4733-v1 |
Impact of Laser Notcher on Radiation in MEBT |
David E. Johnson |
Projects
ES&H
|
22 Dec 2014 |
4724-v1 |
PIP Status Report Meeting |
David E. Johnson |
PIP
Linac
|
10 Dec 2014 |
4712-v1 |
PIP Status Report Meeting |
Ryan Crawford et al. |
Booster
PIP
Linac
|
19 Nov 2014 |
4711-v1 |
Laser Notcher Pulse Energy Requirements & Demonstration Experiment |
David E. Johnson et al. |
Upgrades
PIP
|
19 Nov 2014 |
4683-v3 |
Booster Injection in PIP-II Era An Update |
David E. Johnson |
Upgrades
|
14 Oct 2014 |
4660-v8 |
PIP Status Report Meeting |
David Augustine et al. |
PIP
|
20 Aug 2014 |
4661-v2 |
PIP Shutdown Meeting - Laser Notcher Status |
David E. Johnson |
Upgrades
Booster
|
20 Aug 2014 |
4649-v5 |
PIP Linac Notcher - September Readiness Review |
Jean-Paul Carneiro et al. |
Upgrades
PIP
|
13 Aug 2014 |
4537-v2 |
Linac Laser Notcher Project in the Proton Improvement Plan |
Kevin Duel et al. |
Pre-Accelerator
Booster
Accelerator Seminar
Linac
|
01 Apr 2014 |
4441-v1 |
Laser Notcher Status 9_11_2013 |
David E. Johnson et al. |
Upgrades
|
11 Sep 2013 |
4306-v1 |
Linac Laser Notcher Status |
David E. Johnson |
Projects
PIP
|
28 Jun 2013 |
4237-v2 |
Linac Laser Notcher Status |
David E. Johnson et al. |
PIP
|
08 Oct 2012 |
4166-v1 |
Laser Notcher Status |
David E. Johnson |
Projects
PIP
|
27 Jun 2012 |
3996-v2 |
Booster Laser Notcher Proposal |
David E. Johnson et al. |
PIP
|
16 Nov 2011 |
3947-v1 |
Booster Laser Notcher Options |
David E. Johnson |
Upgrades
PIP
|
20 Sep 2011 |
3946-v1 |
Laser Notcher for Booster |
David E. Johnson |
PIP
|
19 Sep 2011 |
3899-v1 |
Booster Laser Profile Monitor |
David E. Johnson |
Beam Instrumentation
|
07 Jul 2011 |
3664-v1 |
Alternative siting for the g -2 experiment |
David E. Johnson |
Projects
|
02 Sep 2010 |
3576-v2 |
Radiation Shielding Tests for Laser Power Supply |
David E. Johnson |
Beam Instrumentation
Project X
|
18 Mar 2010 |
2330-v1 |
Beam collimation in the Main Injector at Slip-Stacking Injection |
Bruce C. Brown et al. |
Project
Collimation
|
09 Jan 2009 |
2329-v1 |
Beam Loss Simulation in the Main Injector at Slip-Stacking Injection |
Bruce C. Brown et al. |
Project
Collimation
|
09 Jan 2009 |
2597-v4 |
Conceptual Design Report of 8GeV H- Transport and Injection |
David E. Johnson |
Proton Driver
|
14 Nov 2008 |
3197-v1 |
2nd Meeting on the Feasibility of a Muon g-2 Experiment at FNAL |
Keith E Gollwitzer et al. |
Upgrades
|
04 Sep 2008 |
3186-v3 |
Compare proton vs H- Multiturn Injection |
David E. Johnson |
Project X
|
15 Aug 2008 |
3152-v2 |
Geometry Considerations for the Project X Injection Absorber |
David E. Johnson |
Project X
|
07 Jul 2008 |
3143-v2 |
Project X Transport & Injection: Foil and Laser Stripping R&D Kick-off Meeting |
David E. Johnson |
Project X
|
30 Jun 2008 |
3129-v3 |
Project X Transport & Injection: Injection Painting R&D Kick-off Meeting |
David E. Johnson |
Project X
|
27 Jun 2008 |
3128-v3 |
Specifications for the Project X Injection Absorber |
David E. Johnson |
Project X
|
23 Jun 2008 |
3125-v1 |
Project X Absorber and Collimation RnD kick-off Meeting |
David E. Johnson |
Project X
|
20 Jun 2008 |
1930-v1 |
Un-suppressing MI30 dispersion function for momentum scraping |
David E. Johnson et al. |
Operations
Lattice
Collimation
|
22 Apr 2008 |
1960-v1 |
Potential MI Collimation Scheme with MI30 Dynamic Dispersion Insert |
David E. Johnson |
Lattice
Collimation
|
22 Apr 2008 |
2261-v2 |
Potential Collimation Scheme using a Dynamic Dispersin Bump In MI30 Straight |
David E. Johnson |
Lattice
Collimation
|
22 Apr 2008 |
2316-v1 |
Thoughts on Collimation |
David E. Johnson |
Other
Collimation
|
22 Apr 2008 |
2315-v3 |
Dynamic Dispersion for Main Injector Collimation |
David E. Johnson |
Lattice
Collimation
|
22 Apr 2008 |
2769-v1 |
Results of pre-WQB installation Lambertson Scans |
David E. Johnson et al. |
Lattice
Transfer Lines
Alignment
|
04 May 2007 |
2678-v1 |
Delivering Protons to the Antiproton Source after the Tevatron Collider Era |
Chuck Ankenbrandt et al. |
Recycler
Future Accelerators
NuMI
Main Injector
Antiproton Source
|
06 Mar 2007 |
2363-v1 |
Modifications to Main Injector Lattice to Create Symmetric Straight Section for H- injection |
David E. Johnson |
Proton Driver
|
26 Sep 2006 |
2366-v1 |
Dave Johnson's Report |
David E. Johnson |
Instrumentation/beam Physics
|
26 Jul 2006 |
2231-v1 |
Thoughts on Recycler Transfer lines in the Proton Stacker Era |
David E. Johnson |
Transfer Lines
|
13 Apr 2006 |
2219-v1 |
Proton Driver H- transport and injection |
David E. Johnson |
Proton Driver
|
30 Mar 2006 |
2121-v1 |
SNS visit |
David E. Johnson |
Proton Driver
Transfer Lines
|
28 Mar 2006 |
2187-v1 |
Specifications for the Proton Driver Injection Absorber |
David E. Johnson |
Proton Driver
Other
|
07 Mar 2006 |
2172-v1 |
Recycler and MI Momentum Aperture |
David E. Johnson |
Studies
Studies
SNuMi
|
24 Feb 2006 |
1940-v3 |
Mask at MI Q301 |
David E. Johnson |
Operations
|
02 Sep 2005 |
1938-v1 |
Impact of beam loss in MI 30 Straight Section on ECOOL |
David E. Johnson |
Operations
|
23 Aug 2005 |
1540-v1 |
Defining a Recycler "Golden" Closed Orbit |
David E. Johnson |
Operations
|
25 Jan 2005 |
1387-v3 |
Thoughts on SY120 Operation in FY'05 |
David E. Johnson |
SY120
|
01 Nov 2004 |
1316-v1 |
SY120 Mixed-mode Operation |
David E. Johnson |
Transfer Lines
Transfer Lines
SY120
|
24 Aug 2004 |
1298-v1 |
Examination of Accumulator to Recycler Transfers |
David E. Johnson |
Operations
|
06 Aug 2004 |
1272-v0 |
Installation Coordinates of Electron Cooling Insert in the Recycler Ring |
David E. Johnson |
Alignment
|
27 Jul 2004 |
1242-v2 |
Potential Optical Solutions For Pbar Stacking and SY120 Mixed-Mode Operation |
David E. Johnson |
SY120
|
07 Jul 2004 |
1157-v1 |
Redefining MI 8 GeV Energy, a Proposal |
David E. Johnson |
Operations
|
04 May 2004 |
1140-v1 |
Redefining MI 8 GeV Energy to Maximize Pbar Production |
David E. Johnson |
Operations
Operations
|
23 Apr 2004 |
1120-v1 |
SY120Jamboree: Resonant Extraction Status and Plans |
David E. Johnson |
SY120
|
13 Apr 2004 |
1102-v2 |
Operational Status of Resonant Extraction |
David E. Johnson |
Extraction
|
01 Apr 2004 |
853-v1 |
Status of MI Resonant Extraction |
David E. Johnson |
Extraction
|
30 Sep 2003 |
754-v1 |
NuMI Extraction Comparison for Two and Three Kickers |
David E. Johnson |
Extraction
Extraction from Main Injector
|
13 Aug 2003 |
755-v1 |
Guidelines for MI60 Extraction with Three Kickers |
David E. Johnson |
Extraction
Extraction from Main Injector
|
13 Aug 2003 |
756-v2 |
NuMI Extraction Geometry with Current Main Injector Orbits, Quad Offsets, and Correctors |
David E. Johnson |
Operations
Extraction from Main Injector
|
13 Aug 2003 |
169-v1 |
Recycler Pbar Transfer Lines |
David E. Johnson |
Transfer Lines
|
01 Aug 2003 |
759-v1 |
Beam Based Alignment of Recycler Chromaticity Sextupoles |
David E. Johnson |
Alignment
|
01 Aug 2003 |
753-v1 |
NuMI Extraction Lambertson Configuration at MI60 |
David E. Johnson |
Extraction
Extraction from Main Injector
|
31 Jul 2003 |
179-v2 |
Magnetic Field Quality Specification for Recycler Ring Combined Function and Quadrupole Magnets |
Norman M. Gelfand et al. |
Magnets
Studies
|
23 Jul 2003 |
725-v2 |
Dispersion Matching into the Tevatron |
David E. Johnson et al. |
Transfer Lines
Optics
Beam Transfer
|
12 Jul 2003 |
728-v1 |
MI60 Quad Offsets for NuMI |
David E. Johnson |
Primary Proton Beam
Installation
Alignment
Alignment
|
11 Jul 2003 |
213-v1 |
Main Injector and Beamline Naming Conventions |
David E. Johnson et al. |
Lattice
Controls
Civil
|
08 Jul 2003 |
199-v1 |
Lambertson Final Design Review Responses |
David E. Johnson |
Magnets
Design Properties
Magnets
|
08 Jul 2003 |
77-v1 |
Instrumentation Requirements for the Fermilab Main Injector |
David E. Johnson |
Beam Instrumentation
Beam Dynamics
|
23 Jun 2003 |
752-v1 |
Proposed Main Injector Quad Offsets and Dipole Correctors Currents for the Current NuMI Extraction Geometry |
David E. Johnson |
Extraction
Extraction from Main Injector
|
10 Jun 2003 |
702-v1 |
Recycler Ring Lifetime and Emittance Growth |
Terry G. Anderson et al. |
Beam Dynamics
Vacuum
Stochastic Cooling
Commissioning
|
08 Aug 2001 |
366-v2 |
Recycler Ring Aperture Scan: Summary of Results |
Saeed Assadi et al. |
Studies
|
31 Dec 2000 |
355-v1 |
Recycler Corrector Status |
David E. Johnson |
Alignment
|
09 Sep 2000 |
348-v1 |
Transverse Placement of Gradient Magnets |
Bruce C. Brown et al. |
Alignment
Magnets
Alignment
|
08 May 2000 |
347-v1 |
Single Turn Extraction Design for NuMI |
David E. Johnson |
Civil Construction
Extraction
Extraction from Main Injector
Civil
Design Properties
|
06 Jan 2000 |
226-v1 |
Timing Requirements for the 8 GeV Proton Injector Kicker |
David E. Johnson |
Controls
|
02 Jun 1997 |
294-v1 |
Magnet Orientations in Beamlines |
David E. Johnson |
Transfer Lines
Alignment
Civil
Alignment
Magnets
|
30 May 1997 |
214-v1 |
MI Device and ACNET Names |
David E. Johnson et al. |
Controls
|
29 Oct 1996 |
202-v1 |
Main Injector Quad Length Ratios and Current vs Tune Parameters |
David E. Johnson |
Lattice
Magnets
Magnets
|
08 Jul 1996 |
171-v2 |
MI-10 Injection Layout |
David E. Johnson |
Transfer Lines
Civil
|
17 May 1996 |
133-v1 |
Recycler Ring Lattice Design with Combined Function Magnets |
David E. Johnson |
Magnets
Lattice
|
03 Mar 1995 |
132-v2 |
High Beta Insert for MI-like Ring |
David E. Johnson |
Optics
Lattice
|
22 Feb 1995 |
131-v1 |
Specifications for the Main Injector Horizontal Correction Elements |
David E. Johnson |
Magnets
Design Properties
Magnets
|
03 Sep 1993 |
83-v1 |
Location of Tevatron RF in the Main Injector Era and Clarification of the Tevatron F0 Geometry |
David E. Johnson |
RF
HLRF
|
14 May 1993 |
82-v1 |
Summary of the Existing MR Beam Diagnostics for Use in Main Injector |
Chandrashekhara M. Bhat et al. |
Beam Instrumentation
Beam Dynamics
|
01 Mar 1993 |
75-v1 |
Beamline Errors and Corrector Strengths |
David E. Johnson |
Magnets
Beam Dynamics
|
14 Aug 1992 |
55-v1 |
Desirable Tevatron F0 Straight Optics for 150 GeV Injection |
David E. Johnson et al. |
Transfer Lines
|
03 Apr 1991 |
26-v2 |
MI_15 Kicker Specifications |
David E. Johnson |
Extraction
Transfer Lines
Magnets
|
17 Apr 1990 |