8705-v2 |
Booster Physics/Operations Group Telework Report-20200806 |
Chandrashekhara M. Bhat et al. |
Beam Dynamics
Other
Collimation
Studies
Beam Instrumentation
Booster
Extraction Lattice
|
01 Oct 2020 |
8536-v2 |
Longitudinal Dynamics at Injection in Booster |
Chandrashekhara M. Bhat |
Beam Dynamics
LLRF
Beam Instrumentation
Booster
|
10 Jul 2020 |
8545-v1 |
Booster Physics/Operations Group Telework Report-20200702 |
Chandrashekhara M. Bhat et al. |
Beam Dynamics
Other
Operations
Collimation
Studies
Beam Instrumentation
Booster
Extraction Lattice
Upgrades
|
06 Jul 2020 |
6811-v6 |
AD/Instrumentation Status Meeting Minutes and Slides |
Craig C Drennan |
PXIE
Beam Instrumentation
Beam Instrumentation
FAST
Beamline
Beam Instrumentation
Beam Instrumentation
Monitoring Instrumentation
IOTA
Instrumentation
|
04 May 2020 |
740-v1 |
Instrumentation Breakout for DOE Run II Review July 2003 |
Keith E Gollwitzer et al. |
Beam Instrumentation
Beam Instrumentation
ACNET
Beam Instrumentation
Instrumentation
Beam Instrumentation
Talks
Electron Cooling
BPM
|
23 Apr 2020 |
7763-v2 |
Proton Source 8-hr Studies (January-June, 2019) |
Chandrashekhara M. Bhat et al. |
Beam Dynamics
Power Supplies
LLRF
Operations
Studies
Beam Instrumentation
HLRF
Upgrades
|
22 Oct 2019 |
2523-v1 |
Booster Beam Loss Monitor Upgrade Specification |
Craig C Drennan |
Front-end Systems
Beam Instrumentation
|
16 Oct 2019 |
7592-v1 |
Booster Fast Loss Monitoring |
Rick Tesarek |
Collimation
Beam Instrumentation
Booster
|
29 Aug 2019 |
5864-v1 |
Booster BPM Upgrade 2014 to 2017 |
Craig C Drennan |
Beam Instrumentation
|
24 Oct 2017 |
3696-v2 |
Installation, Timing and Gating Details for BPMs In the Booster and 400 MeV Line |
Craig C Drennan |
Beam Instrumentation
|
22 Apr 2014 |
4381-v2 |
Status of the New MI and RR Beam Profiling Measurement Devices |
Randy M Thurman-Keup et al. |
Beam Instrumentation
Beam Instrumentation
Accelerator Seminar
Beam Instrumentation
|
11 Jun 2013 |
3723-v13 |
Booster Beam Loss Monitor Integrator and Data Acquisition Upgrade |
Craig C Drennan |
Front-end Services
Operations
Beam Instrumentation
|
17 Apr 2013 |
4308-v1 |
Linac BPM Status Update |
Elliott S McCrory |
Beam Instrumentation
Beam Instrumentation
Console Applications
BPM
PIP
|
06 Mar 2013 |
4283-v1 |
Linac BPM Commissioning Notes |
Elliott S McCrory |
Beam Instrumentation
Front-end Systems
Beam Instrumentation
BPM
|
31 Jan 2013 |
4276-v1 |
Applications for Linac BPMs |
Elliott S McCrory |
Beam Instrumentation
Java Appl Framework
Beam Instrumentation
BPM
|
29 Jan 2013 |
3889-v3 |
Linac Beam Velocity Measurement |
Craig C Drennan |
Operations
Beam Instrumentation
Operations
Front-end Systems
Controls
Beam Instrumentation
|
24 Jul 2012 |
4028-v2 |
Booster Digital Damper Status & Plans |
Nathan Eddy |
Beam Instrumentation
PIP
|
21 Dec 2011 |
4023-v1 |
Booster BPM, Daughter Trigger Generator Adjustments |
Craig C Drennan |
Beam Instrumentation
|
14 Dec 2011 |
3950-v4 |
Booster BLM Upgrade -- Presentation Slides |
Craig C Drennan |
ACNET
Front-end Systems
Beam Instrumentation
|
07 Nov 2011 |
3899-v1 |
Booster Laser Profile Monitor |
David E. Johnson |
Beam Instrumentation
|
07 Jul 2011 |
3890-v1 |
Booster BLM and BPM upgrade Meeting Minutes, Fall 2010 |
Craig C Drennan |
Front-end Systems
Beam Instrumentation
|
29 Jun 2011 |
3795-v1 |
Booster BLM Tests on BLMS06 |
Craig C Drennan |
Beam Instrumentation
|
17 Mar 2011 |
3780-v1 |
Interfacing to the Booster BLM Upgrade Integrator/Digitizer VME Module |
Craig C Drennan |
Beam Instrumentation
|
17 Feb 2011 |
3730-v3 |
Linac and Booster Beam Diagnostics |
Craig C Drennan |
Beam Instrumentation
Beam Instrumentation
|
07 Dec 2010 |
3642-v1 |
Booster Wire Scanner Integrator |
Craig C Drennan |
Beam Instrumentation
|
20 Jul 2010 |
1410-v10 |
BLM Upgrade Users' Guide |
Alan Baumbaugh et al. |
Beam Instrumentation
Beam Loss Monitors (BLM)
Instrumentation
Beam Instrumentation
TeV ABORT
|
21 Jun 2010 |
3576-v2 |
Radiation Shielding Tests for Laser Power Supply |
David E. Johnson |
Project X
Beam Instrumentation
|
18 Mar 2010 |
3486-v6 |
Installation Planning for BPM-HRM Booster DAQ Extension |
Craig C Drennan |
Beam Instrumentation
|
14 Dec 2009 |
3013-v2 |
Booster BPM Documentation |
Sharon L. Lackey |
Hardware
Front-end Documentation
Front-end Systems
Controls
Beam Instrumentation
BPM
|
26 Oct 2009 |
3214-v2 |
Booster Bunch Length Monitor |
Craig C Drennan |
Beam Instrumentation
|
26 Oct 2009 |
3376-v1 |
Booster BPM Info and Measurement Summary |
James A. Fitzgerald |
Beam Instrumentation
|
27 Apr 2009 |
3205-v4 |
Pulse Stretcher Application For Measuring BDot Coils on Booster MP02 Current |
Craig C Drennan |
Beam Instrumentation
Booster
|
29 Sep 2008 |
2612-v1 |
EO introduction and plan in A0 |
Jinhao Ruan |
Beam Instrumentation
Instrumentation
|
08 Feb 2007 |
2584-v1 |
The Measurements and Analysis of Electromagnetic Interference arising from the Booster GMPS |
Weiren Chou et al. |
Power Supplies
Beam Instrumentation
|
11 Dec 2006 |
2221-v1 |
Proposed Booster bpm geometry |
James L. Crisp |
Beam Instrumentation
Upgrades
BPM
|
03 Apr 2006 |
2085-v1 |
Calibration of the Booster BPM System |
Bob Webber |
Beam Instrumentation
BPM
BPM
|
28 Dec 2005 |
2000-v1 |
BLM System Control Bus Testing |
Kelly L Knickerbocker |
Beam Instrumentation
Beam Loss Monitors (BLM)
Instrumentation
Beam Instrumentation
|
31 Oct 2005 |
1994-v1 |
BLM VME J2 Backplane Impedance |
Kelly L Knickerbocker |
Beam Instrumentation
Beam Loss Monitors (BLM)
Instrumentation
Beam Instrumentation
|
31 Oct 2005 |
1736-v1 |
BLM VME J2 Backplane Crosstalk Evaluation |
Kelly L Knickerbocker |
Beam Instrumentation
Beam Loss Monitors (BLM)
Instrumentation
Beam Instrumentation
|
16 Mar 2005 |
1569-v1 |
Tevatron BLM VME J2 Backplane Specification Document |
Kelly L Knickerbocker |
Beam Instrumentation
Beam Loss Monitors (BLM)
Instrumentation
Beam Instrumentation
TeV ABORT
|
10 Feb 2005 |
930-v1 |
The Booster Monitor Program at Fermilab: Data Retrieval and Analysis |
Chandra CLJ Jacobs |
Java Data Acquisition
Controls
Beam Instrumentation
|
04 Dec 2003 |
767-v1 |
LabVIEW VI Upgrades on the IPM Systems at Fermilab |
Thomas Spears |
Beam Instrumentation
Beam Instrumentation
Ion Profile Monitor
Beam Instrumentation
|
08 Aug 2003 |