5184-v8 |
Design Notes Of The Regulated Current Arc Modulator For The FNAL H- Source |
Dan Bollinger et al. |
Pre-Accelerator
|
03 Oct 2016 |
4941-v1 |
RFQ magnet study |
James T. Volk |
Pre-Accelerator
|
03 Sep 2015 |
4667-v1 |
FNAL H- ion source and LEBT |
Dan Bollinger et al. |
Pre-Accelerator
|
10 Sep 2014 |
4537-v2 |
Linac Laser Notcher Project in the Proton Improvement Plan |
Kevin Duel et al. |
Pre-Accelerator
Accelerator Seminar
Linac
Booster
|
01 Apr 2014 |
4534-v1 |
35 Years of H- Ions at Fermilab |
Dan Bollinger |
Pre-Accelerator
Accelerator Seminar
PIP
|
06 Feb 2014 |
4454-v1 |
Source Development |
Dan Bollinger |
Pre-Accelerator
PIP
|
24 Sep 2013 |
4220-v1 |
9/19/2012 PIP meeting Source talk |
Dan Bollinger |
Pre-Accelerator
PIP
|
19 Sep 2012 |
4213-v1 |
RFQ Injector Installation Updates: Point of no return!!!!! (05 Sep 12 Sep 2012) |
Cheng-Yang Tan |
Pre-Accelerator
|
12 Sep 2012 |
4211-v2 |
RFQ Injector Installation Updates (29 Aug 05 Sep 2012) |
Cheng-Yang Tan |
Pre-Accelerator
|
05 Sep 2012 |
4210-v1 |
RFQ PA Systems |
Brian Schupbach |
Pre-Accelerator
Upgrades
PIP
|
30 Aug 2012 |
4206-v2 |
RFQ Injector Installation Updates (22 Aug 29 Aug 2012) |
Cheng-Yang Tan |
Pre-Accelerator
|
29 Aug 2012 |
4196-v2 |
RFQ Injector fixes and Performance/Reliability testing |
Cheng-Yang Tan |
Pre-Accelerator
|
15 Aug 2012 |
4194-v2 |
The RFQ Injector Upgrade |
Cheng-Yang Tan |
Pre-Accelerator
|
10 Aug 2012 |
4191-v4 |
RF Measurement results of buncher cavity for linac pre-injector upgrade |
Ding Sun et al. |
Pre-Accelerator
|
02 Aug 2012 |
4186-v1 |
RFQ tests of new rods |
Cheng-Yang Tan |
Pre-Accelerator
|
27 Jul 2012 |
4174-v1 |
Pre-injector Upgrade Update (09 May 2012 05 Jul 2012) |
Cheng-Yang Tan |
Pre-Accelerator
|
05 Jul 2012 |
4130-v3 |
Results of RFQ "fixes" |
Cheng-Yang Tan |
Pre-Accelerator
|
17 May 2012 |
4120-v2 |
Pre-injector Upgrade Update (11 Apr 2012 25 Apr 2012) |
Cheng-Yang Tan |
Pre-Accelerator
|
26 Apr 2012 |
4110-v1 |
Pre-injector Upgrade Updates (28 Mar 2012 11 Apr 2012) |
Cheng-Yang Tan |
Pre-Accelerator
|
11 Apr 2012 |
4102-v2 |
Pre-injector Upgrade Updates (14 Mar 2012 28 Mar 2012) |
Cheng-Yang Tan |
Pre-Accelerator
|
28 Mar 2012 |
4087-v3 |
Pre-injector Upgrade Updates (29 Feb 2012 14 Mar 2012) |
Cheng-Yang Tan |
Pre-Accelerator
|
14 Mar 2012 |
4077-v1 |
Pre-injector Upgrade Updates (15 Feb 2012 29 Feb 2012) |
Cheng-Yang Tan |
Pre-Accelerator
|
29 Feb 2012 |
4071-v2 |
Pre-injector Upgrade Updates (01 Feb 2012 15 Feb 2012) |
Cheng-Yang Tan |
Pre-Accelerator
|
15 Feb 2012 |
4059-v2 |
Pre-injector Upgrade Updates (18 Jan 2012 01 Feb 2012) |
Cheng-Yang Tan |
Pre-Accelerator
|
01 Feb 2012 |
4045-v3 |
Pre-injector Upgrade Updates (04 Jan 2012 18 Jan 2012) |
Cheng-Yang Tan |
Pre-Accelerator
|
18 Jan 2012 |
4033-v2 |
Pre-injector Upgrade Updates (21 Dec 2011 04 Jan 2012) |
Cheng-Yang Tan |
Pre-Accelerator
|
04 Jan 2012 |
4027-v2 |
Pre-injector Upgrade Updates (07 Dec 2011 21 Dec 2011) |
Cheng-Yang Tan |
Pre-Accelerator
|
21 Dec 2011 |
4014-v1 |
Pre-injector Upgrade Updates (23 Nov 2011 07 Dec 2011) |
Cheng-Yang Tan |
Pre-Accelerator
|
07 Dec 2011 |
4005-v2 |
Pre-injector Upgrade Updates (09 Nov 2011 26 Nov 2011) |
Cheng-Yang Tan |
Pre-Accelerator
|
23 Nov 2011 |
3990-v2 |
Pre-injector Upgrade Updates (26 Oct 2011 09 Nov 2011) |
Cheng-Yang Tan |
Pre-Accelerator
|
09 Nov 2011 |
3978-v1 |
Pre-injector Upgrade Updates (12 Oct 2011 26 Oct 2011) |
Cheng-Yang Tan |
Pre-Accelerator
|
26 Oct 2011 |
3966-v1 |
Pre-injector Upgrade Updates (28 Sep 2011 12 Oct 2011) |
Cheng-Yang Tan |
Pre-Accelerator
|
12 Oct 2011 |
3953-v1 |
Pre-injector Upgrade Updates (14 Sep 2011 28 Sep 2011) |
Cheng-Yang Tan |
Pre-Accelerator
|
28 Sep 2011 |
3943-v3 |
Pre-injector Upgrade Updates (17 Aug 2011 14 Sep 2011) |
Cheng-Yang Tan |
Pre-Accelerator
|
14 Sep 2011 |
3923-v2 |
Pre-injector Upgrade Updates (03 Aug 2011 17 Aug 2011) |
Cheng-Yang Tan |
Pre-Accelerator
|
17 Aug 2011 |
3914-v2 |
Pre-injector Upgrade Updates (20 Jul 2011 03 Aug 2011) |
Cheng-Yang Tan |
Pre-Accelerator
|
03 Aug 2011 |
3907-v2 |
Pre-injector Upgrade Updates (06 Jul 2011 20 Jul 2011) |
Cheng-Yang Tan |
Pre-Accelerator
|
20 Jul 2011 |
3897-v2 |
Pre-injector Upgrade Updates (22 Jun 2011 06 Jul 2011) |
Cheng-Yang Tan |
Pre-Accelerator
|
06 Jul 2011 |
3885-v2 |
Pre-injector Upgrade Updates (01 Jun 2011 22 Jun 2011) |
Cheng-Yang Tan |
Pre-Accelerator
|
22 Jun 2011 |
3877-v5 |
Pre-injector Upgrade Updates (11 May 2011 01 Jun 2011) |
Cheng-Yang Tan |
Pre-Accelerator
|
01 Jun 2011 |
3868-v1 |
Back of the Envelope Calculation of the RF coupling beta for the FNAL H- Injector RFQ |
Cheng-Yang Tan |
Pre-Accelerator
|
13 May 2011 |
3865-v3 |
Pre-injector Upgrade Updates (27 Apr 2011 11 May 2011) |
Cheng-Yang Tan |
Pre-Accelerator
|
11 May 2011 |
3858-v3 |
Pre-injector Upgrade Updates (13 Apr 2011 27 Apr 2011) |
Cheng-Yang Tan |
Pre-Accelerator
|
27 Apr 2011 |
3810-v1 |
RFQ Testing Timeline |
Cheng-Yang Tan |
Pre-Accelerator
|
13 Apr 2011 |
3809-v1 |
Pre-injector Upgrade Updates (30 Mar 2011 13 Apr 2011) |
Cheng-Yang Tan |
Pre-Accelerator
|
13 Apr 2011 |
3804-v1 |
Pre-injector Upgrade Updates (16 Mar 2011 30 Mar 2011) |
Cheng-Yang Tan |
Pre-Accelerator
|
30 Mar 2011 |
3793-v1 |
Pre-injector Upgrade Updates (02 Mar 2011 16 Mar 2011) |
Cheng-Yang Tan |
Pre-Accelerator
|
16 Mar 2011 |
3792-v1 |
Einzel Lens Chopper Transmission Line Mismatches |
Cheng-Yang Tan |
Pre-Accelerator
|
15 Mar 2011 |
3787-v2 |
Pre-injector Upgrade Updates (09 Feb 2011 02 Mar 2011) |
Cheng-Yang Tan |
Pre-Accelerator
|
02 Mar 2011 |
3777-v1 |
Pre-injector Upgrade Updates (19 Jan 2011 09 Feb 2011) |
Cheng-Yang Tan |
Pre-Accelerator
|
09 Feb 2011 |
3769-v1 |
Pre-injector Upgrade Updates (22 Dec 2010 19 Jan 2011) |
Cheng-Yang Tan |
Pre-Accelerator
|
19 Jan 2011 |
3764-v1 |
Pre-injector Upgrade Updates (01 Dec 2010 22 Dec 2010) |
Cheng-Yang Tan |
Pre-Accelerator
|
22 Dec 2010 |
3747-v1 |
PreAcc/Linac Downtime Statistics |
Fernanda G Garcia |
Pre-Accelerator
Linac
Operations
|
08 Dec 2010 |
3738-v1 |
Machine Operating Description - PreAcc |
Dan Bollinger |
Pre-Accelerator
Operations
|
08 Dec 2010 |
3726-v2 |
Linac Frontend Upgrade Report |
Cheng-Yang Tan |
Pre-Accelerator
|
07 Dec 2010 |
3722-v2 |
Pre-injector Upgrade Updates (10 Nov 01 Dec 2010) |
Cheng-Yang Tan |
Pre-Accelerator
|
02 Dec 2010 |
3711-v1 |
Pre-injector Upgrade Updates (27 Oct 10 Nov 2010) |
Cheng-Yang Tan |
Pre-Accelerator
|
10 Nov 2010 |
3701-v1 |
Pre-injector Upgrade Updates (13 Oct 27 Oct 2010) |
Cheng-Yang Tan |
Pre-Accelerator
|
27 Oct 2010 |
3695-v1 |
Pre-injector Upgrade Updates (29 Sep 13 Oct 2010) |
Cheng-Yang Tan |
Pre-Accelerator
|
13 Oct 2010 |
3684-v1 |
Pre-injector Upgrade Updates (15 Sep 29 Sep 2010) |
Cheng-Yang Tan |
Pre-Accelerator
|
29 Sep 2010 |
3672-v1 |
Pre-injector Upgrade Updates (01 Sep 15 Sep 2010) |
Cheng-Yang Tan |
Pre-Accelerator
|
15 Sep 2010 |
3663-v1 |
Pre-injector Upgrade Updates (18 Aug 01 Sep 2010) |
Cheng-Yang Tan |
Pre-Accelerator
|
01 Sep 2010 |
3658-v1 |
Pre-injector Upgrade Updates (13 Jul 18 Aug 2010) |
Cheng-Yang Tan |
Pre-Accelerator
|
18 Aug 2010 |
3633-v1 |
Pre-injector Upgrade Updates (09 Jun 30 Jun 2010) |
Cheng-Yang Tan |
Pre-Accelerator
|
30 Jun 2010 |
3625-v1 |
Pre-injector Upgrade Updates (26 May 09 Jun 2010) |
Cheng-Yang Tan |
Pre-Accelerator
|
09 Jun 2010 |
3616-v2 |
Pre-injector Upgrade Updates (12 May - 26 May 2010) |
Cheng-Yang Tan |
Pre-Accelerator
|
26 May 2010 |
3608-v1 |
Pre-injector Upgrade Updates (29 Apr 12 May 2010) |
Cheng-Yang Tan |
Pre-Accelerator
|
12 May 2010 |
3601-v1 |
Pre-injector Upgrade Updates (14 Apr 28 Apr 2010) |
Cheng-Yang Tan |
Pre-Accelerator
|
28 Apr 2010 |
3595-v2 |
Pre-injector Upgrade Updates (31 Mar 14 Apr 2010) |
Cheng-Yang Tan |
Pre-Accelerator
|
14 Apr 2010 |
3581-v1 |
Pre-injector Upgrade Updates (31 Mar 2010) |
Cheng-Yang Tan |
Pre-Accelerator
|
31 Mar 2010 |
3575-v1 |
Pre-Injector Overview & Goals |
Cheng-Yang Tan |
Pre-Accelerator
|
17 Mar 2010 |
3549-v1 |
Linac Briefing to the Directorate - August 2002 |
Bob Webber |
Pre-Accelerator
Linac
Upgrades
Operations
Spares and Maintenance
|
11 Feb 2010 |
3269-v1 |
A 750 keV RFQ for the Fermilab Linac |
Milorad B. Popovic |
Pre-Accelerator
Linac
Upgrades
|
17 Dec 2008 |
3265-v1 |
Visit to BNL 17-19 Nov 2008 |
Dan Bollinger et al. |
Pre-Accelerator
|
08 Dec 2008 |
3056-v1 |
H- Ion Source Spec for HINS and Considerations for Project X H- Ion Source |
Charles W. Schmidt et al. |
Pre-Accelerator
Project X
Linac
Proton Driver
Other
|
19 Mar 2008 |
2634-v0 |
Effect of Possible Furlough on the Fermilab Neutron Therapy Facility |
Eric J Prebys |
Pre-Accelerator
NTF
Operations
|
06 Feb 2007 |
2605-v1 |
survey of H- ion sources for accelerators |
Jens Peters |
Pre-Accelerator
Accelerator Seminar
Proton Driver
|
09 Jan 2007 |
2213-v2 |
H Minus Pre-accelerator Emittance Probes_angular resolution |
Doug Moehs |
Pre-Accelerator
Beam Instrumentation
|
03 Apr 2006 |
2193-v1 |
Brief Report from the BNL Trip on Feb 14-15, 2006 |
Henryk Piekarz |
Pre-Accelerator
Proton Driver
|
14 Mar 2006 |
2192-v1 |
Site visit to Brookhaven National Laboratory |
Doug Moehs |
Pre-Accelerator
Proton Driver
|
14 Mar 2006 |
2191-v2 |
RF Ion Source Topics Discussed at DESY |
Doug Moehs |
Pre-Accelerator
Proton Driver
|
14 Mar 2006 |
2092-v1 |
A Low Energy Beam Transport System for the Superconducting Proton Linac |
Milorad B. Popovic |
Pre-Accelerator
|
10 Jan 2006 |