367-v3 |
Determining the Radius and Energy of the Recycler Ring |
Ioanis Kourbanis |
RF
BPM
Studies
Beam Instrumentation
|
03 Oct 2019 |
5948-v1 |
Report of the PIP-I+ Task Force |
Mary Convery et al. |
PIP-Iplus
|
29 Nov 2017 |
4368-v10 |
Recycler 2.5 MHz RF Project Plan |
Ioanis Kourbanis |
Projects
|
23 May 2016 |
4433-v15 |
Beam Transport AIP Project Plan |
Ioanis Kourbanis |
Transfer Lines
Recycler
Muon
|
06 Apr 2016 |
4944-v1 |
Plan for Establishing 700kW Operations |
Ioanis Kourbanis |
Main Injector
Recycler
|
10 Sep 2015 |
4854-v7 |
Modified Running Scenarios for the g-2 and Mu2e Experiments |
Phil Adamson et al. |
Mu2e
g-2
|
18 Jun 2015 |
4606-v1 |
Doubling the Main Injector Beam Power |
Ioanis Kourbanis |
Main Injector
Accelerator Seminar
PIP
Recycler
|
20 May 2014 |
4407-v1 |
Recycler RF AIP Requirements |
Ioanis Kourbanis |
Projects
Recycler
Muon
|
11 Jul 2013 |
4408-v1 |
Beam Transport AIP Requirements |
Ioanis Kourbanis |
Projects
Recycler
Muon
|
11 Jul 2013 |
1927-v2 |
Beam Acceleration Capabilities of the Present MI RF System |
Ioanis Kourbanis |
RF
|
10 May 2013 |
4131-v1 |
MI and Recycler Injection in the NOvA Era |
Ioanis Kourbanis |
LLRF
LLRF
LLRF
|
17 May 2012 |
3716-v1 |
MI BEAM POWER FOR DIFFERENT BEAM ENERGIES |
Ioanis Kourbanis |
Main Injector
|
16 Nov 2010 |
2330-v1 |
Beam collimation in the Main Injector at Slip-Stacking Injection |
Bruce C. Brown et al. |
Collimation
Project
|
09 Jan 2009 |
2329-v1 |
Beam Loss Simulation in the Main Injector at Slip-Stacking Injection |
Bruce C. Brown et al. |
Collimation
Project
|
09 Jan 2009 |
3218-v1 |
Instrumentation-Systems-SDA meeting of October 1, 2008 |
Kevin Cahill et al. |
SDA
Instrumentation
|
01 Oct 2008 |
3177-v1 |
Instrumentation-Systems-SDA meeting of August 6, 2008 |
Jerry Annala et al. |
SDA
Instrumentation
|
07 Aug 2008 |
3096-v1 |
Instrumentation-Systems-SDA meeting of May 14, 2008 |
Mary Convery et al. |
SDA
Instrumentation
|
23 May 2008 |
3067-v2 |
Instrumentation-Systems-SDA meeting of April 2, 2008 |
David P Capista et al. |
SDA
Instrumentation
|
08 Apr 2008 |
2956-v1 |
Instrumentation-Systems-SDA meeting of December 5, 2007 |
Jerry Annala et al. |
SDA
Instrumentation
|
10 Dec 2007 |
2821-v1 |
Instrumentation-Systems-SDA meeting of June 20, 2007 |
Timofei B Bolshakov et al. |
SDA
|
21 Jun 2007 |
2524-v1 |
Minutes/Action items of the Accelerator performance monitoring tools meeting, Sept. 28 2006 |
Jerry Annala et al. |
SDA
|
16 Oct 2006 |
2379-v1 |
Growth Rates of Coupled Bunch Modes due to the Fundamental RF Impedance |
Ioanis Kourbanis |
RF
|
04 Aug 2006 |
2311-v2 |
Main Injector RF Power Calculations for the Proton Plan |
Tim G. Berenc et al. |
RF
Proton Plan
HLRF
|
30 Jun 2006 |
2283-v3 |
Updated list of Projects in the Accelerator Division suited for University collaboration |
William J. Ashmanskas et al. |
SDA
|
12 Jun 2006 |
1910-v1 |
Main Injector Operations in the Future |
Ioanis Kourbanis |
Operations
BPM
|
29 Jul 2005 |
1900-v1 |
Report to the Fermilab Director by the Proton Committee |
Chuck Ankenbrandt et al. |
Upgrades
MiniBooNE
General
Operations
|
18 Jul 2005 |
1477-v2 |
Projects in the Accelerator Division suited for University collaboration |
William J. Ashmanskas et al. |
SDA
|
15 Dec 2004 |
1345-v1 |
Documents for New MI SBD |
Chandrashekhara M. Bhat et al. |
Sampled Bunch Display (SBD)
Beam Instrumentation
|
22 Sep 2004 |
63-v2 |
Transition Crossing with Positive Chromaticity - A Proposed Main Ring Measurement of alpha_1 vs Chromaticity |
S. Alex Bogacz et al. |
Lattice
|
14 Aug 2003 |
596-v6 |
Protons on Target |
Ioanis Kourbanis |
None
|
08 May 2003 |
698-v1 |
Proton longitudinal emittance vs proton intensity during MI $2B cycle |
Ioanis Kourbanis et al. |
Beam Dynamics
|
04 Jan 2002 |
54-v2 |
Measurements of the Momentum Dependance of Orbit Length in the Main Ring |
Ioanis Kourbanis et al. |
Beam Dynamics
|
21 Aug 1990 |