8883-v1 |
Linac BPM Documents |
Elliott S McCrory |
BPM
Beam Instrumentation
|
23 Nov 2020 |
8684-v1 |
Scenarios for an 8 GeV Linac Booster Replacement |
David V Neuffer |
Beam Physics
Linac
|
23 Sep 2020 |
6811-v6 |
AD/Instrumentation Status Meeting Minutes and Slides |
Craig C Drennan |
Monitoring Instrumentation
Beam Instrumentation
Beam Instrumentation
IOTA
Beamline
Beam Instrumentation
PXIE
FAST
Beam Instrumentation
Instrumentation
|
04 May 2020 |
740-v1 |
Instrumentation Breakout for DOE Run II Review July 2003 |
Keith E Gollwitzer et al. |
Talks
Beam Instrumentation
BPM
Beam Instrumentation
Instrumentation
Beam Instrumentation
ACNET
Electron Cooling
Beam Instrumentation
|
23 Apr 2020 |
5322-v7 |
Sequenced Chassis Control Card, Linac Marx Modulator System Specification |
Craig C Drennan et al. |
Upgrades
|
07 Apr 2020 |
929-v3 |
ACL An Introduction |
Brian S. Hendricks |
General
Controls
Controls
Controls Working Group
Controls
Synoptic
Console Applications
ACL
ACNET
Controls
Controls
|
27 Sep 2019 |
7330-v1 |
Linac operation status, goal and plan |
Kiyomi Seiya |
Linac
|
23 May 2019 |
6973-v2 |
Documentation for the Universal Clock Decoder discussions of support and updates. |
Craig C Drennan |
Controls
Controls
BPM
Front-end Systems
Magnets
Controls
Power Supplies
Hardware
Controls
Power Supplies
Data Acquisition
|
31 Jan 2019 |
6886-v1 |
RIL Simulation: MEBT |
Valery Kapin |
Linac
|
04 Dec 2018 |
6765-v1 |
Proton Source and PIP2IT 10 year labor forcast |
William A Pellico |
Booster
Upgrades
Linac
|
19 Oct 2018 |
5555-v2 |
Preliminary Considerations for a Muon Spin Rotation/Relaxation/Resonance (muSR) Facility at the Fermilab MuCool Test Area (MTA) |
Peter Garbincius |
Other
|
21 Jun 2017 |
5364-v2 |
Prospects for a Muon Spin Resonance Facility in the MuCool Test Area |
John A. Johnstone |
External Beams
Muon
Linac
|
17 Apr 2017 |
5254-v1 |
Laser Nothcher Status 10-19-2016 |
David E. Johnson et al. |
Projects
PIP
|
19 Oct 2016 |
5184-v8 |
Design Notes Of The Regulated Current Arc Modulator For The FNAL H- Source |
Dan Bollinger et al. |
Pre-Accelerator
|
03 Oct 2016 |
5206-v1 |
PIP Status Report Meeting |
David E. Johnson et al. |
PIP
Linac
|
11 Aug 2016 |
5097-v2 |
Laser Notcher Status |
David E. Johnson |
Projects
Projects
PIP
|
02 Mar 2016 |
5042-v1 |
Tipping Analysis for 3 Point Stands |
Kris A Anderson |
Magnets
Design Properties
Other
Other
Civil
Other
Magnets
|
11 Jan 2016 |
4941-v1 |
RFQ magnet study |
James T. Volk |
Pre-Accelerator
|
03 Sep 2015 |
4920-v1 |
PIP Status Report Meeting |
Ryan Crawford et al. |
Booster
PIP
Linac
|
12 Aug 2015 |
4893-v1 |
PIP Status Report Meeting |
Trevor A Butler et al. |
PIP
Upgrades
|
22 Jul 2015 |
4775-v1 |
Performing Vacuum Calculations Using ANSYS |
Kris A Anderson |
Vacuum
Vacuum
Vacuum
Vacuum
Vacuum
Vacuum/Water/Utilities
Vacuum
|
27 Feb 2015 |
4774-v1 |
PIP Status Report Meeting |
Trevor A Butler et al. |
PIP
Linac
Upgrades
|
25 Feb 2015 |
4733-v1 |
Impact of Laser Notcher on Radiation in MEBT |
David E. Johnson |
Projects
ES&H
|
22 Dec 2014 |
4724-v1 |
PIP Status Report Meeting |
David E. Johnson |
PIP
Linac
|
10 Dec 2014 |
4719-v1 |
Enhancements of the Fermilab Booster to Reduce Losses and Extend Lifetime: The Proton Improvement Plan |
Robert M Zwaska |
Booster
PIP
Linac
|
30 Nov 2014 |
4712-v1 |
PIP Status Report Meeting |
Ryan Crawford et al. |
Booster
PIP
Linac
|
19 Nov 2014 |
4711-v1 |
Laser Notcher Pulse Energy Requirements & Demonstration Experiment |
David E. Johnson et al. |
PIP
Upgrades
|
19 Nov 2014 |
4693-v1 |
PIP Status Report Meeting |
Trevor A Butler et al. |
PIP
Linac
Upgrades
|
29 Oct 2014 |
4684-v1 |
PIP General Meeting Status Update |
Keith E Gollwitzer |
Booster
PIP
Linac
Regular Meetings
|
16 Oct 2014 |
4021-v2 |
PIP Linac Modulator Specification Data |
Trevor A Butler et al. |
PIP
Linac
|
22 Sep 2014 |
4667-v1 |
FNAL H- ion source and LEBT |
Dan Bollinger et al. |
Pre-Accelerator
|
10 Sep 2014 |
4662-v1 |
Superconducting Linac in Fermilab |
Paul Derwent et al. |
Accelerator Seminar
Linac
Upgrades
|
26 Aug 2014 |
4661-v2 |
PIP Shutdown Meeting - Laser Notcher Status |
David E. Johnson |
Booster
Upgrades
|
20 Aug 2014 |
4649-v5 |
PIP Linac Notcher - September Readiness Review |
Jean-Paul Carneiro et al. |
PIP
Upgrades
|
13 Aug 2014 |
4646-v1 |
PIP Status Report Meeting |
Ken Domann et al. |
Beam Dynamics
PIP
Linac
|
02 Aug 2014 |
4632-v2 |
Recommissioning Linac Bunche Length Detector BLD-03 |
Elliott S McCrory et al. |
Beam Instrumentation
Instrumentation
|
11 Jul 2014 |
4537-v2 |
Linac Laser Notcher Project in the Proton Improvement Plan |
Kevin Duel et al. |
Pre-Accelerator
Accelerator Seminar
Booster
Linac
|
01 Apr 2014 |
4534-v1 |
35 Years of H- Ions at Fermilab |
Dan Bollinger |
Pre-Accelerator
Accelerator Seminar
PIP
|
06 Feb 2014 |
3781-v2 |
Proton Source Improvement Plan 2011 |
Valeri A Lebedev et al. |
Booster
Linac
|
03 Feb 2014 |
4499-v1 |
3-CELL TEST RESULTS & 9-CELL PLAN |
Howard Pfeffer |
HLRF
PIP
|
18 Dec 2013 |
3646-v16 |
A 750keV LINAC INJECTOR UPGRADE PLAN |
William A Pellico et al. |
Upgrades
|
11 Dec 2013 |
4340-v2 |
Accuracy and Performance Upgrade of PIC and Hybrid Space-Charge Solvers |
Leonid Vorobiev |
Beam Dynamics
Beam Dynamics
Beam Dynamics
Multiparticle
|
12 Nov 2013 |
4454-v1 |
Source Development |
Dan Bollinger |
Pre-Accelerator
PIP
|
24 Sep 2013 |
4441-v1 |
Laser Notcher Status 9_11_2013 |
David E. Johnson et al. |
Upgrades
|
11 Sep 2013 |
4420-v1 |
Linac Bunch Length Detector Pictures |
Elliott S McCrory |
Beam Instrumentation
|
01 Aug 2013 |
4306-v1 |
Linac Laser Notcher Status |
David E. Johnson |
Projects
PIP
|
28 Jun 2013 |
4380-v2 |
The FNAL 400 MeV Linac in TRACEWIN |
Jean-Paul Carneiro |
PIP
Linac
|
11 Jun 2013 |
4363-v2 |
Plans for Booster & Linac Transformer Installation |
Ryan Crawford |
Booster
Upgrades
PIP
Linac
Upgrades
|
08 May 2013 |
4334-v1 |
Linac Modulator Upgrade |
Trevor A Butler |
PIP
Linac
Upgrades
|
03 Apr 2013 |
4324-v1 |
A High-Power Magnetron Transmitter for Superconducting Intensity Frontier Linacs |
Grigory Kazakevich |
Future Accelerators
Adv. Accelerator R&D
Linac
|
26 Mar 2013 |
4126-v2 |
A 1-GeV Accumulator Ring in the Booster Tunnel |
Chuck Ankenbrandt et al. |
Booster
Project X
Linac
|
13 Mar 2013 |
4308-v1 |
Linac BPM Status Update |
Elliott S McCrory |
BPM
Beam Instrumentation
Console Applications
PIP
Beam Instrumentation
|
06 Mar 2013 |
4293-v1 |
Status of Low-Energy Linac Lattice Update |
Valery Kapin |
Beam Dynamics
PIP
|
13 Feb 2013 |
4283-v1 |
Linac BPM Commissioning Notes |
Elliott S McCrory |
BPM
Beam Instrumentation
Front-end Systems
Beam Instrumentation
|
31 Jan 2013 |
4276-v1 |
Applications for Linac BPMs |
Elliott S McCrory |
BPM
Beam Instrumentation
Java Appl Framework
Beam Instrumentation
|
29 Jan 2013 |
4264-v3 |
Scaling factors for the Linac BPMs |
Matthew H Gardner et al. |
Data Loggers
BPM
Beam Instrumentation
Upgrades
|
23 Jan 2013 |
4262-v1 |
Linac Low Energy Modulators Status Update |
Howard Pfeffer |
HLRF
PIP
|
19 Dec 2012 |
4232-v2 |
Linac BPM upgrade 805MHz phase signal system |
Elliott S McCrory |
BPM
Beam Instrumentation
PIP
|
06 Dec 2012 |
4256-v3 |
PIP - Linac Startup Plan |
Fernanda G Garcia |
Operations
PIP
Linac
|
05 Dec 2012 |
4251-v2 |
RFQ Linac Matching. Numerical optimization. |
Leonid Vorobiev |
Beam Dynamics
Transverse Dynamics
PIP
|
27 Nov 2012 |
4246-v1 |
Project Status Update |
Ken Domann et al. |
Projects
Projects
PIP
|
09 Nov 2012 |
4240-v1 |
PIP - General Info |
William A Pellico et al. |
Booster
PIP
Linac
|
24 Oct 2012 |
4236-v1 |
Proton Improvement Plan - S&T Review |
William A Pellico |
Booster
PIP
Linac
|
04 Oct 2012 |
4228-v1 |
Linac MCC/Transformer, Hatch, Booster Transformers, Anode Supply |
Ryan Crawford |
Booster
Upgrades
PIP
Linac
Upgrades
|
25 Sep 2012 |
4220-v1 |
9/19/2012 PIP meeting Source talk |
Dan Bollinger |
Pre-Accelerator
PIP
|
19 Sep 2012 |
4213-v1 |
RFQ Injector Installation Updates: Point of no return!!!!! (05 Sep 12 Sep 2012) |
Cheng-Yang Tan |
Pre-Accelerator
|
12 Sep 2012 |
4211-v2 |
RFQ Injector Installation Updates (29 Aug 05 Sep 2012) |
Cheng-Yang Tan |
Pre-Accelerator
|
05 Sep 2012 |
4210-v1 |
RFQ PA Systems |
Brian Schupbach |
Pre-Accelerator
PIP
Upgrades
|
30 Aug 2012 |
4206-v2 |
RFQ Injector Installation Updates (22 Aug 29 Aug 2012) |
Cheng-Yang Tan |
Pre-Accelerator
|
29 Aug 2012 |
4196-v2 |
RFQ Injector fixes and Performance/Reliability testing |
Cheng-Yang Tan |
Pre-Accelerator
|
15 Aug 2012 |
4195-v1 |
Linac Substation L1 & Booster Substation Y-BE2 --- Update #3 |
Ryan Crawford |
Booster
Upgrades
PIP
Linac
Upgrades
|
15 Aug 2012 |
4194-v2 |
The RFQ Injector Upgrade |
Cheng-Yang Tan |
Pre-Accelerator
|
10 Aug 2012 |
4192-v1 |
Linac 400 MeV BPM Status |
Nathan Eddy |
Beam Instrumentation
PIP
|
08 Aug 2012 |
4191-v4 |
RF Measurement results of buncher cavity for linac pre-injector upgrade |
Ding Sun et al. |
Pre-Accelerator
|
02 Aug 2012 |
4186-v1 |
RFQ tests of new rods |
Cheng-Yang Tan |
Pre-Accelerator
|
27 Jul 2012 |
3889-v3 |
Linac Beam Velocity Measurement |
Craig C Drennan |
Operations
Controls
Beam Instrumentation
Front-end Systems
Operations
Beam Instrumentation
|
24 Jul 2012 |
3940-v1 |
Linac Toroid Upgrade Meeting Summaries -- Sept, 2, 2011 -- Oct. 27, 2011 |
Craig C Drennan |
Beam Instrumentation
Front-end Systems
Intensity Measurements
|
16 Jul 2012 |
4174-v1 |
Pre-injector Upgrade Update (09 May 2012 05 Jul 2012) |
Cheng-Yang Tan |
Pre-Accelerator
|
05 Jul 2012 |
4168-v1 |
PIP - General Info |
Robert M Zwaska |
Booster
PIP
Linac
|
27 Jun 2012 |
4167-v2 |
PIP - Linac: Substation L1 & MCC Upgrade |
Ryan Crawford |
PIP
Linac
|
27 Jun 2012 |
4165-v1 |
If You Build It, They Will Come , 8GeV CW Linac: A Staged Approach |
Milorad B. Popovic |
Accelerator Seminar
Booster
Project X
Linac
|
27 Jun 2012 |
4155-v1 |
PIP - Linac: BPM Readout Upgrade - Status Report |
Nathan Eddy |
Beam Instrumentation
Linac
Upgrades
|
12 Jun 2012 |
4130-v3 |
Results of RFQ "fixes" |
Cheng-Yang Tan |
Pre-Accelerator
|
17 May 2012 |
4120-v2 |
Pre-injector Upgrade Update (11 Apr 2012 25 Apr 2012) |
Cheng-Yang Tan |
Pre-Accelerator
|
26 Apr 2012 |
4114-v1 |
Proton source shutdown schedule |
Mary Convery |
Booster
Linac
|
18 Apr 2012 |
4110-v1 |
Pre-injector Upgrade Updates (28 Mar 2012 11 Apr 2012) |
Cheng-Yang Tan |
Pre-Accelerator
|
11 Apr 2012 |
4108-v1 |
A Concept: 8 GeV CW Linac, Staged Approach |
Milorad B. Popovic |
Booster
Project X
Linac
|
10 Apr 2012 |
4102-v2 |
Pre-injector Upgrade Updates (14 Mar 2012 28 Mar 2012) |
Cheng-Yang Tan |
Pre-Accelerator
|
28 Mar 2012 |
4101-v1 |
Linac 400MeV Steer program |
Kyle J Hazelwood |
Beam Instrumentation
Controls
Operations
Console Applications
Operations
|
27 Mar 2012 |
4098-v1 |
Synoptic Overview |
Alex Waller |
Controls
Controls
|
21 Mar 2012 |
4097-v1 |
PIP - Linac: 200MHz Modulator Upgrade - Status Report |
Trevor A Butler |
PIP
Linac
Upgrades
|
21 Mar 2012 |
4096-v1 |
PIP - Linac: Substation L1 & MCC Upgrade |
Ryan Crawford |
PIP
Linac
Upgrades
|
20 Mar 2012 |
4087-v3 |
Pre-injector Upgrade Updates (29 Feb 2012 14 Mar 2012) |
Cheng-Yang Tan |
Pre-Accelerator
|
14 Mar 2012 |
4083-v1 |
PIP - General Info |
William A Pellico et al. |
Booster
PIP
Linac
|
07 Mar 2012 |
4077-v1 |
Pre-injector Upgrade Updates (15 Feb 2012 29 Feb 2012) |
Cheng-Yang Tan |
Pre-Accelerator
|
29 Feb 2012 |
4071-v2 |
Pre-injector Upgrade Updates (01 Feb 2012 15 Feb 2012) |
Cheng-Yang Tan |
Pre-Accelerator
|
15 Feb 2012 |
4062-v1 |
Beam to Muon g-2 and Mu2e Experiments from Recycler |
Milorad B. Popovic |
Booster
PIP
Recycler
Linac
|
03 Feb 2012 |
4059-v2 |
Pre-injector Upgrade Updates (18 Jan 2012 01 Feb 2012) |
Cheng-Yang Tan |
Pre-Accelerator
|
01 Feb 2012 |
4045-v3 |
Pre-injector Upgrade Updates (04 Jan 2012 18 Jan 2012) |
Cheng-Yang Tan |
Pre-Accelerator
|
18 Jan 2012 |
4042-v3 |
Status of Linac Lattice Study |
H.J Kim |
Beam Physics
PIP
Linac
|
11 Jan 2012 |
4033-v2 |
Pre-injector Upgrade Updates (21 Dec 2011 04 Jan 2012) |
Cheng-Yang Tan |
Pre-Accelerator
|
04 Jan 2012 |
4027-v2 |
Pre-injector Upgrade Updates (07 Dec 2011 21 Dec 2011) |
Cheng-Yang Tan |
Pre-Accelerator
|
21 Dec 2011 |
4022-v1 |
Proton source 2012 shutdown schedule |
Mary Convery |
Booster
Linac
|
14 Dec 2011 |
4014-v1 |
Pre-injector Upgrade Updates (23 Nov 2011 07 Dec 2011) |
Cheng-Yang Tan |
Pre-Accelerator
|
07 Dec 2011 |
4005-v2 |
Pre-injector Upgrade Updates (09 Nov 2011 26 Nov 2011) |
Cheng-Yang Tan |
Pre-Accelerator
|
23 Nov 2011 |
4007-v3 |
Linac L1 Substation Upgrade |
Steven L. Hays |
PIP
Upgrades
|
23 Nov 2011 |
3770-v2 |
Meeting Minutes: Linac and 400 MeV Beam Position Monitor Upgrade |
Craig C Drennan et al. |
Beam Instrumentation
|
23 Nov 2011 |
3990-v2 |
Pre-injector Upgrade Updates (26 Oct 2011 09 Nov 2011) |
Cheng-Yang Tan |
Pre-Accelerator
|
09 Nov 2011 |
3985-v1 |
PIP - Linac:7835 Procurement Strategy |
Fernanda G Garcia |
Operations
Projects
PIP
Linac
Upgrades
|
02 Nov 2011 |
3979-v1 |
Linac RF Modulators New Specifications |
Trevor A Butler |
PIP
Linac
|
01 Nov 2011 |
3978-v1 |
Pre-injector Upgrade Updates (12 Oct 2011 26 Oct 2011) |
Cheng-Yang Tan |
Pre-Accelerator
|
26 Oct 2011 |
3966-v1 |
Pre-injector Upgrade Updates (28 Sep 2011 12 Oct 2011) |
Cheng-Yang Tan |
Pre-Accelerator
|
12 Oct 2011 |
3789-v2 |
NTF BPM: Note on the New BPM Installation In the NTF Beam Line |
Craig C Drennan |
NTF
|
06 Oct 2011 |
3953-v1 |
Pre-injector Upgrade Updates (14 Sep 2011 28 Sep 2011) |
Cheng-Yang Tan |
Pre-Accelerator
|
28 Sep 2011 |
3948-v2 |
Toroid Requirements in the Linac |
Craig C Drennan et al. |
Beam Instrumentation
|
20 Sep 2011 |
3943-v3 |
Pre-injector Upgrade Updates (17 Aug 2011 14 Sep 2011) |
Cheng-Yang Tan |
Pre-Accelerator
|
14 Sep 2011 |
3941-v1 |
A Review of the RFQ Based Pre-injector for the Fermilab Linac |
George E. Krafczyk et al. |
Linac
|
13 Sep 2011 |
3801-v4 |
Beam Position Monitor Requirements in the Linac and 400 MeV Line |
Craig C Drennan |
Beam Instrumentation
Upgrades
|
12 Sep 2011 |
3936-v1 |
Linac/400 MeV BPM System Plans and Status |
Nathan Eddy |
BPM
BPM
PIP
Upgrades
|
07 Sep 2011 |
3935-v2 |
Proton Source Vacuum Plan |
David Augustine |
Booster
PIP
Vacuum
Linac
Vacuum
|
02 Sep 2011 |
3932-v1 |
Linac Momentum Dump Vacuum Repair - Final Design 2011 |
Robert E Reilly |
PIP
Other
Vacuum
Linac
|
31 Aug 2011 |
3926-v1 |
Proton Improvement Plan -- Preliminary Overview of FY12 |
Bob Webber |
Booster
PIP
Linac
|
24 Aug 2011 |
3923-v2 |
Pre-injector Upgrade Updates (03 Aug 2011 17 Aug 2011) |
Cheng-Yang Tan |
Pre-Accelerator
|
17 Aug 2011 |
3914-v2 |
Pre-injector Upgrade Updates (20 Jul 2011 03 Aug 2011) |
Cheng-Yang Tan |
Pre-Accelerator
|
03 Aug 2011 |
3907-v2 |
Pre-injector Upgrade Updates (06 Jul 2011 20 Jul 2011) |
Cheng-Yang Tan |
Pre-Accelerator
|
20 Jul 2011 |
3904-v2 |
Linac 200 MHz Power Systems Meeting Minutes |
Bob Webber |
HLRF
Linac
|
15 Jul 2011 |
3903-v1 |
Proton Source Improvement Plan Overview |
Bob Webber |
Booster
Linac
|
13 Jul 2011 |
3897-v2 |
Pre-injector Upgrade Updates (22 Jun 2011 06 Jul 2011) |
Cheng-Yang Tan |
Pre-Accelerator
|
06 Jul 2011 |
3886-v1 |
Linac Lattice Studies |
Dave McGinnis |
Linac
|
23 Jun 2011 |
3885-v2 |
Pre-injector Upgrade Updates (01 Jun 2011 22 Jun 2011) |
Cheng-Yang Tan |
Pre-Accelerator
|
22 Jun 2011 |
3878-v1 |
Proton Source Improvement Plan to DOE in March 2011 |
Stuart Henderson |
Booster
Linac
|
03 Jun 2011 |
3877-v5 |
Pre-injector Upgrade Updates (11 May 2011 01 Jun 2011) |
Cheng-Yang Tan |
Pre-Accelerator
|
01 Jun 2011 |
3868-v1 |
Back of the Envelope Calculation of the RF coupling beta for the FNAL H- Injector RFQ |
Cheng-Yang Tan |
Pre-Accelerator
|
13 May 2011 |
3865-v3 |
Pre-injector Upgrade Updates (27 Apr 2011 11 May 2011) |
Cheng-Yang Tan |
Pre-Accelerator
|
11 May 2011 |
3858-v3 |
Pre-injector Upgrade Updates (13 Apr 2011 27 Apr 2011) |
Cheng-Yang Tan |
Pre-Accelerator
|
27 Apr 2011 |
3810-v1 |
RFQ Testing Timeline |
Cheng-Yang Tan |
Pre-Accelerator
|
13 Apr 2011 |
3809-v1 |
Pre-injector Upgrade Updates (30 Mar 2011 13 Apr 2011) |
Cheng-Yang Tan |
Pre-Accelerator
|
13 Apr 2011 |
3804-v1 |
Pre-injector Upgrade Updates (16 Mar 2011 30 Mar 2011) |
Cheng-Yang Tan |
Pre-Accelerator
|
30 Mar 2011 |
3796-v1 |
Note on solving QL for flat gradients at FLASH ACC6 and ACC7 |
Julien Branlard |
LLRF
ILCTA
|
17 Mar 2011 |
3793-v1 |
Pre-injector Upgrade Updates (02 Mar 2011 16 Mar 2011) |
Cheng-Yang Tan |
Pre-Accelerator
|
16 Mar 2011 |
3792-v1 |
Einzel Lens Chopper Transmission Line Mismatches |
Cheng-Yang Tan |
Pre-Accelerator
|
15 Mar 2011 |
3787-v2 |
Pre-injector Upgrade Updates (09 Feb 2011 02 Mar 2011) |
Cheng-Yang Tan |
Pre-Accelerator
|
02 Mar 2011 |
3777-v1 |
Pre-injector Upgrade Updates (19 Jan 2011 09 Feb 2011) |
Cheng-Yang Tan |
Pre-Accelerator
|
09 Feb 2011 |
3769-v1 |
Pre-injector Upgrade Updates (22 Dec 2010 19 Jan 2011) |
Cheng-Yang Tan |
Pre-Accelerator
|
19 Jan 2011 |
3767-v1 |
Meeting Minutes: Linac Multi-Wires in the Momentum Dump Line |
Craig C Drennan |
Beam Instrumentation
Operations
Studies
Linac
Upgrades
|
05 Jan 2011 |
3766-v1 |
A Statistical Study of Proton Source Down Time |
Dave McGinnis |
Booster
Spares and Maintenance
Operations
Spares and Maintenance
Operations
Projects
Projects
Linac
|
29 Dec 2010 |
3762-v2 |
Proton Source Workshop Wednesday 12/8/2010 Afternoon Session |
Robert M Zwaska |
Booster
Linac
|
28 Dec 2010 |
3720-v1 |
Proton Source December 2010 Workshop Opening |
Bob Webber |
Booster
Linac
|
22 Dec 2010 |
3764-v1 |
Pre-injector Upgrade Updates (01 Dec 2010 22 Dec 2010) |
Cheng-Yang Tan |
Pre-Accelerator
|
22 Dec 2010 |
3761-v1 |
Wednesday Morning Session Summary |
Ron Moore |
Booster
Linac
|
20 Dec 2010 |
3760-v1 |
Proton Source Workshop Tuesday 12/7/2010 Morning Session Summary |
Elmie Peoples |
Booster
Linac
|
20 Dec 2010 |
3745-v1 |
Linac RF Modulators and Related RF Power Systems |
Trevor A Butler |
HLRF
Linac
|
08 Dec 2010 |
3724-v1 |
Linac Momentum Dump |
Robert E Reilly |
Other
|
08 Dec 2010 |
3747-v1 |
PreAcc/Linac Downtime Statistics |
Fernanda G Garcia |
Pre-Accelerator
Operations
Linac
|
08 Dec 2010 |
3732-v1 |
Linac and Booster Radiation Shielding Status, Plans and Constraints |
John E Anderson |
Booster
ES&H
ES&H
Linac
|
08 Dec 2010 |
3729-v2 |
Machine Operating Description - Linac |
Fernanda G Garcia |
Operations
|
08 Dec 2010 |
3738-v1 |
Machine Operating Description - PreAcc |
Dan Bollinger |
Pre-Accelerator
Operations
|
08 Dec 2010 |
3726-v2 |
Linac Frontend Upgrade Report |
Cheng-Yang Tan |
Pre-Accelerator
|
07 Dec 2010 |
3744-v1 |
Proton Source December 2010 Workshop Registrants |
Bob Webber |
Booster
Linac
|
07 Dec 2010 |
3730-v3 |
Linac and Booster Beam Diagnostics |
Craig C Drennan |
Beam Instrumentation
Beam Instrumentation
|
07 Dec 2010 |
3739-v1 |
Objectives of the Proton Improvement Plan |
Stuart Henderson |
Booster
Linac
|
07 Dec 2010 |
3719-v6 |
Proton Source December 2010 Workshop Agenda |
Bob Webber |
Booster
Linac
|
06 Dec 2010 |
3735-v1 |
Opening of 2010 Proton Source Workshop |
Bob Webber |
Booster
Linac
|
06 Dec 2010 |
3733-v1 |
Linac-Booster Beam Interface |
Valeri A Lebedev |
Beam Dynamics
Beam Dynamics
|
06 Dec 2010 |
3731-v1 |
Proton Source Workshop - task force report |
William A Pellico |
Booster
Linac
|
06 Dec 2010 |
3722-v2 |
Pre-injector Upgrade Updates (10 Nov 01 Dec 2010) |
Cheng-Yang Tan |
Pre-Accelerator
|
02 Dec 2010 |
3711-v1 |
Pre-injector Upgrade Updates (27 Oct 10 Nov 2010) |
Cheng-Yang Tan |
Pre-Accelerator
|
10 Nov 2010 |
3708-v1 |
Proton Source Task Force Talk - APT_Seminar |
William A Pellico |
Booster
Linac
|
04 Nov 2010 |
3701-v1 |
Pre-injector Upgrade Updates (13 Oct 27 Oct 2010) |
Cheng-Yang Tan |
Pre-Accelerator
|
27 Oct 2010 |
3695-v1 |
Pre-injector Upgrade Updates (29 Sep 13 Oct 2010) |
Cheng-Yang Tan |
Pre-Accelerator
|
13 Oct 2010 |
3689-v1 |
Task Force Report - Directorate Meeting |
William A Pellico |
Upgrades
Upgrades
|
05 Oct 2010 |
3684-v1 |
Pre-injector Upgrade Updates (15 Sep 29 Sep 2010) |
Cheng-Yang Tan |
Pre-Accelerator
|
29 Sep 2010 |
3678-v1 |
MFC DSP Software Outline |
Philip Varghese |
LLRF
LLRF
ILCTA
LLRF
|
23 Sep 2010 |
3676-v1 |
Multi‐cavity Field Control (MFC) Module Description |
Philip Varghese |
LLRF
LLRF
LLRF
NML
|
23 Sep 2010 |
3672-v1 |
Pre-injector Upgrade Updates (01 Sep 15 Sep 2010) |
Cheng-Yang Tan |
Pre-Accelerator
|
15 Sep 2010 |
3667-v1 |
Continued Monitoring of the Conditioning of the Fermilab Linac 805 MHz Cavities |
Fernanda G Garcia et al. |
Operations
|
09 Sep 2010 |
3663-v1 |
Pre-injector Upgrade Updates (18 Aug 01 Sep 2010) |
Cheng-Yang Tan |
Pre-Accelerator
|
01 Sep 2010 |
3660-v4 |
Proton Source Task Force Report |
William A Pellico |
Booster
Linac
|
26 Aug 2010 |
3658-v1 |
Pre-injector Upgrade Updates (13 Jul 18 Aug 2010) |
Cheng-Yang Tan |
Pre-Accelerator
|
18 Aug 2010 |
3633-v1 |
Pre-injector Upgrade Updates (09 Jun 30 Jun 2010) |
Cheng-Yang Tan |
Pre-Accelerator
|
30 Jun 2010 |
3625-v1 |
Pre-injector Upgrade Updates (26 May 09 Jun 2010) |
Cheng-Yang Tan |
Pre-Accelerator
|
09 Jun 2010 |
3616-v2 |
Pre-injector Upgrade Updates (12 May - 26 May 2010) |
Cheng-Yang Tan |
Pre-Accelerator
|
26 May 2010 |
3608-v1 |
Pre-injector Upgrade Updates (29 Apr 12 May 2010) |
Cheng-Yang Tan |
Pre-Accelerator
|
12 May 2010 |
3601-v1 |
Pre-injector Upgrade Updates (14 Apr 28 Apr 2010) |
Cheng-Yang Tan |
Pre-Accelerator
|
28 Apr 2010 |
3599-v1 |
Chopping in the H- Source |
Robyn L Madrak et al. |
Studies
|
22 Apr 2010 |
3595-v2 |
Pre-injector Upgrade Updates (31 Mar 14 Apr 2010) |
Cheng-Yang Tan |
Pre-Accelerator
|
14 Apr 2010 |
3581-v1 |
Pre-injector Upgrade Updates (31 Mar 2010) |
Cheng-Yang Tan |
Pre-Accelerator
|
31 Mar 2010 |
3575-v1 |
Pre-Injector Overview & Goals |
Cheng-Yang Tan |
Pre-Accelerator
|
17 Mar 2010 |
3549-v1 |
Linac Briefing to the Directorate - August 2002 |
Bob Webber |
Pre-Accelerator
Spares and Maintenance
Operations
Linac
Upgrades
|
11 Feb 2010 |
3545-v1 |
CW SRF H- LINAC AS A PROTON DRIVER FOR MUON COLLIDERS AND NEUTRINO FACTORIES |
Chuck Ankenbrandt et al. |
Project X
Linac
|
03 Feb 2010 |
3506-v1 |
Linac and A0 water temperature regulation |
James L. Crisp |
HLRF
Controls
Operations
Water
Linac
|
24 Nov 2009 |
3505-v1 |
HINS MDB Ion Source Safety Documents |
Roger Dixon et al. |
Project X
Linac
|
23 Nov 2009 |
2616-v13 |
HINS R&D Activities at Meson Detector Building |
Jim Steimel et al. |
Future Accelerators
Adv. Accelerator R&D
Linac
Proton Driver
|
22 Oct 2009 |
3456-v1 |
HINS - LLRF |
Julien Branlard |
LLRF
Project X
|
23 Sep 2009 |
3444-v1 |
9mA beam current study at FLASH - DESY |
Julien Branlard et al. |
LLRF
|
01 Sep 2009 |
3443-v1 |
Operational Solution to Obtaining a Flat Vector Sum from Multiple Cavities with Gradient Disparities |
Julien Branlard et al. |
LLRF
|
01 Sep 2009 |
3442-v1 |
Coupling Adjustments for Cavities with Gradient Disparities |
Julien Branlard et al. |
LLRF
|
01 Sep 2009 |
3428-v1 |
Fermilab Low Energy Linac Low Level RF Upgrade Engineering Notes and Operational Guide |
Edward W. Cullerton et al. |
LLRF
LLRF
|
13 Aug 2009 |
3400-v1 |
A Hybrid Design of Project-X |
Weiren Chou |
Project X
Linac
|
21 May 2009 |
3396-v1 |
Report: Temporal jitter studies at the A0 photoinjector |
Timothy J Maxwell et al. |
Beam Instrumentation
|
18 May 2009 |
3384-v1 |
PHASE AND FREQUENCY LOCKED MAGNETRONS FOR SRF SOURCES |
Rol Johnson et al. |
HLRF
Linac
|
06 May 2009 |
3343-v1 |
HINS Beam Dynamics & Diagnostics Mini-Workshop |
Jean-Paul Carneiro et al. |
Beam Dynamics
Future Accelerators
Beam Instrumentation
Adv. Accelerator R&D
Linac
Instrumentation
|
20 Mar 2009 |
3331-v1 |
Simulation of a LINAC RF station |
Julien Branlard |
LLRF
|
11 Mar 2009 |
3310-v1 |
Nuclear Applications of Accelerators; Experience in the 'A' Programs (APT, ATW, AAA, AFCI) |
Laurie Waters |
Accelerator Seminar
Linac
|
18 Feb 2009 |
3301-v2 |
Analysis of RFQ Vacuum System for HINS Tests at MDB |
Henryk Piekarz |
Vacuum
Linac
Proton Driver
|
18 Feb 2009 |
3269-v1 |
A 750 keV RFQ for the Fermilab Linac |
Milorad B. Popovic |
Pre-Accelerator
Linac
Upgrades
|
17 Dec 2008 |
3265-v1 |
Visit to BNL 17-19 Nov 2008 |
Dan Bollinger et al. |
Pre-Accelerator
|
08 Dec 2008 |
3224-v1 |
AN 8 GEV CW LINAC WITH HIGH POTENTIAL BEAM POWER |
Chuck Ankenbrandt et al. |
Project X
Linac
|
07 Oct 2008 |
3168-v1 |
g-2 at Fermilab |
Chuck Ankenbrandt et al. |
Booster
Recycler
Upgrades
Linac
EXP Notes
Antiproton Source
|
28 Jul 2008 |
3155-v1 |
Evolutionary Optimization Methods for Accelerator Design |
Alexei Poklonskiy |
Accelerator Seminar
Beam Dynamics
Beam Dynamics
Future Accelerators
|
09 Jul 2008 |
3124-v1 |
FNAL Accelerator Complex Status |
Ron Moore |
External Beams
Booster
Main Injector
Tevatron
Operations
Recycler
Linac
Antiproton Source
|
20 Jun 2008 |
3081-v1 |
HINS Talk to AD Controls Dept - April 2008 |
Bob Webber |
Project X
Linac
Proton Driver
Controls
|
29 Apr 2008 |
3056-v1 |
H- Ion Source Spec for HINS and Considerations for Project X H- Ion Source |
Charles W. Schmidt et al. |
Pre-Accelerator
Other
Project X
Linac
Proton Driver
|
19 Mar 2008 |
3042-v1 |
Linac 805 MHz LLRF manual |
Ralph Pasquinelli |
LLRF
|
22 Feb 2008 |
2986-v2 |
HINS R&D Program Goals Statement |
Bob Webber |
Project X
Linac
Proton Driver
|
23 Jan 2008 |
2918-v1 |
Overview of HINS Operations and Radiation Shielding Considerations in MDB |
Bob Webber |
Linac
Proton Driver
|
05 Nov 2007 |
2745-v2 |
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac |
Bob Webber |
Linac
Proton Driver
|
16 Apr 2007 |
2716-v1 |
Delivering Muons to the MuCool Test Area |
Chuck Ankenbrandt et al. |
Booster
Muon Collider
Linac
Muon Collider R&D
|
23 Mar 2007 |
2693-v1 |
HINS Presentation to AD Department Heads |
Bob Webber |
Linac
Proton Driver
|
16 Mar 2007 |
2634-v0 |
Effect of Possible Furlough on the Fermilab Neutron Therapy Facility |
Eric J Prebys |
Pre-Accelerator
Operations
NTF
|
06 Feb 2007 |
2589-v3 |
Studies of the stability of the Dispersion Free Steering method |
Paul Lebrun |
Beam Dynamics
Adv. Accelerator R&D
|
24 Jan 2007 |
2605-v1 |
survey of H- ion sources for accelerators |
Jens Peters |
Pre-Accelerator
Accelerator Seminar
Proton Driver
|
09 Jan 2007 |
2595-v2 |
Proceedings of the miniworkshop on Possible Advanced Accelerator R&D Directions at the ILC Test Accelerator (NML) at Fermilab |
Philippe R.-G. Piot |
Beam Dynamics
Optics
Adv. Accelerator R&D
|
28 Dec 2006 |
2514-v1 |
Dynamical Alignment in presence of ground motion & technical noise |
Valentin Ivanov |
Other
|
10 Oct 2006 |
2326-v1 |
Cavity and Beam Excitation for the Linac--7835 Tube Lifetimes |
Elliott S McCrory |
HLRF
Spares and Maintenance
Operations
|
06 Jul 2006 |
2256-v4 |
The Linac 7835 Online Database |
Elliott S McCrory |
Spares and Maintenance
Controls
Operations
|
07 Jun 2006 |
2212-v2 |
Tank 1 Emittance Probes configuration and angular resolution |
Doug Moehs |
Beam Instrumentation
|
03 Apr 2006 |
2213-v2 |
H Minus Pre-accelerator Emittance Probes_angular resolution |
Doug Moehs |
Pre-Accelerator
Beam Instrumentation
|
03 Apr 2006 |
2193-v1 |
Brief Report from the BNL Trip on Feb 14-15, 2006 |
Henryk Piekarz |
Pre-Accelerator
Proton Driver
|
14 Mar 2006 |
2192-v1 |
Site visit to Brookhaven National Laboratory |
Doug Moehs |
Pre-Accelerator
Proton Driver
|
14 Mar 2006 |
2191-v2 |
RF Ion Source Topics Discussed at DESY |
Doug Moehs |
Pre-Accelerator
Proton Driver
|
14 Mar 2006 |
2171-v4 |
MTBF for the Tevatron, 2004-06 |
Elliott S McCrory |
General
Operations
Status
|
03 Mar 2006 |
2092-v1 |
A Low Energy Beam Transport System for the Superconducting Proton Linac |
Milorad B. Popovic |
Pre-Accelerator
|
10 Jan 2006 |
1929-v1 |
Definition and Approximate Schedule of Phases of Proton Driver Related Activity at the Meson Detector Building |
Bob Webber |
Projects
Other
|
12 Aug 2005 |
1862-v1 |
Effects on the Linac Beam from Random Noise in Quads |
Doug Moehs et al. |
Beam Dynamics
Multiparticle
|
08 Jun 2005 |
1814-v1 |
Status of the Fermilab Drift Tube Linac |
Milorad B. Popovic |
Beam Dynamics
Multiparticle
|
06 May 2005 |
1785-v1 |
Replacing the 35 year old components in the Linac |
Elliott S McCrory |
HLRF
|
21 Apr 2005 |
1587-v1 |
The 7835 Power Tubes in the Fermilab Linac |
Elliott S McCrory |
HLRF
|
18 Feb 2005 |
1554-v1 |
4616 Tube Lifetime Data |
Elliott S McCrory |
HLRF
|
01 Feb 2005 |
1525-v2 |
Linac Filament and 7835 Life issues |
Elliott S McCrory |
HLRF
|
14 Jan 2005 |
1510-v3 |
Linac 7835 Power Tube Lifetime Analysis: An Update |
Elliott S McCrory |
HLRF
|
29 Dec 2004 |
1471-v2 |
The Fermilab Linac Upgrade Project |
Elliott S McCrory |
Upgrades
|
29 Nov 2004 |
1428-v1 |
Run 2 Operational Status and Plans for FY05 |
Dave McGinnis |
Operations
Operations
Operations
Operations
Operations
|
01 Nov 2004 |
1295-v1 |
Combined ESME-ORBIT Space-Charge Simulation for the Booster |
Phil S. Yoon |
Beam Dynamics
Beam Dynamics
Longitudinal Dynamics
Transverse Dynamics
|
06 Aug 2004 |
1138-v1 |
A Simple Beam Line for the MuCool Test Area |
Chuck Ankenbrandt |
Future Accelerators
Adv. Accelerator R&D
Upgrades
|
22 Apr 2004 |
1137-v1 |
A Simple Beam Line for the MuCool Test Area |
Chuck Ankenbrandt |
Upgrades
|
22 Apr 2004 |
1112-v1 |
Fermilab Drift Tube Linac Revisited |
Milorad B. Popovic |
Beam Dynamics
|
08 Apr 2004 |
962-v1 |
Linac Klystron Activity and Status May 1998 to October 2000 |
Bob Webber |
HLRF
HLRF
|
07 Jan 2004 |
921-v1 |
Linac Upgrade Scenarios 2003 |
Elliott S McCrory |
Upgrades
|
21 Nov 2003 |
198-v2 |
A Phase Trombone for the Recycler Ring |
Alper A Garren et al. |
Lattice
|
08 Jul 2003 |
630-v1 |
An 8-GeV Synchrotron-Based Proton Driver |
Weiren Chou |
Future Accelerators
Upgrades
Upgrades
|
28 May 2003 |
516-v1 |
Proton Source Department Meeting, March 12, 2003 |
Elliott S McCrory |
Operations
Operations
|
20 Mar 2003 |
515-v1 |
Proton Economics |
Elliott S McCrory |
Operations
Operations
|
20 Mar 2003 |
514-v1 |
BD Seminar on Linac Performance, Winter 2003 |
Elliott S McCrory |
HLRF
Spares and Maintenance
Operations
|
20 Mar 2003 |
212-v2 |
Short Summary of my Visit to Fermilab |
Charles Steinbach |
Extraction
HLRF
Project
|
10 Sep 1996 |