8762-v2 |
ADSP-05-1212 Booster Gradient Power Supply Bus System Lockout/Tagout Procedure |
Joe Compton |
ADSP
|
06 Apr 2021 |
8840-v1 |
ADAP-02-0013 Operations Protocol for AD/On-Site Satellite Control Rooms |
Joe Compton |
ADAP
|
30 Oct 2020 |
8765-v1 |
ADSP-05-1214 Kautz Road Substation MOS 86, 87, & 89 Lockout |
Joe Compton |
ADSP
|
29 Oct 2020 |
8789-v1 |
ADSP-05-1222 M4 Enclosure 480 Volt Lockout/Tagout Procedure |
Joe Compton |
ADSP
|
28 Oct 2020 |
8786-v1 |
ADSP-05-1221 Extraction Enclosure including the Extraction Stub 480 VAC Lockout/Tagout Procedure |
Joe Compton |
ADSP
|
28 Oct 2020 |
8783-v1 |
ADSP-05-1220 Delivery Ring 13.8 kVAC and 480 VAC Lockout/Tagout Procedure |
Joe Compton |
ADSP
|
28 Oct 2020 |
8780-v1 |
ADSP-05-1219 Transport 480 Volt Lockout/Tagout Procedure |
Joe Compton |
ADSP
|
28 Oct 2020 |
8777-v1 |
ADSP-05-1218 Pre-Target/Pre-Vault 480 Volt Lockout/Tagout Procedure |
Joe Compton |
ADSP
|
28 Oct 2020 |
8774-v1 |
ADSP-05-1217 NuMI MI-65 13.8KVAC Lockout/Tagout Procedure |
Joe Compton |
ADSP
|
28 Oct 2020 |
8768-v1 |
ADSP-05-1215 HP3DS and QP3 13.8 KV Lockout/Tagout Procedure |
Joe Compton |
ADSP
|
28 Oct 2020 |
8759-v1 |
ADSP-05-1210 Main Injector F-sector & Transfer Hall Exposed Bus Lockout/Tagout Procedure |
Joe Compton |
ADSP
|
28 Oct 2020 |
4801-v1 |
PIP Status Report Meeting |
Joe Compton et al. |
PIP
|
13 Apr 2015 |
4784-v1 |
PIP Status Report Meeting |
Joe Compton et al. |
PIP
|
16 Mar 2015 |