8904-v1 |
RF system for Booster Accumulator Ring (BAR) |
Chandrashekhara M. Bhat |
Booster
|
15 Dec 2020 |
8735-v1 |
Booster Transition Crossing Study Plan |
Chandrashekhara M. Bhat |
Booster
|
24 Oct 2020 |
8711-v6 |
PSP/TaskForce meeting held on 08 Oct 2020 |
Chandrashekhara M. Bhat et al. |
AD Task Force
Booster
Proton Source Planning
|
14 Oct 2020 |
8708-v2 |
Booster Physics/Operations Group Telework Report-20200930 |
Chandrashekhara M. Bhat et al. |
Booster
|
01 Oct 2020 |
8705-v2 |
Booster Physics/Operations Group Telework Report-20200806 |
Chandrashekhara M. Bhat et al. |
Beam Instrumentation
Booster
Other
Beam Dynamics
Studies
Extraction Lattice
Collimation
|
01 Oct 2020 |
8675-v1 |
Specifications for the new Booster DCCT |
Chandrashekhara M. Bhat et al. |
AD Task Force
Proton Source Planning
|
15 Sep 2020 |
8621-v1 |
Booster Physics/Operations Group Telework Report-20200806 |
Chandrashekhara M. Bhat et al. |
Booster
|
13 Aug 2020 |
8579-v3 |
PSP/TaskForce meeting held on 16 Jul 2020 |
Chandrashekhara M. Bhat et al. |
AD Task Force
Proton Source Planning
|
12 Aug 2020 |
8576-v1 |
Longitudinal Beam Dynamics during Transition Crossing in Booster |
Chandrashekhara M. Bhat et al. |
Booster
Beam Dynamics
Studies
|
16 Jul 2020 |
8536-v2 |
Longitudinal Dynamics at Injection in Booster |
Chandrashekhara M. Bhat |
Beam Instrumentation
Booster
LLRF
Beam Dynamics
|
10 Jul 2020 |
8545-v1 |
Booster Physics/Operations Group Telework Report-20200702 |
Chandrashekhara M. Bhat et al. |
Beam Instrumentation
Booster
Upgrades
Beam Dynamics
Operations
Extraction Lattice
Collimation
Other
Studies
|
06 Jul 2020 |
8539-v1 |
PSP/TaskForce meeting held on 02 Jul 2020 |
Chandrashekhara M. Bhat et al. |
AD Task Force
Proton Source Planning
|
02 Jul 2020 |
8503-v1 |
The Curse of Transition Crossing in Synchrotrons |
Chandrashekhara M. Bhat et al. |
Booster
Beam Dynamics
Beam Physics
Main Injector
|
24 Jun 2020 |
8365-v1 |
PSP/TaskForce meeting held on 07 May 2020 |
Chandrashekhara M. Bhat et al. |
AD Task Force
Proton Source Planning
|
07 May 2020 |
8362-v2 |
Aspects of Longitudinal Beam Dynamics in the Booster: Beam Loss Mechanism and Mitigation |
Chandrashekhara M. Bhat |
LLRF
Upgrades
Beam Dynamics
Operations
HLRF
|
07 May 2020 |
4790-v1 |
Early Beam Injection in the Fermilab Booster & its Implementation Plan |
Chandrashekhara M. Bhat |
LLRF
Upgrades
Beam Dynamics
Operations
Studies
HLRF
|
04 May 2020 |
484-v1 |
Notes for MI/RR Group Meeting of 26 Feb 2003 |
Chandrashekhara M. Bhat et al. |
MI-RR-Group
RF
Beam Instrumentation
RF
BPM
|
23 Apr 2020 |
8176-v1 |
Booster Studies- Adiabatic Capture |
Chandrashekhara M. Bhat et al. |
Booster
Studies
|
02 Apr 2020 |
307-v2 |
Shielding Assessment of F0 to Switchyard Beam Line Enclosure for MI 120 GeV Beam Transport |
Chandrashekhara M. Bhat |
Transfer Lines
ES&H
Beam Dynamics
|
28 Feb 2020 |
106-v2 |
An Air-Cooled FMI Abort Dump? |
Chandrashekhara M. Bhat et al. |
Water
Design Properties
|
28 Feb 2020 |
7879-v2 |
The required number of wide bore cavities for PIPII |
Chandrashekhara M. Bhat et al. |
AD Task Force
Proton Source Physics
|
02 Jan 2020 |
7772-v1 |
PIP-II RF Studies: Frequency, Bias and Anode Curves for RF Cavity Testing at 20 Hz |
Chandrashekhara M. Bhat |
Studies
HLRF
|
23 Oct 2019 |
7763-v2 |
Proton Source 8-hr Studies (January-June, 2019) |
Chandrashekhara M. Bhat et al. |
Beam Instrumentation
LLRF
Upgrades
Beam Dynamics
Operations
Power Supplies
Studies
HLRF
|
22 Oct 2019 |
309-v2 |
Ground Water, Air-Borne and Soil Activation from the Operation of the MI-40 Beam Absorber During the FMI Era |
Chandrashekhara M. Bhat |
ES&H
|
26 Sep 2019 |
7643-v1 |
PSP/TaskForce meeting held on 12 Sep 2019 |
Chandrashekhara M. Bhat et al. |
AD Task Force
Proton Source Physics
|
16 Sep 2019 |
7631-v1 |
Foil Scattering Model for Fermilab Booster |
Chandrashekhara M. Bhat et al. |
Studies
|
12 Sep 2019 |
7622-v2 |
Beam Energy Spread in Booster at Injection |
Chandrashekhara M. Bhat |
Beam Physics
Operations
Studies
|
12 Sep 2019 |
7453-v1 |
Compilation of Measured Beam Emittance of the Booster from 2015-2019 |
Chandrashekhara M. Bhat |
Booster
Beam Dynamics
Other
Studies
|
04 Jul 2019 |
7376-v6 |
Recent Performance and Future Plans for the Fermilab Accelerator Complex |
Chandrashekhara M. Bhat |
Upgrades
|
23 Jun 2019 |
7207-v1 |
PSP Meeting held on 11 Apr 2019 |
Chandrashekhara M. Bhat et al. |
Proton Source Physics
|
11 Apr 2019 |
7091-v2 |
Booster RF Cavities for PIP-I+ and PIP-II (Functional Requirements Specification) |
Chandrashekhara M. Bhat |
Booster
PIP-Iplus
Projects
|
18 Mar 2019 |
7088-v2 |
Booster Wide Aperture D-Magnets for PIP-I+ and PIP-II (Functional Requirements Specification) |
Chandrashekhara M. Bhat |
Booster
PIP-Iplus
Projects
|
18 Mar 2019 |
7085-v2 |
Booster Intensity AIP for PIP-I+ (Functional Requirements Specification) |
Chandrashekhara M. Bhat |
Booster
Upgrades
PIP-Iplus
|
18 Mar 2019 |
7073-v1 |
PSP Meeting held on 14 March 2019 |
Yuri Alexahin et al. |
Proton Source Planning
|
14 Mar 2019 |
7046-v1 |
Longitudinal Beam Dynamics Issues at the Fermilab Booster |
Chandrashekhara M. Bhat |
Booster
LLRF
Beam Dynamics
Beam Physics
Operations
Studies
HLRF
|
07 Mar 2019 |
6967-v4 |
Booster DC studies: Adiabatic Beam Capture |
Chandrashekhara M. Bhat et al. |
Booster
LLRF
Beam Dynamics
Studies
HLRF
|
08 Feb 2019 |
6979-v1 |
PSP Meeting held on 31 Jan 2019 |
Chandrashekhara M. Bhat et al. |
Proton Source Planning
|
31 Jan 2019 |
6691-v1 |
65 MHz RF Cavity - Booster Damper Cavity |
Chandrashekhara M. Bhat et al. |
Booster
Upgrades
HLRF
|
06 Sep 2018 |
6017-v2 |
Pre-Review: PIP-I+ Booster Collimator |
Chandrashekhara M. Bhat |
Booster
PIP-Iplus
Collimation
|
21 Aug 2018 |
6619-v1 |
Booster adiabatic capture meeting |
Chandrashekhara M. Bhat et al. |
PIP
|
17 Aug 2018 |
6550-v1 |
PIP: Bunch length comparisons between operational, Bills and adiabatic paraphase curves |
Chandrashekhara M. Bhat et al. |
PIP
|
25 Jul 2018 |
6538-v1 |
Booster Beam Emittance Dependence on LINAC Beam Current |
Chandrashekhara M. Bhat et al. |
Booster
LAFS
|
22 Jul 2018 |
6306-v6 |
Booster Upgrades to Achieve ~MW Beam in the Fermilab Complex |
Chandrashekhara M. Bhat |
Booster
|
10 May 2018 |
6330-v1 |
Fermilab Workshop on Megawatt Rings & IOTA/FAST Collaboration Meeting (Day 1) |
Chandrashekhara M. Bhat et al. |
PIP
|
09 May 2018 |
6318-v1 |
Intensity AIP Project Plan |
Chandrashekhara M. Bhat et al. |
PIP-Iplus
|
03 May 2018 |
6153-v2 |
A New Clue for Early Losses in the Booster Beam Cycle |
Chandrashekhara M. Bhat et al. |
Longitudinal Dynamics
HLRF
|
02 Mar 2018 |
4568-v4 |
Longitudinal Beam Dynamics of the Booster Beam from Injection to Extraction Beam Studies and Simulations |
Chandrashekhara M. Bhat |
Booster
Upgrades
Beam Dynamics
Beam Physics
Operations
|
15 Nov 2017 |
5780-v1 |
Longitudinal Beam Tomography for the Booster Beam |
Chandrashekhara M. Bhat |
Beam Physics
Studies
|
09 Aug 2017 |
5762-v1 |
Beam based RF voltage measurements and Longitudinal beam tomography at the Fermilab Booster for Intensity Upgrade |
Chandrashekhara M. Bhat |
Studies
|
04 Aug 2017 |
5675-v1 |
Beam Emittance using MW in MI8 for two different LINAC beam Currents |
Chandrashekhara M. Bhat et al. |
Beam Physics
Studies
|
23 Jul 2017 |
5717-v1 |
2nd Harmonic RF for the Bunch Rotation in the Fermilab Booster |
Chandrashekhara M. Bhat |
Beam Physics
HLRF
|
24 Jul 2017 |
5366-v1 |
Intensity Dependence of Transition Crossing in the Booster |
Chandrashekhara M. Bhat |
Beam Physics
Studies
|
12 Apr 2017 |
5362-v2 |
Booster RF Voltage by Synchrotron Frequency Measurements at Extraction |
Chandrashekhara M. Bhat et al. |
Booster
Beam Physics
Studies
HLRF
|
12 Apr 2017 |
5344-v6 |
Booster Vrf by fsy Measurements at Injection Energy (400 MeV on a DC-Mode) |
Chandrashekhara M. Bhat |
LLRF
Beam Physics
HLRF
|
22 Mar 2017 |
5295-v1 |
Proton Beam Intensity Upgrades for the Neutrino Program at Fermilab |
Chandrashekhara M. Bhat |
Booster
Other
Beam Physics
Longitudinal Dynamics
|
15 Dec 2016 |
5290-v1 |
Particle Accelerators at the Intensity and Energy Frontiers for High Energy Physics Research |
Chandrashekhara M. Bhat |
Technology
|
10 Dec 2016 |
5208-v1 |
Proton Beam Intensity Upgrades for the Neutrino Program at Fermilab |
Chandrashekhara M. Bhat |
Booster
Beam Physics
|
11 Aug 2016 |
5205-v1 |
R&D on Beam Injection and Bunching Scheme in the Fermilab Booster |
Chandrashekhara M. Bhat |
Booster
|
09 Aug 2016 |
5174-v1 |
PIP: Measurements and simulations of beam crossing transition |
Chandrashekhara M. Bhat et al. |
PIP
|
15 Jun 2016 |
5060-v1 |
PIP Status Report Meeting |
Chandrashekhara M. Bhat et al. |
PIP
|
01 Feb 2016 |
5058-v3 |
An Update on Early Injection Capture in the Booster |
Chandrashekhara M. Bhat |
Operations
PIP
|
01 Feb 2016 |
5028-v3 |
Injection Studies in the Booster |
Chandrashekhara M. Bhat |
Studies
|
16 Dec 2015 |
5013-v2 |
Workshop on Booster Performance and Enhancements 23 Nov - 24 Nov |
Chandrashekhara M. Bhat et al. |
PIP
|
09 Dec 2015 |
5014-v1 |
Beam Injection and Capture |
Chandrashekhara M. Bhat |
Booster
Upgrades
Beam Dynamics
|
25 Nov 2015 |
4932-v3 |
An ACNET Application Program to Measure the Energy Spread of Multi-turn Beam in the Booster at Injection |
Chandrashekhara M. Bhat et al. |
Studies
|
16 Sep 2015 |
4928-v1 |
Early Beam Injection Scheme for the Fermilab Booster: A Path for Intensity Upgrade |
Chandrashekhara M. Bhat |
Upgrades
|
18 Aug 2015 |
4872-v2 |
The LHC in Context and the Current Status |
Chandrashekhara M. Bhat |
News
Other
Other
|
27 Jun 2015 |
4701-v1 |
A 1-shot sequence for Booster studies |
Chandrashekhara M. Bhat et al. |
Controls
Studies
|
12 Nov 2014 |
4546-v2 |
Beam Energy Spread in the Booster at Injection |
Chandrashekhara M. Bhat et al. |
Upgrades
Beam Dynamics
Operations
Projects
|
19 Feb 2014 |
4417-v1 |
Longitudinal phase space coating of beam in a storage ring |
Chandrashekhara M. Bhat |
Operations
LLRF
HLRF
RF
Recycler
Beam Physics
Longitudinal Dynamics
Multiparticle
|
21 Jul 2013 |
3614-v1 |
Instability Study in the Recycler |
Chandrashekhara M. Bhat et al. |
MI-RR-Group
Studies
Beam Dynamics
RF
Electron Cooling
|
21 May 2010 |
3562-v1 |
MI -> RR Injection Phase and Energy Mismatch: Measurements using W24 |
Chandrashekhara M. Bhat et al. |
Talks
RF
Beam Instrumentation
Studies
Beam Instrumentation
Studies
Data Acquisition
RF
Recycler
Mountain Range
Main Injector
Shot Data Analysis (SDA)
|
02 Mar 2010 |
3552-v1 |
A 15-Hz spill cycle scenario for Mu2e |
Chandrashekhara M. Bhat et al. |
RF
Accumulator
Debuncher
Beam Dynamics
|
16 Feb 2010 |
3293-v1 |
Reports on the development of the BETACOOL code for simulating cooling processes in the Recycler ring |
Alexander Smirnov_JINR et al. |
Beam Dynamics
Beam Physics
Stochastic Cooling
Electron Cooling
|
30 Jan 2009 |
3268-v2 |
Creating and Accelerating Flat Bunches in the LHC |
Chandrashekhara M. Bhat |
Upgrades
|
15 Dec 2008 |
3220-v2 |
Preparation of Accelerator Complex for Muon Physics Experiments at Fermilab |
Chuck Ankenbrandt et al. |
Antiproton Source
|
28 Oct 2008 |
3192-v1 |
RF Requirements for Bunching in the Recycler for Injection Into the g-2 Ring |
Chandrashekhara M. Bhat et al. |
Beam Dynamics
Recycler
|
28 Aug 2008 |
3167-v1 |
Cooling the Hot Momentum Beam after the Tev Shots |
Chandrashekhara M. Bhat et al. |
Studies
Beam Dynamics
RF
Recycler
|
27 Jul 2008 |
3082-v1 |
Can we combine the High Energy mu+ and mu- Coalescing Rings into One? |
Chandrashekhara M. Bhat |
Muon Collider
|
29 Apr 2008 |
336-v1 |
Shielding Assessment of the Main Injector Complex |
Chandrashekhara M. Bhat et al. |
Studies
|
19 Nov 2007 |
2884-v2 |
Reconstruction of Longitudinal Phase-spaceby Monte Carlo Method |
Chandrashekhara M. Bhat |
Beam Dynamics
RF
Recycler
|
05 Oct 2007 |
2831-v1 |
ENVELOPE AND MULTI-SLIT EMITTANCE MEASUREMENTS AT FERMILAB A0-PHOTOINJECTOR AND COMPARISON WITH SIMULATIONS |
Chandrashekhara M. Bhat et al. |
Experiments
|
06 Jul 2007 |
2811-v1 |
RR RF Calibration by Measuring the Synchrotron Frequency in Linear Bucket |
Chandrashekhara M. Bhat et al. |
Studies
Beam Dynamics
|
13 Jun 2007 |
2768-v1 |
Compound bucket study |
Chandrashekhara M. Bhat et al. |
Studies
Beam Dynamics
Electron Cooling
|
03 May 2007 |
2558-v1 |
Improvements in Momentum Mining for Tevatron Shots |
Chandrashekhara M. Bhat |
Beam Dynamics
|
15 Nov 2006 |
2355-v1 |
Preventing onset of beam instabilities in the e-cooled |
Chandrashekhara M. Bhat |
Beam Dynamics
|
20 Jul 2006 |
2313-v2 |
Strip-Mining |
Chandrashekhara M. Bhat et al. |
Beam Dynamics
|
29 Jun 2006 |
2226-v1 |
Proton Stacking in the Recycler |
Chandrashekhara M. Bhat |
Beam Dynamics
SNuMi
Beam Dynamics
|
17 Apr 2006 |
2209-v1 |
APPLICATIONS OF BARRIER BUCKET RF SYSTEMS AT FERMILAB |
Chandrashekhara M. Bhat |
Beam Dynamics
Electromagnetic Calculations
Beam Dynamics
|
15 Mar 2006 |
2208-v1 |
Bunch compression and stretching using barrier rf system |
Chandrashekhara M. Bhat |
Beam Dynamics
Longitudinal Dynamics
Beam Dynamics
|
15 Mar 2006 |
2174-v1 |
A 20 GeV Coalescing Ring for a Muon Collider |
Chandrashekhara M. Bhat |
Future Accelerators
|
26 Feb 2006 |
2173-v2 |
Innovative Beam Physics for High Luminosity at Hadron Colliders |
Chandrashekhara M. Bhat |
Accumulator
Beam Dynamics
Longitudinal Dynamics
Beam Dynamics
Beam Studies
|
26 Feb 2006 |
2057-v1 |
Pbar Stacking in the Recycler:Longitudinal Phase-space Coating |
Chandrashekhara M. Bhat |
Beam Dynamics
Longitudinal Dynamics
|
17 Dec 2005 |
745-v1 |
Gated Current Integrator for the Beam in the RR Barrier Bucket |
Chandrashekhara M. Bhat et al. |
LLRF
Beam Dynamics
Beam Instrumentation
RF
LLRF
|
13 Dec 2005 |
2034-v2 |
Recycling pbars in the Main Injector- Issues |
Chandrashekhara M. Bhat |
Beam Dynamics
|
01 Dec 2005 |
841-v7 |
Pbar acceleration in MI using 2.5 MHz and 53 MHz rf Systems |
Chandrashekhara M. Bhat et al. |
RF
Controls
HLRF
Studies
LLRF
Longitudinal Dynamics
HLRF
Beam Dynamics
|
07 Nov 2005 |
1851-v1 |
ISO-ADIABATIC MERGING OF PBAR STACKS IN THE FERMILAB RECYCLER |
Chandrashekhara M. Bhat |
Beam Dynamics
Longitudinal Dynamics
Alignment
|
31 May 2005 |
1850-v1 |
A NEW TECHNIQUE FOR MAKING BRIGHT PROTON BUNCHES USING BARRIER RF SYSTEMS |
Chandrashekhara M. Bhat |
Longitudinal Dynamics
Beam Dynamics
|
31 May 2005 |
1744-v3 |
A New Scheme for Producing Bright Proton Bunches in MI for Tevatron Shots |
Chandrashekhara M. Bhat |
Run II
Beam Dynamics
|
18 Mar 2005 |
1468-v1 |
Momentum Mining in the Recycler |
Chandrashekhara M. Bhat |
Beam Dynamics
Longitudinal Dynamics
|
22 Nov 2004 |
1442-v1 |
Novel Beam Manipulation Techniques for Fermilab Run II and Beyond |
Chandrashekhara M. Bhat |
Beam Dynamics
Beam Dynamics
|
11 Nov 2004 |
1425-v3 |
MI SBD Specifications |
Chandrashekhara M. Bhat |
Operations
Beam Instrumentation
|
29 Oct 2004 |
1400-v1 |
Main Injector Bunch Shapes from WCM- pbar production |
Chandrashekhara M. Bhat |
Beam Instrumentation
Instrumentation/beam Physics
Sampled Bunch Display (SBD)
|
29 Oct 2004 |
1401-v1 |
Schemes for Producing High Intensity Low- Longitudinal Emittance Proton Bunches for the Tevatron Collider Shots |
Chandrashekhara M. Bhat |
MI-Dept
Beam Dynamics
|
09 Oct 2004 |
1395-v4 |
Schemes for Producing High Intensity Low-longitudinal Emittance Proton Bunches for the Tevatron Collider |
Chandrashekhara M. Bhat |
Beam Dynamics
|
09 Oct 2004 |
1380-v1 |
Some MI proton longitudinal pulse shapes |
Chandrashekhara M. Bhat |
Beam Instrumentation
Sampled Bunch Display (SBD)
|
28 Sep 2004 |
1345-v1 |
Documents for New MI SBD |
Chandrashekhara M. Bhat et al. |
Beam Instrumentation
Sampled Bunch Display (SBD)
|
22 Sep 2004 |
1338-v1 |
MI SBD pbar data plots |
Chandrashekhara M. Bhat |
Beam Instrumentation
Intensity Measurements
Sampled Bunch Display (SBD)
|
09 Sep 2004 |
933-v2 |
Pbar Momentum Mining in the Recycler :simulations and beam studies |
Chandrashekhara M. Bhat |
Operations
Studies
Beam Dynamics
RF
|
28 Jan 2004 |
890-v1 |
Longitudinal Emittance Measurement in MI SBD: How and why? |
Chandrashekhara M. Bhat |
Studies
Longitudinal Dynamics
|
30 Oct 2003 |
864-v3 |
Pbar acceleration in the MI using 2.5 MHz and 53 MHz rf Systems |
Chandrashekhara M. Bhat et al. |
Operations
HLRF
Studies
Project
LLRF
|
09 Oct 2003 |
742-v1 |
Proton Deceleration from 150 GeV to 8.9 GeV in the Main Injector: Simulations and Beam Tests |
Chandrashekhara M. Bhat |
Beam Instrumentation
Studies
LLRF
Beam Dynamics
|
25 Jul 2003 |
148-v2 |
AP4 Beam Dump and Allowed Beam Intensity Limit During the Construction Phase of theMI-8 GeV Beam-line |
Chandrashekhara M. Bhat |
ES&H
Beam Dynamics
|
10 Jul 2003 |
105-v1 |
Radiation Levels in the 8 GeV Beamline Arising from the Tevatron Beam Losses |
Chandrashekhara M. Bhat et al. |
ES&H
|
24 Jun 2003 |
368-v1 |
The Effects of Antiproton Beam Ionization: First Glance |
Chandrashekhara M. Bhat et al. |
Beam Dynamics
|
20 Jun 2003 |
483-v1 |
RR RF Issues Revisited |
Chandrashekhara M. Bhat |
Beam Dynamics
|
10 Mar 2003 |
435-v1 |
RR pbar Longitudinal Emittance during Beam stacking and Unstacking |
Chandrashekhara M. Bhat |
Beam Dynamics
|
13 Feb 2003 |
744-v1 |
Simulation of Pbar Stacking and Un-Stacking in the Recycler Ring |
Chandrashekhara M. Bhat |
RF
Beam Instrumentation
Studies
Beam Dynamics
|
01 Sep 2002 |
376-v1 |
A First Look at the Longitudinal Emittance in the Fermilab Recycler Ring |
Chandrashekhara M. Bhat |
Beam Dynamics
Beam Instrumentation
RF
|
02 Aug 2002 |
352-v1 |
Preparing the Proton Bunches in 2.5 MHz Buckets for MI Tune-up |
Chandrashekhara M. Bhat |
RF
Beam Instrumentation
Beam Dynamics
|
01 Jun 2001 |
743-v1 |
Pbar Acceleration in the MI using 2.5 MHz Coalescing RF system: Tune-up Study Scheme with proton beams and Operational Implementation |
Chandrashekhara M. Bhat et al. |
RF
Beam Instrumentation
LLRF
LLRF
|
14 Feb 2001 |
362-v1 |
Pbar Acceleration in the Main Injector RR/AR - MI - Tevatron - Simulations and Tune up Studies Using Protons |
Chandrashekhara M. Bhat |
RF
Beam Instrumentation
Studies
|
20 Nov 2000 |
354-v1 |
Pbar Acceleration in the Main Injector for Run II: ESME Simulations |
Chandrashekhara M. Bhat et al. |
RF
Beam Instrumentation
Studies
|
26 Jul 2000 |
353-v1 |
Slow Deceleration of Anti-Proton Beam in the MI: RF Specifications |
Chandrashekhara M. Bhat |
RF
Beam Instrumentation
|
12 Jun 2000 |
349-v1 |
Anti-Proton Beam Acceleration in the MI and RF Specifications |
Chandrashekhara M. Bhat |
RF
Beam Instrumentation
|
26 Jan 2000 |
315-v1 |
Main Injector and Recycler Ring Shielding Assessment |
Chandrashekhara M. Bhat et al. |
ES&H
Studies
|
01 Jul 1998 |
305-v2 |
A Preliminary Analysis of Ground-Water and Surface-Water Radioactivity Around the Main Injector Extraction and Injection Regions |
Chandrashekhara M. Bhat et al. |
ES&H
Studies
|
01 Nov 1997 |
308-v1 |
Main Injector Intensity Limitations at Transition |
Chandrashekhara M. Bhat |
Meetings
Tevatron Group
Beam Dynamics
|
29 Sep 1997 |
289-v1 |
Main Injector 8 GeV Beam Line Shielding Assessment |
Chandrashekhara M. Bhat et al. |
ES&H
Magnets
|
17 Feb 1997 |
235-v1 |
Groundwater, Air-Borne and Soil Activation from the Operation of the Temporary Beam Absorber in the MI-8 GeV Beam Line |
Chandrashekhara M. Bhat et al. |
ES&H
Civil
|
25 Jan 1997 |
211-v2 |
Ground-water Activation from the Operation of MI40 Beam Absorber |
Chandrashekhara M. Bhat et al. |
ES&H
Design Properties
|
28 Aug 1996 |
197-v1 |
8 GeV Beam Absorber for Beam Line Commissioning |
Chandrashekhara M. Bhat et al. |
ES&H
Design Properties
Commissioning
|
31 Jul 1996 |
146-v2 |
Radiation Level in the Intersection Region of AP2 and 8 GeV Beam-line due to Beam Loss in the AP2 Beam-line |
Chandrashekhara M. Bhat et al. |
ES&H
Beam Dynamics
|
23 Aug 1995 |
136-v2 |
µ-Dose Level in the Vicinity of the Intersection of the 8 GeV and the AP2-Beamlines |
Chandrashekhara M. Bhat |
ES&H
Beam Dynamics
|
28 Jun 1995 |
100-v1 |
Radiation Levels in the MI-60 Enclosure from Tevatron Beam Losses |
Chandrashekhara M. Bhat |
ES&H
Civil
Beam Dynamics
|
08 Nov 1993 |
95-v1 |
Radioactivity of the Closed Loop Cooling Water of the Main Injector Beam Abort Dump |
Chandrashekhara M. Bhat |
ES&H
Design Properties
|
01 Sep 1993 |
88-v3 |
Radiation Shieldings for MI Culverts |
Chandrashekhara M. Bhat |
ES&H
Civil
Design Properties
|
01 Aug 1993 |
87-v2 |
A Design Study of the MI40 Beam-Abort Dump |
Chandrashekhara M. Bhat |
ES&H
Design Properties
|
29 Jul 1993 |
82-v1 |
Summary of the Existing MR Beam Diagnostics for Use in Main Injector |
Chandrashekhara M. Bhat et al. |
Beam Instrumentation
Beam Dynamics
|
01 Mar 1993 |
64-v1 |
Proposal for Experimental Test of RF Harmonic Transition Crossing in the Main Ring |
Chandrashekhara M. Bhat et al. |
Lattice
|
28 Jun 1991 |