7091-v2 |
Booster RF Cavities for PIP-I+ and PIP-II (Functional Requirements Specification) |
Chandrashekhara M. Bhat |
Booster
PIP-Iplus
Projects
|
18 Mar 2019 |
7088-v2 |
Booster Wide Aperture D-Magnets for PIP-I+ and PIP-II (Functional Requirements Specification) |
Chandrashekhara M. Bhat |
Booster
PIP-Iplus
Projects
|
18 Mar 2019 |
5097-v2 |
Laser Notcher Status |
David E. Johnson |
Projects
Projects
PIP
|
02 Mar 2016 |
4546-v2 |
Beam Energy Spread in the Booster at Injection |
Chandrashekhara M. Bhat et al. |
Beam Dynamics
Upgrades
Operations
Projects
|
19 Feb 2014 |
4246-v1 |
Project Status Update |
Ken Domann et al. |
Projects
Projects
PIP
|
09 Nov 2012 |
4166-v1 |
Laser Notcher Status |
David E. Johnson |
Projects
PIP
|
27 Jun 2012 |
3930-v1 |
2012 Booster LCW Improvement Plan Overview |
David Hixson |
Booster
Upgrades
Operations
Projects
PIP
|
29 Aug 2011 |
3766-v1 |
A Statistical Study of Proton Source Down Time |
Dave McGinnis |
Spares and Maintenance
Booster
Spares and Maintenance
Projects
Operations
Operations
Projects
Linac
|
29 Dec 2010 |
2883-v1 |
Booster RF Repetition Rate Limit |
Robert J. Ducar et al. |
Proton Plan
HLRF
Upgrades
Projects
|
26 Sep 2007 |
2339-v1 |
Prospective Gains from Gamma-t Jump and 2nd Harmonic Magnet Ramp in Fermilab Booster |
James A. MacLachlan |
Beam Dynamics
Proton Plan
Upgrades
Projects
Studies
|
11 Jul 2006 |
1783-v3 |
Proton Source Scaling Laws |
Dave McGinnis |
Proton Plan
Projects
SNuMi
|
13 May 2006 |
1441-v1 |
The Proton Plan |
Bruce Baller et al. |
RF
Upgrades
Project
Projects
|
11 Nov 2004 |
1430-v2 |
Booster Corrector System Specification |
David J. Harding et al. |
Controls
Upgrades
Projects
|
05 Nov 2004 |
1241-v1 |
Synchronization of the Fermilab Booster and Main Injector for Multiple |
Sacha E. Kopp et al. |
LLRF
LLRF
Projects
|
01 Jul 2004 |
859-v1 |
Booster cogging for multiple batch operation of the Main Injector |
William A Pellico et al. |
Primary Proton Beam
LLRF
Commissioning
Project
Projects
Studies
|
02 Oct 2003 |