8992-v2 |
ADAP-11-0004 Accelerator Division Implementation for Min-Safe Condition |
Consolato Gattuso |
Operations
|
17 Mar 2021 |
8723-v2 |
Magnetic System for the IOTA Electron Lens: Scope of Work for the DOE 2020 Phase I SBIR Proposal with RadiaBeam |
Giulio Stancari et al. |
IOTA
FAST
Instrumentation
Beam Physics
|
04 Feb 2021 |
8690-v2 |
Implementation of BLonD for Booster Simulations |
Paul Derwent |
Booster
Longitudinal Dynamics
Beam Dynamics
|
22 Jan 2021 |
8874-v3 |
Comment on the PIP-III RCS Location |
David V Neuffer |
Main Injector
Booster
|
24 Nov 2020 |
3299-v2 |
Some Console Applications for Displaying Main Injector BLM Measurements |
Bruce C. Brown et al. |
Operations
Beam Instrumentation
Collimation
Beam Loss Monitors (BLM)
Console Applications
|
27 May 2020 |
3523-v1 |
Residual Radiation Monitoring in the Main Injector with the ROTEM RAM DA3-2000 Radiation Survey Meter |
Bruce C. Brown |
Other
|
27 May 2020 |
3629-v1 |
Loss and Residual Radiation at MI400 for 2010 Shutdown Preparation |
Bruce C. Brown |
Operations
Beam Instrumentation
Collimation
Beam Loss Monitors (BLM)
|
27 May 2020 |
3857-v1 |
Main Injector Counterwave Properties and MI300 Collimator Motion Limits |
Bruce C. Brown |
Transfer Lines
Lattice
Transfer Lines
Collimation
Console Applications
|
27 May 2020 |
4457-v1 |
Replacement Primary Collimator for Main Injector |
Bruce C. Brown et al. |
Collimation
|
27 May 2020 |
4460-v1 |
A Collimation Mask at MI308 to Protect RR to MI Injection Kickers |
Bruce C. Brown |
Collimation
|
27 May 2020 |
4519-v1 |
Studies of MI Beam Intensity, Loss and Activation Patterns |
Bruce C. Brown |
DCCTs
Beam Instrumentation
ES&H
|
27 May 2020 |
2618-v1 |
First Results from MI8 Collimator Use |
Phil Adamson et al. |
Transfer Lines
ES&H
Collimation
Studies
|
22 May 2020 |
2475-v1 |
Reminder of Some Beams DocDB Features |
Bruce C. Brown et al. |
Other
|
22 May 2020 |
1385-v3 |
Pictures of a Good and a Failed Main Injector Bellows |
Bruce C. Brown |
Vacuum
|
30 Apr 2020 |
8164-v1 |
Notes on Main Injector Quadrupole Reliability |
Sherry F Baketz et al. |
Magnets
Magnets
Magnets
|
30 Mar 2020 |
6407-v3 |
Remote OAC XML-RPC Interface |
Beau Harrison |
ACNET
Controls
|
15 Oct 2019 |
929-v3 |
ACL An Introduction |
Brian S. Hendricks |
Controls
Controls
Synoptic
Controls Working Group
Console Applications
Controls
ACL
Controls
ACNET
Controls
General
|
27 Sep 2019 |
7573-v2 |
Design Considerations and Operational Features of the Collimators for the Fermilab Main Injector and Recycler |
Bruce C. Brown |
Transfer Lines
ES&H
Energy Deposition
Recycler
Beam Physics
Transfer Lines
Main Injector
Collimation
Collimation
|
30 Aug 2019 |
7540-v1 |
Radiation Studies for Main Injector Activation Using MARS in a `Toy Model' |
Phil Adamson et al. |
Beam Physics
Main Injector
|
09 Aug 2019 |
7376-v6 |
Recent Performance and Future Plans for the Fermilab Accelerator Complex |
Chandrashekhara M. Bhat |
Upgrades
|
23 Jun 2019 |
7091-v2 |
Booster RF Cavities for PIP-I+ and PIP-II (Functional Requirements Specification) |
Chandrashekhara M. Bhat |
Booster
PIP-Iplus
Projects
|
18 Mar 2019 |
7088-v2 |
Booster Wide Aperture D-Magnets for PIP-I+ and PIP-II (Functional Requirements Specification) |
Chandrashekhara M. Bhat |
Booster
PIP-Iplus
Projects
|
18 Mar 2019 |
7085-v2 |
Booster Intensity AIP for PIP-I+ (Functional Requirements Specification) |
Chandrashekhara M. Bhat |
Booster
Upgrades
PIP-Iplus
|
18 Mar 2019 |
6967-v4 |
Booster DC studies: Adiabatic Beam Capture |
Chandrashekhara M. Bhat et al. |
Booster
LLRF
Beam Dynamics
Studies
HLRF
|
08 Feb 2019 |
6631-v1 |
Longitudinal Scans of Residual Radiation in MI Collimators C307 and C308 |
Bruce C. Brown |
Energy Deposition
Collimation
|
22 Aug 2018 |
6306-v6 |
Booster Upgrades to Achieve ~MW Beam in the Fermilab Complex |
Chandrashekhara M. Bhat |
Booster
|
10 May 2018 |
6270-v2 |
Al Tag Radiation Studies for Instrumentation in the Main Injector |
Bruce C. Brown et al. |
Photographs
Beam Instrumentation
ES&H
Beam Instrumentation
Instrumentation
Recycler
Main Injector
|
13 Apr 2018 |
5816-v2 |
Study of Microchannel Plates as a Novel Approach to Electron Gun Design for Electron Lenses |
Magnus Haughey |
IOTA
Adv. Accelerator R&D
|
12 Oct 2017 |
4947-v2 |
Operation of SEY Test Stand Experiment at MI-10 |
Jeffrey Eldred |
Other
Beam Instrumentation
LabVIEW
|
06 Sep 2017 |
4319-v59 |
Muon Cryogenics AIP Schedule |
Ken Domann |
Projects
|
04 Aug 2017 |
5675-v1 |
Beam Emittance using MW in MI8 for two different LINAC beam Currents |
Chandrashekhara M. Bhat et al. |
Beam Physics
Studies
|
23 Jul 2017 |
4921-v11 |
ADAP-01-0001 Accelerator Division Procedure Requirements |
Raymond H Lewis |
ADAP
|
06 Jul 2017 |
4776-v3 |
Magnetic Field Measurements in the BnB 25 Meter Absorber |
Michael R Backfish |
MiniBooNE
External Beams
|
06 Jul 2017 |
4046-v3 |
Activation of Steel and Copper Samples in the Main Injector Collimator Region |
Bruce C. Brown |
ES&H
Energy Deposition
Collimation
|
01 Jun 2017 |
5352-v2 |
Laser Notcher status 3-22-17 |
David E. Johnson |
PIP
|
22 Mar 2017 |
604-v2 |
Increasing the Range of Recycler IBEAM |
James L. Crisp et al. |
Beam Instrumentation
|
22 Aug 2003 |
899-v2 |
Operations of the New MI and RR DCCT front-end |
Tom Meyer |
Beam Instrumentation
Acnet
Beam Instrumentation
Data Acquisition
|
03 Mar 2004 |
5301-v4 |
Achievable Aperture Improvements for the Recycler |
Bruce C. Brown et al. |
Magnets
Lattice
|
30 Dec 2016 |
5268-v2 |
July Commissioning and Upgrade palns |
David E. Johnson |
PIP
|
22 Nov 2016 |
5269-v2 |
Laser Notcher Free Space Optics |
Todd R. Johnson |
PIP
|
22 Nov 2016 |
5266-v2 |
Overall Design of Laser Notcher System |
Kevin Duel et al. |
PIP
|
22 Nov 2016 |
4896-v2 |
Collimation Design using Reduced Courant-Snyder Coordinates |
Bruce C. Brown |
Lattice
Energy Deposition
Collimation
|
27 May 2016 |
4982-v2 |
Aperture Implications for Recycler Assuming Full Coupling and Nominal Vertical Apertures |
Bruce C. Brown |
Collimation
Lattice
Collimation
|
12 May 2016 |
4514-v1 |
Tomography And Related Diagnostics In Synchrotrons: Users Guide |
Duncan J Scott |
Beam Instrumentation
Beam Instrumentation
Longitudinal Dynamics
|
16 Mar 2016 |
4880-v1 |
Magnetic Field Calculations for Recycler Magnets |
Bruce C. Brown et al. |
Magnets
Magnets
|
08 Jul 2015 |
4854-v7 |
Modified Running Scenarios for the g-2 and Mu2e Experiments |
Phil Adamson et al. |
Mu2e
g-2
|
18 Jun 2015 |
4772-v1 |
TSP2IP Review |
David Augustine et al. |
Vacuum
|
23 Feb 2015 |
4692-v1 |
Loss History in Main Injector: LI619A-LI621 and LI101C-LI107 |
Bruce C. Brown |
Operations
Beam Loss Monitors (BLM)
BPM
|
28 Oct 2014 |
4691-v3 |
2nd harmonic RF perpendicular biased cavity update (Oct 2014) |
Cheng-Yang Tan |
PIP
|
21 Oct 2014 |
4633-v2 |
Functional Requirement Specification Performance of the MI EBP |
Randy M Thurman-Keup |
Beam Instrumentation
Instrumentation
|
21 Jul 2014 |
4248-v3 |
Muon Campus Cryogenic Requirements |
Arkiday Klebaner |
Mu2e
Muon
g-2
|
29 Jun 2014 |
4458-v3 |
High Power Target R&D Program Talk |
Kavin Ammigan et al. |
NuMI
Accelerator Seminar
|
27 Dec 2013 |
4436-v3 |
Distortion in Resistive Wall Current Monitor Signal Transmission Lines |
Duncan J Scott |
Beam Instrumentation
Beam Physics
|
05 Sep 2013 |
4424-v2 |
TRACK 3D SIMULATIONS OF THE PIP RFQ |
Jean-Paul Carneiro |
PIP
|
13 Aug 2013 |
4375-v2 |
NM3 Beam Cherenkov |
Michael I Geelhoed |
SY120
|
26 Jun 2013 |
4150-v2 |
BoE MuAIP 02.03: Beam Line Instrumentation |
Brian E. Drendel |
Projects
|
12 Jun 2012 |
1927-v2 |
Beam Acceleration Capabilities of the Present MI RF System |
Ioanis Kourbanis |
RF
|
10 May 2013 |
4149-v1 |
BoE MuAIP 03.04: Delivery Ring Abort System |
Brian E. Drendel |
Projects
|
12 Jun 2012 |
4349-v5 |
Main Injector and Recycler: Ready for NoVa and Beyond |
Duncan J Scott |
Recycler
Main Injector
Accelerator Seminar
|
24 Apr 2013 |
4299-v1 |
Muon Campus Projects Overview |
Mary Convery |
Muon
|
21 Feb 2013 |
4151-v1 |
BoE MuAIP 03.05: Delivery Ring Instrumentation |
Brian E. Drendel |
Projects
|
12 Jun 2012 |
4225-v3 |
High Rate Tracking Proposal |
Michael I Geelhoed |
MTEST
|
03 Oct 2012 |
4229-v2 |
Progress Update - 2012 Booster LCW Improvement Plan |
David Hixson |
Upgrades
Operations
PIP
|
26 Sep 2012 |
4146-v2 |
Integration of ORKA and SY120 |
Thomas R. Kobilarcik |
SY120
|
26 Jun 2012 |
4142-v3 |
Control System Application Development in C/C++ |
Carl Schumann |
Console Applications
Console Environment
Program Libraries
|
01 Jun 2012 |
3980-v2 |
Analysis Procedures for Al Activation Studies |
Bruce C. Brown |
Beam Instrumentation
ES&H
Energy Deposition
Beam Loss Monitors (BLM)
Collimation
|
09 Apr 2012 |
783-v1 |
Ionization Issues at the Fermilab Recycler |
Daniel R. Broemmelsiek |
Operations
Vacuum
Commissioning
|
26 Jan 2012 |
4042-v3 |
Status of Linac Lattice Study |
H.J Kim |
Beam Physics
PIP
Linac
|
11 Jan 2012 |
3965-v3 |
Tevatron LCW Cooling Reconfiguration Analysis / Tevatron Decommissioning Activity |
Abhishek Deshpande |
Tevatron
Main Ring
Water
|
18 Oct 2011 |
3928-v3 |
NML High Energy Beam Absorbers and Dump: Overview Talk |
Curtis Baffes |
Beam Dump
|
17 Oct 2011 |
3871-v4 |
Beam Loading Studies in Accumulator Ring for µ2e project at Fermilab |
Valerii Balbekov et al. |
Accumulator
Beam Physics
Mu2e
Accelerator Seminar
|
29 Jun 2011 |
3881-v3 |
Issues Associated with the Coordination of the Mu2e and Muon g-2 Experiments |
Steve Werkema |
Mu2e
Antiproton Source
|
27 Jun 2011 |
3746-v2 |
Booster Downtime |
Todd Sullivan |
Booster
|
08 Dec 2010 |
3729-v2 |
Machine Operating Description - Linac |
Fernanda G Garcia |
Operations
|
08 Dec 2010 |
3717-v1 |
Comparison of Short Term Cooldown Data for MI Collimator C307 Near Beam and Beside Marble Shielding |
Amir Jaehoon Safavi |
ES&H
|
17 Nov 2010 |
3669-v1 |
Bunch coalescing study at low energy |
Anna Yagodnitsyna |
RF
|
10 Sep 2010 |
3638-v2 |
Ecloud in the Main Injector |
Michael R Backfish |
Project X
|
20 Aug 2010 |
1467-v5 |
Controlling the Tevatron Helix using the TEVHLX OAC |
Ron Moore |
Kickers and Separators
|
02 Aug 2010 |
2872-v22 |
Pbar Rookie Book - 2009 Update |
Brian E. Drendel et al. |
Antiproton Source
|
17 Jun 2010 |
3330-v33 |
List of NuMI Upgrades Meetings and Reviews |
Michael A. Martens |
NuMI
|
22 Apr 2010 |
3568-v1 |
Predicting Residual Radiation using Beam Loss Data - Early Results |
Bruce C. Brown |
Operations
Beam Instrumentation
ES&H
Beam Loss Monitors (BLM)
MI-Dept
|
11 Mar 2010 |
3542-v2 |
Calibration of BPMs in TEL2 and electron-proton alignment for tune-spread studies with Gaussian guns in the Tevatron |
Alexander L. Romanov et al. |
Beam-beam Compensation
BPM
|
01 Feb 2010 |
3529-v1 |
Expected Activation of SmCo5 Beam Line Magnets |
Bruce C. Brown |
Transfer Lines
ES&H
NOvA
Magnets
|
05 Jan 2010 |
3486-v6 |
Installation Planning for BPM-HRM Booster DAQ Extension |
Craig C Drennan |
Beam Instrumentation
|
14 Dec 2009 |
3430-v3 |
HINS 325 MHz Cavity Test Cave 3D Model |
David W. Peterson et al. |
Project X
|
18 Nov 2009 |
3474-v6 |
ORBIT development: Status & Plans |
Leonid Vorobiev |
Multiparticle
|
16 Oct 2009 |
3079-v10 |
HINS RFQ_layout |
Elmie Peoples |
Project X
|
17 Apr 2009 |
3130-v5 |
MINU/Gap Clearing Kicker Shutdown Schedule |
Ken Domann |
Magnets
MINU GPP
Main Injector
|
25 Feb 2009 |
3295-v1 |
Improved Measurement of Main Injector Collimation Efficiency for Uncaptured Beam |
Bruce C. Brown |
Beam Loss Monitors (BLM)
Proton Plan
Collimation
|
02 Feb 2009 |
3236-v0 |
Accelerator Division Impact Statement for the Mu2e Proposal |
Michael J. Syphers |
External Beams
Antiproton Source
|
27 Oct 2008 |
3219-v1 |
Analysis of Some Crude Main Injector Radiation Cool-down Data |
Bruce C. Brown |
Operations
ES&H
|
03 Oct 2008 |
647-v3 |
Tevatron Abort Kicker Prefire Simulations (Review of the A48 Collimator Design) |
Alexandr Drozhdin |
Energy Deposition
Collimators
|
02 Jun 2008 |
1234-v2 |
Tevatron Run-II Beam Collimation System Performance |
Alexandr Drozhdin et al. |
Collimators
|
02 Jun 2008 |
1231-v2 |
MODELING OF BEAM LOSS IN TEVATRON AND BACKGROUNDS IN THE BTEV DETECTOR |
Alexandr Drozhdin et al. |
CZero IR Development
|
02 Jun 2008 |
1232-v3 |
The GTeV Forward Spectrometer Acceptance Studies |
Alexandr Drozhdin et al. |
DZero Forward Proton Detector
|
02 Jun 2008 |
1960-v1 |
Potential MI Collimation Scheme with MI30 Dynamic Dispersion Insert |
David E. Johnson |
Lattice
Collimation
|
22 Apr 2008 |
2261-v2 |
Potential Collimation Scheme using a Dynamic Dispersin Bump In MI30 Straight |
David E. Johnson |
Lattice
Collimation
|
22 Apr 2008 |
2315-v3 |
Dynamic Dispersion for Main Injector Collimation |
David E. Johnson |
Lattice
Collimation
|
22 Apr 2008 |
2287-v1 |
Mechanical Design of MI8 Collimators |
Bruce C. Brown et al. |
Transfer Lines
Collimation
|
22 Apr 2008 |
2299-v1 |
Alignment Check for MI8 Collimators |
Bruce C. Brown |
Transfer Lines
Collimation
Alignment
|
22 Apr 2008 |
2388-v2 |
Thermal Calculation for MI8 Collimators |
Bruce C. Brown et al. |
Transfer Lines
Collimation
|
22 Apr 2008 |
2426-v2 |
MARS15 Calculations for MI8 Collimator Design |
Bruce C. Brown et al. |
Transfer Lines
ES&H
Proton Plan
Collimation
|
22 Apr 2008 |
2803-v1 |
Measurement of Booster Beam Halo using the C836A and C838A Collimators in the MI8 Beamline |
Bruce C. Brown |
Transfer Lines
Beam Loss Monitors (BLM)
Proton Plan
Other
Collimation
|
22 Apr 2008 |
2881-v2 |
Main Injector Collimation System Hardware |
Bruce C. Brown |
Operations
ES&H
Proton Plan
Collimation
|
22 Apr 2008 |
1262-v5 |
Synchrotron Light Monitor Front End Description |
Eugene Lorman et al. |
SyncLite (SL)
Instrumentation
|
29 Feb 2008 |
2934-v22 |
Project X Control System Requirements |
Suzanne Gysin et al. |
Project X
Controls
|
27 Feb 2008 |
2752-v7 |
Wire Scanner Application Requirements Document for LHC |
Elliott S McCrory et al. |
General
LAFS
|
06 Nov 2007 |
2863-v2 |
Conversion Between New Booster Correctors and Old |
Craig C Drennan |
Operations
Power Supplies
|
02 Oct 2007 |
2754-v5 |
LHC Tune Application |
Jerry Annala et al. |
General
|
16 Jul 2007 |
2753-v3 |
Profile Fit Libary Requirements Document for LHC |
Elliott S McCrory et al. |
General
LAFS
|
12 Jun 2007 |
2755-v4 |
LHC Synchrotron Radiation Monitor Application Requirements |
Elliott S McCrory et al. |
General
|
23 May 2007 |
2083-v2 |
MIBPM Electronics |
Bill Haynes et al. |
BPM
|
05 Sep 2006 |
2572-v5 |
6D muon cooling experiment at Fermilab |
Andreas Jansson |
Muon Collider R&D
|
06 Dec 2006 |
2297-v2 |
COHERENT INSTABILITIES AT THE FNAL BOOSTER |
Valeri A Lebedev |
Beam Dynamics
|
16 Oct 2006 |
2449-v2 |
Using Eigenvectors as Constraints in MAD-X Matching Module |
Yuri Alexahin et al. |
Optics
|
13 Oct 2006 |
2444-v3 |
Simulation of transition crossing in the Fermilab Booster |
Alexandr Drozhdin et al. |
Beam Dynamics
Longitudinal Dynamics
Accelerator Seminar
|
12 Oct 2006 |
2472-v4 |
Sequenced Data Acquisition for the LHC |
Elliott S McCrory |
SDA
SDA
|
28 Sep 2006 |
2392-v1 |
Target and Horn Configuration for SNuMI, NOvA, and MINERvA |
Michael A. Martens |
SNuMi
|
15 Aug 2006 |
2012-v4 |
MI-BPM Upgrade Cable Specification |
Marv Olson et al. |
BPM
BPM
|
25 Jul 2006 |
2129-v2 |
Raw Mode Measurements in the Upgraded MI BPM System |
Steve Foulkes |
BPM
|
20 Jun 2006 |
2263-v2 |
Proposal of Studying Electron Cloud and It's Mitigation for Tevatron and Main Injector Upgrades |
Xiaolong Zhang |
Studies
Vacuum
SNuMi
Beam Dynamics
|
13 Jun 2006 |
2285-v2 |
Rapid Transfer BPM List as of 6-9-06 (after upgrades) |
John Van Bogaert |
Transfer Lines
Transfer Lines
Run II Upgrades
Beam Transfer
BPM
BPM
BPM
|
09 Jun 2006 |
2231-v1 |
Thoughts on Recycler Transfer lines in the Proton Stacker Era |
David E. Johnson |
Transfer Lines
|
13 Apr 2006 |
2098-v2 |
Accelerator Physics & Tech Seminar - Tevatron Crystal Collimator |
Nikolai Mokhov et al. |
Collimators
|
08 Mar 2006 |
2187-v1 |
Specifications for the Proton Driver Injection Absorber |
David E. Johnson |
Proton Driver
Other
|
07 Mar 2006 |
841-v7 |
Pbar acceleration in MI using 2.5 MHz and 53 MHz rf Systems |
Chandrashekhara M. Bhat et al. |
RF
Controls
HLRF
Studies
LLRF
Longitudinal Dynamics
HLRF
Beam Dynamics
|
07 Nov 2005 |
2020-v2 |
Summary of the ICALEPCS 2005 Conference |
Charles Briegel et al. |
Front-end Systems
Power Supplies
BPM
Accelerator Seminar
|
07 Nov 2005 |
1940-v3 |
Mask at MI Q301 |
David E. Johnson |
Operations
|
02 Sep 2005 |
1067-v23 |
Tevatron BPM Software Design |
Dinker Charak et al. |
BPM
BPM
|
16 Aug 2005 |
1872-v2 |
Recomputed "Emittances" and "Intensities and Efficiencies" Summary Tables |
Timofei B Bolshakov et al. |
SDA
|
18 Jul 2005 |
1339-v2 |
Tevatron Tune Fitters, 1.7 GHz & 21.4 MHz: Sept 04 Status report |
Paul Lebrun |
Tevatron Tune
Instrumentation/beam Physics
|
31 May 2005 |
1744-v3 |
A New Scheme for Producing Bright Proton Bunches in MI for Tevatron Shots |
Chandrashekhara M. Bhat |
Run II
Beam Dynamics
|
18 Mar 2005 |
1065-v8 |
Tev BPM VME Hardware Specifications |
Mark J Bowden et al. |
BPM
|
11 Mar 2005 |
1552-v2 |
A Second Look at Injection Turn by Turn |
Robert K Kutschke |
BPM
|
03 Feb 2005 |
1540-v1 |
Defining a Recycler "Golden" Closed Orbit |
David E. Johnson |
Operations
|
25 Jan 2005 |
1382-v2 |
Residual Radiation Hints for Aperture and Alignment Issues in the Main Injector |
Bruce C. Brown |
ES&H
Vacuum
Alignment
|
18 Jan 2005 |
1154-v2 |
FNPL BPM System Readout Software |
Jason C. Wennerberg |
Controls
BPM
|
08 Jan 2005 |
1236-v1 |
Tevatron chromaticity and tune drift and snapback studies report |
Jerry Annala et al. |
Tevatron Tune
chromaticity
Beam Studies
|
06 Jan 2005 |
1512-v3 |
Tevatron BPM Upgrade Test Stand Setup |
Dehong Zhang |
BPM
BPM
BPM
|
27 Dec 2004 |
1489-v1 |
The Effect of Reshimming of the Tevatron Dipoles (Summer,2004) to Correct the a1 Moment on the Calculated Skew Quadrupole Correctors. |
Norman M. Gelfand |
Magnets
|
07 Dec 2004 |
1114-v11 |
Test the Modified EchoTek Board |
Vince Pavlicek et al. |
BPM
BPM
BPM
|
29 Nov 2004 |
1101-v8 |
Tevatron Beam Position Monitor Upgrade Offline Software Specification |
Robert K Kutschke |
BPM
|
29 Nov 2004 |
1300-v1 |
Next Look at the New Echotek Boards in A3 |
Robert K Kutschke |
BPM
|
15 Nov 2004 |
1306-v1 |
Phase Pattern with the New Echotek Board |
Robert K Kutschke |
BPM
|
15 Nov 2004 |
1434-v1 |
TeV BPM Upgrade: A Look at Uncoalesced Batches |
Robert K Kutschke |
BPM
|
15 Nov 2004 |
1448-v1 |
How Mismatched Phases on the BPM Cables Affect Postion Measurement |
Robert K Kutschke |
BPM
|
15 Nov 2004 |
1427-v2 |
Bunching for Shorter Damping Rings for the ILC |
David V Neuffer |
Future Accelerators
|
09 Nov 2004 |
1387-v3 |
Thoughts on SY120 Operation in FY'05 |
David E. Johnson |
SY120
|
01 Nov 2004 |
1395-v4 |
Schemes for Producing High Intensity Low-longitudinal Emittance Proton Bunches for the Tevatron Collider |
Chandrashekhara M. Bhat |
Beam Dynamics
|
09 Oct 2004 |
1315-v1 |
Performance of New Echotek for the Last Two Shots Before the Shutdown |
Robert K Kutschke |
BPM
|
26 Aug 2004 |
1303-v1 |
Seeing AntiProtons with the New Echotek Board |
Robert K Kutschke |
BPM
|
13 Aug 2004 |
1205-v3 |
Tevatron BPM Upgrade Calibration Specifications: Part II |
Robert K Kutschke |
BPM
|
11 Aug 2004 |
1202-v3 |
BLM Prototype Testing |
Bill Haynes et al. |
BPM
|
02 Aug 2004 |
931-v6 |
Implementation of the Tevatron OAC 1.7 Shottky monitor. |
Paul Lebrun |
Java Data Acquisition
Schottky
|
26 Jul 2004 |
1261-v1 |
BPM Timing Generator Fanout Layout |
Bill Haynes |
BPM
|
22 Jul 2004 |
1260-v1 |
BPM Timing Generator Fanout Schematics |
Bill Haynes |
BPM
|
22 Jul 2004 |
1255-v2 |
Beam Separation with the Addition of IR Mini Separators |
John A. Johnstone |
Kickers and Separators
|
15 Jul 2004 |
1191-v2 |
Summary on difference orbit measurement from week of May 17th, 2004 [A0 photoinjector] |
Philippe R.-G. Piot et al. |
Experiments
|
13 Jul 2004 |
1242-v2 |
Potential Optical Solutions For Pbar Stacking and SY120 Mixed-Mode Operation |
David E. Johnson |
SY120
|
07 Jul 2004 |
1208-v2 |
Some Thoughts About June 9 Induced Instability at the Recycler Ring |
Kingyuen B. Ng |
Beam Dynamics
Instabilities
|
02 Jul 2004 |
1165-v3 |
Specification for Passive Band Pass / Anti-aliasing Filter for the Tevatron BPM System |
Vince Pavlicek |
BPM
|
18 Jun 2004 |
1124-v1 |
Separating Pbars by Time |
Robert K Kutschke |
BPM
|
08 Jun 2004 |
1167-v1 |
Tevatron Closed Orbit Beam Position Measurements in Short Gate Mode |
Robert K Kutschke |
BPM
|
30 May 2004 |
1160-v1 |
Summary of TeVatron Spool Data. |
Norman M. Gelfand |
Magnets
|
05 May 2004 |
1149-v2 |
The Quadratic Term in the Tevatron BPM Sum Signal |
Robert K Kutschke |
BPM
|
04 May 2004 |
1134-v1 |
Dependence of BPM Resolution on Time During a Store |
Robert K Kutschke |
BPM
|
03 May 2004 |
1147-v1 |
Tevatron BLM Review Committee Report of meeting on April 19th. |
Jerry Annala et al. |
TeV ABORT
|
28 Apr 2004 |
1084-v2 |
Tevatron IPM - Poster for labwide DOE review. |
Andreas Jansson |
Ion Profile Monitor
|
01 Apr 2004 |
1078-v6 |
SDA Poster for the DOE Review |
Paul Lebrun |
SDA
|
22 Mar 2004 |
705-v4 |
List of "Longitudinal" Devices Saved in SDA |
Mike Church et al. |
SDA
|
18 Mar 2004 |
1075-v1 |
Tevatron Transverse Beam Emittance and Luminosity at CDF and D0 for stores 3179-3293 |
Krzysztof Genser et al. |
Emittance
Flying Wires
|
15 Mar 2004 |
1066-v2 |
Pattern of Phases From the TeV BPM Using the Echotek Board |
Robert K Kutschke |
BPM
|
15 Mar 2004 |
888-v3 |
Tevatron Lattice Function Fits based on Comparisons of Transverse Emittance Measurements at 150 and 980GeV |
Krzysztof Genser |
Emittance
Transverse Dynamics
Flying Wires
SyncLite (SL)
Sampled Bunch Display (SBD)
Flying Wires
|
01 Mar 2004 |
1028-v2 |
MI BLT Injections Movie for Pbar Shot to Recycler |
Vic Scarpine |
Beam Line Tuner (BLT)
|
19 Feb 2004 |
1003-v3 |
Status Report of the Tevatron Alignment Task Force |
Ray Stefanski |
Alignment
|
18 Feb 2004 |
960-v4 |
Strategies For Measuring Resolution of new BPM Electronics |
Mark Fischler |
Tevatron BPM
BPM
BPM
|
09 Jan 2004 |
949-v1 |
Sensitivity of the Tevatron Tune to (future) C0 IR Power Supplies |
Peter Garbincius |
CZero IR Development
|
17 Dec 2003 |
935-v2 |
Safety System Overview |
Mark T. Obrycki |
Adv. Accelerator R&D
|
17 Dec 2003 |
942-v5 |
Seeing Antiprotons with the Damper Board |
Robert K Kutschke |
BPM
|
16 Dec 2003 |
691-v3 |
Tables of SDA Intensity Devices |
Mike Church |
SDA
|
05 Dec 2003 |
703-v4 |
Tables of "Transverse" Devices Saved in SDA |
Mike Church |
SDA
|
05 Dec 2003 |
692-v4 |
Tables of FTPs and SNPs Saved in SDA |
Mike Church |
SDA
|
05 Dec 2003 |
864-v3 |
Pbar acceleration in the MI using 2.5 MHz and 53 MHz rf Systems |
Chandrashekhara M. Bhat et al. |
Operations
HLRF
Studies
Project
LLRF
|
09 Oct 2003 |
847-v1 |
Tevatron ionization profile monitor - conceptual design report |
Mark J Bowden et al. |
Emittance
Ion Profile Monitor
Instrumentation
Beam Transfer
Beam ramp
|
02 Oct 2003 |
763-v1 |
Accelerator Physics Basics |
Michael J. Syphers |
BPM
Multiparticle
BPM
General
|
07 Aug 2003 |
587-v3 |
Performance of a Beam Monitor in the Fermilab Tevatron Using Synchrotron Light |
Harry Cheung et al. |
SyncLite (SL)
|
03 Aug 2003 |
758-v2 |
Tevatron Study Results, New Chromaticity Application |
Paul Lebrun |
chromaticity
|
01 Aug 2003 |
637-v2 |
Tevatron progress report: March-May'2003 |
Vladimir Shiltsev |
Tevatron Group
Status
|
04 Jun 2003 |
379-v2 |
RECYCLER BPM SYSTEM UPGRADE |
Ming-jen Yang |
BPM
|
13 Jan 2003 |
163-v1 |
Recycler Flying Wire Meeting Minutes - Oct 29, 2002 |
Peter J. Wilson |
RR2003Winter
Beam Instrumentation
|
10 Dec 2002 |
492-v0 |
Minutes of Recycler Flying Wire Meeting - March 4, 2003 |
Peter J. Wilson |
RR2003Winter
Beam Instrumentation
Flying Wires
Flying Wires
|
11 Mar 2003 |
1148-v4 |
FERMILAB COORDINATE SYSTEMS |
Babatunde Oshinowo |
Alignment
Alignment
Alignment
Alignment
Alignment
Alignment
Alignment
|
15 May 1997 |