8536-v2 |
Longitudinal Dynamics at Injection in Booster |
Chandrashekhara M. Bhat |
Beam Dynamics
LLRF
Beam Instrumentation
Booster
|
10 Jul 2020 |
8362-v2 |
Aspects of Longitudinal Beam Dynamics in the Booster: Beam Loss Mechanism and Mitigation |
Chandrashekhara M. Bhat |
Beam Dynamics
LLRF
Operations
HLRF
Upgrades
|
07 May 2020 |
4790-v1 |
Early Beam Injection in the Fermilab Booster & its Implementation Plan |
Chandrashekhara M. Bhat |
Beam Dynamics
LLRF
Operations
Studies
HLRF
Upgrades
|
04 May 2020 |
909-v1 |
Booster LLRF VCO DSP Program Info |
Bob Webber |
LLRF
LLRF
|
24 Apr 2020 |
7763-v2 |
Proton Source 8-hr Studies (January-June, 2019) |
Chandrashekhara M. Bhat et al. |
Beam Dynamics
Power Supplies
LLRF
Operations
Studies
Beam Instrumentation
HLRF
Upgrades
|
22 Oct 2019 |
7103-v1 |
Booster LLRF Transfer Function Modeling |
Edward W. Cullerton |
LLRF
Booster
|
20 Mar 2019 |
7046-v1 |
Longitudinal Beam Dynamics Issues at the Fermilab Booster |
Chandrashekhara M. Bhat |
Beam Dynamics
LLRF
Operations
Studies
Booster
HLRF
Beam Physics
|
07 Mar 2019 |
6967-v4 |
Booster DC studies: Adiabatic Beam Capture |
Chandrashekhara M. Bhat et al. |
Beam Dynamics
LLRF
Studies
Booster
HLRF
|
08 Feb 2019 |
4884-v2 |
Data Transfer Protocol for the USB to FIFO Interface |
Craig C Drennan et al. |
LLRF
|
30 Nov 2017 |
5804-v2 |
LLRF Controls Settings |
Craig C Drennan |
LLRF
|
30 Nov 2017 |
3891-v15 |
VME-DDS Frequency and Phase Control Module |
Craig C Drennan |
LLRF
|
30 Nov 2017 |
5307-v4 |
New Booster LLRF DDS -- ACNET Parameters and Curve Application Notes |
Craig C Drennan et al. |
LLRF
|
13 Nov 2017 |
5344-v6 |
Booster Vrf by fsy Measurements at Injection Energy (400 MeV on a DC-Mode) |
Chandrashekhara M. Bhat |
LLRF
Beam Physics
HLRF
|
22 Mar 2017 |
5334-v1 |
Collection of Booster Synchronization Documents |
Craig C Drennan |
LLRF
|
03 Mar 2017 |
5273-v1 |
Booster Acceleration Phase Lock Controller |
Craig C Drennan |
LLRF
Operations
|
15 Nov 2016 |
4411-v7 |
Booster LLRF System Block Diagram |
Craig C Drennan |
LLRF
|
14 Nov 2016 |
4964-v2 |
Cogging Test Switch |
Craig C Drennan |
LLRF
|
23 Jun 2016 |
5166-v1 |
VME DDS Frequency Curves |
Craig C Drennan |
LLRF
|
25 May 2016 |
5150-v1 |
Phase Changes to A RF and B RF at Transition |
Craig C Drennan |
LLRF
|
04 May 2016 |
4459-v2 |
Booster Paraphase Curve Generator VXI Module |
Craig C Drennan |
LLRF
|
17 Feb 2016 |
4781-v2 |
Booster to Main Injector Phase-Lock Controller |
Craig C Drennan |
LLRF
|
16 Nov 2015 |
4936-v1 |
Early Injection studies -- Frequency Trigger OR'ing Module |
Craig C Drennan |
LLRF
|
28 Aug 2015 |
4935-v1 |
Acceleration Gate Module |
Craig C Drennan |
LLRF
|
28 Aug 2015 |
4827-v5 |
XFR Modification to Resetting Beam Sync (AA) and Offset Beam Sync (OAA) |
Craig C Drennan |
RF
LLRF
LLRF
Operations
LLRF
RF
|
05 Jun 2015 |
4414-v5 |
Booster Longitudinal Damper System Block Diagram -- Draft for Review |
Craig C Drennan |
Beam Dynamics
LLRF
|
03 Mar 2014 |
4492-v1 |
PIP General Info |
Ken Domann et al. |
Beam Dynamics
LLRF
PIP
|
04 Dec 2013 |
4413-v1 |
Booster LLRF VXI DSP Module 2013 |
Craig C Drennan |
LLRF
|
15 Jul 2013 |
4153-v5 |
Booster Main Injector Phase Lock Divide-By-32 Phase Error Trajectory Method |
Craig C Drennan |
LLRF
|
18 Jun 2013 |
4198-v1 |
Booster Cogging Teststand Progress -- PIP Presentation |
Craig C Drennan et al. |
LLRF
Upgrades
PIP
|
20 Aug 2012 |
3367-v1 |
Characterization of the Fast Phase Detector in the Booster LLRF System |
Craig C Drennan |
LLRF
Operations
Controls
|
24 Jul 2012 |
3922-v2 |
Booster Dual Phase Detector Module for MI Phase Lock Control |
Craig C Drennan |
LLRF
|
17 Jul 2012 |
4131-v1 |
MI and Recycler Injection in the NOvA Era |
Ioanis Kourbanis |
LLRF
LLRF
LLRF
|
17 May 2012 |
4103-v1 |
PIP Presentation on Booster Main Injector Phase Lock |
Craig C Drennan |
LLRF
PIP
|
28 Mar 2012 |
3921-v1 |
Initial Simulations of Performance Limitations of the Booster RF Cavity |
Mohamed H Hassan |
Electromagnetic Calculations
LLRF
Booster
HLRF
PIP
|
10 Aug 2011 |
3644-v1 |
Microsoft Project for Booster LLRF Upgrade Schedule and Effort |
Craig C Drennan |
LLRF
|
21 Jul 2010 |
3643-v1 |
Examination of BGA and LGA Connections on the Booster LLRF DDS Module Prototype |
Craig C Drennan |
LLRF
|
21 Jul 2010 |
3604-v1 |
Configuring the Booster LLRF System for Testing New Frequency and Phase Control Components |
Craig C Drennan |
LLRF
|
04 May 2010 |
3425-v1 |
Booster LLRF Electronics Upgrade -- Electronic Design Efforts, April 2009 |
Craig C Drennan |
LLRF
|
21 Jul 2009 |
2974-v2 |
Mathematical Description of the Booster LLRF Controls |
Craig C Drennan |
LLRF
Controls
|
15 Apr 2009 |
2828-v4 |
Requirements for the Booster LLRF DDS Module |
Craig C Drennan et al. |
Hardware
LLRF
|
15 Apr 2009 |
2045-v1 |
Booster Cogging |
Robert M Zwaska |
LLRF
Extraction Lattice
|
08 Dec 2005 |
1847-v2 |
Booster Cogging at PAC 05 |
Sacha E. Kopp et al. |
LLRF
|
27 May 2005 |
1277-v1 |
Booster Cogging: Synchronization with the Main Injector for NuMI & Slip-Stacking |
Robert M Zwaska |
LLRF
LLRF
Commissioning
Commissioning
|
29 Jul 2004 |
1241-v1 |
Synchronization of the Fermilab Booster and Main Injector for Multiple |
Sacha E. Kopp et al. |
LLRF
LLRF
Projects
|
01 Jul 2004 |
859-v1 |
Booster cogging for multiple batch operation of the Main Injector |
William A Pellico et al. |
LLRF
Commissioning
Project
Studies
Primary Proton Beam
Projects
|
02 Oct 2003 |