6832-v5 |
g-2 Operational Experience Compared to Technical Design Report |
Jerry Annala et al. |
Muon
|
13 Dec 2018 |
4434-v15 |
Delivery Ring AIP Project Plan |
Jerry Annala |
Muon
|
17 Aug 2017 |
4854-v7 |
Modified Running Scenarios for the g-2 and Mu2e Experiments |
Phil Adamson et al. |
Mu2e
g-2
|
18 Jun 2015 |
4409-v1 |
Delivery Ring AIP Requirements |
Jerry Annala |
Projects
Muon
|
11 Jul 2013 |
3872-v1 |
Collimation with hollow electron beams |
Giulio Stancari et al. |
Collimators
Adv. Accelerator R&D
|
25 May 2011 |
3783-v1 |
Tevatron Dept Meeting - 11 Feb 2011 |
Jerry Annala |
Meeting Minutes
Meetings
|
18 Feb 2011 |
3637-v1 |
Tevatron Dept Meeting - 9 July 2010 |
Jerry Annala |
Meeting Minutes
Meetings
|
12 Jul 2010 |
3623-v1 |
Tevatron Dept Meeting - 4 June 2010 |
Jerry Annala |
Meeting Minutes
Meetings
|
07 Jun 2010 |
3613-v1 |
Systems-Instrumentation-SDA meeting of May 11, 2010 |
Jerry Annala et al. |
Tevatron
Main Injector
Instrumentation
|
18 May 2010 |
3606-v1 |
Tevatron Dept Meeting - 30 April 2010 |
Jerry Annala |
Meeting Minutes
Meetings
|
05 May 2010 |
3566-v1 |
Tevatron Dept Meeting - 19 Feb 2010 |
Jerry Annala |
Meeting Minutes
Meetings
|
08 Mar 2010 |
3565-v1 |
Tevatron Dept Meeting - 19 Feb 2010 |
Jerry Annala |
Meeting Minutes
Meetings
|
08 Mar 2010 |
3551-v1 |
Tevatron Dept Meeting - 5 Feb 2010 |
Jerry Annala |
Meeting Minutes
Meetings
|
12 Feb 2010 |
3504-v1 |
Tevatron Dept Meeting - 13 Nov 09 |
Jerry Annala |
Meeting Minutes
Meetings
|
20 Nov 2009 |
3485-v1 |
Tevatron Dept Meeting - 23 Oct 09 |
Jerry Annala |
Meeting Minutes
Meetings
|
27 Oct 2009 |
3480-v1 |
Tevatron Dept Meeting - 16 Oct 09 |
Jerry Annala |
Meeting Minutes
Meetings
|
21 Oct 2009 |
3475-v1 |
Tevatron IPM Discussion, October 15 2009 |
Jerry Annala et al. |
Tevatron
SDA
Instrumentation
|
16 Oct 2009 |
3399-v1 |
Tevatron Dept Meeting - 27 Feb 09 |
Jerry Annala |
Meeting Minutes
Meetings
|
20 May 2009 |
3157-v1 |
Tevatron Dept Meeting - 11 Jul 2008 |
Jerry Annala |
Meeting Minutes
Meetings
|
16 Sep 2008 |
3207-v1 |
Tevatron Dept Meeting - 12 Sep 2008 |
Jerry Annala |
Meeting Minutes
Meetings
|
16 Sep 2008 |
3177-v1 |
Instrumentation-Systems-SDA meeting of August 6, 2008 |
Jerry Annala et al. |
SDA
Instrumentation
|
07 Aug 2008 |
3086-v1 |
Tevatron Dept Meeting - 25 Apr 2008 |
Jerry Annala |
Meeting Minutes
Meetings
|
02 May 2008 |
3055-v1 |
Tevatron Dept Meeting - 14 March 08 |
Jerry Annala |
Meeting Minutes
Meetings
|
17 Mar 2008 |
2956-v1 |
Instrumentation-Systems-SDA meeting of December 5, 2007 |
Jerry Annala et al. |
SDA
Instrumentation
|
10 Dec 2007 |
2754-v5 |
LHC Tune Application |
Jerry Annala et al. |
General
|
16 Jul 2007 |
2684-v1 |
Tevatron Dept Meeting - 2 March 2007 |
Jerry Annala |
Meeting Minutes
Meetings
|
08 Mar 2007 |
2524-v1 |
Minutes/Action items of the Accelerator performance monitoring tools meeting, Sept. 28 2006 |
Jerry Annala et al. |
SDA
|
16 Oct 2006 |
2511-v2 |
Minutes of the SDA meeting of October 9, 2006 |
Jerry Annala et al. |
SDA
|
10 Oct 2006 |
2427-v1 |
Use of States in the Tevatron Collider |
Jerry Annala et al. |
Console Applications
|
30 Aug 2006 |
1946-v1 |
New Optics for the Tevatron |
Yuri Alexahin et al. |
Studies
General
Beam Studies
|
01 Sep 2005 |
1838-v1 |
Studies of the Chromaticity, Tune, and Coupling Drift in the Tevatron |
Jerry Annala et al. |
chromaticity
Tevatron Tune
Beam Studies
|
22 May 2005 |
1001-v9 |
Design of an Interaction Region at C0 in the Tevatron |
Jerry Annala et al. |
CZero IR Development
|
26 Mar 2005 |
1740-v2 |
Tevatron Operational Experience with Octupoles |
Jerry Annala et al. |
Beam Studies
|
18 Mar 2005 |
1547-v1 |
Tevatron Abort Loop Status |
Jerry Annala |
TeV ABORT
Run II
Status
|
28 Jan 2005 |
1236-v1 |
Tevatron chromaticity and tune drift and snapback studies report |
Jerry Annala et al. |
chromaticity
Tevatron Tune
Beam Studies
|
06 Jan 2005 |
467-v2 |
Chromaticity, Tune, and Coupling Drift and Snapback Correction Algorithms in the Tevatron |
Jerry Annala et al. |
chromaticity
Tevatron Tune
|
22 Nov 2004 |
1267-v2 |
Measurements of tunes, coupling, and chromaticity on the Tevatron front porch and start of ramp. |
Jerry Annala et al. |
Beam Studies
|
09 Aug 2004 |
1291-v1 |
Calculating the initial and integrated luminosity for every store |
Jerry Annala et al. |
SDA
|
09 Aug 2004 |
1147-v1 |
Tevatron BLM Review Committee Report of meeting on April 19th. |
Jerry Annala et al. |
TeV ABORT
|
28 Apr 2004 |
554-v4 |
Tevatron Beam Position Monitor Upgrade Requirements |
Jerry Annala et al. |
Instrumentation
BPM
BPM
BPM
|
12 Nov 2003 |
480-v1 |
Analysis of the B2 Correction in the Tevatron |
Jerry Annala et al. |
Magnets
chromaticity
Tevatron Tune
Beam Studies
|
07 Mar 2003 |
479-v2 |
Specifications for an emittance OAC |
Jerry Annala et al. |
Acnet
Data Acquisition
|
06 Mar 2003 |
478-v0 |
Measurement of the average b2 component in the Tevatron dipole magnets at the start of the energy ramp. |
Jerry Annala et al. |
chromaticity
Tevatron Tune
Beam Studies
|
06 Mar 2003 |
475-v1 |
Commissioning of the Tune Drift Compensations System in the Tevatron |
Jerry Annala et al. |
Tevatron Tune
Beam ramp
Beam Studies
|
03 Mar 2003 |
437-v1 |
Measurement of the tunes and coupling as a function of helix size at 150 Gev and adjustment of feeddowns. |
Jerry Annala et al. |
Tevatron Tune
Beam Studies
|
12 Feb 2003 |
242-v1 |
Notes on tune drift measurements at 150 GeV |
Jerry Annala et al. |
Tevatron Tune
|
13 Dec 2002 |