8341-v1 |
Local Beta Bump using Quads, with Applications for Booster |
Jeffrey Eldred |
Booster
Upgrades
Beam Dynamics
Extraction Lattice
Optics
|
23 Jul 2020 |
8266-v6 |
E4R test Facility |
David E. Johnson |
Upgrades
|
10 Jul 2020 |
8545-v1 |
Booster Physics/Operations Group Telework Report-20200702 |
Chandrashekhara M. Bhat et al. |
Collimation
Booster
Upgrades
Beam Dynamics
Other
Operations
Studies
Beam Instrumentation
Extraction Lattice
|
06 Jul 2020 |
8362-v2 |
Aspects of Longitudinal Beam Dynamics in the Booster: Beam Loss Mechanism and Mitigation |
Chandrashekhara M. Bhat |
HLRF
Upgrades
Beam Dynamics
LLRF
Operations
|
07 May 2020 |
4790-v1 |
Early Beam Injection in the Fermilab Booster & its Implementation Plan |
Chandrashekhara M. Bhat |
HLRF
Upgrades
Beam Dynamics
LLRF
Operations
Studies
|
04 May 2020 |
7763-v2 |
Proton Source 8-hr Studies (January-June, 2019) |
Chandrashekhara M. Bhat et al. |
HLRF
Upgrades
Beam Dynamics
Power Supplies
LLRF
Operations
Studies
Beam Instrumentation
|
22 Oct 2019 |
7376-v6 |
Recent Performance and Future Plans for the Fermilab Accelerator Complex |
Chandrashekhara M. Bhat |
Upgrades
|
23 Jun 2019 |
7085-v2 |
Booster Intensity AIP for PIP-I+ (Functional Requirements Specification) |
Chandrashekhara M. Bhat |
Booster
Upgrades
PIP-Iplus
|
18 Mar 2019 |
6691-v1 |
65 MHz RF Cavity - Booster Damper Cavity |
Chandrashekhara M. Bhat et al. |
Booster
HLRF
Upgrades
|
06 Sep 2018 |
5942-v2 |
Booster D magnet for PIP 2 girder requirements |
William A Pellico |
Upgrades
Magnets
|
19 Feb 2018 |
5350-v5 |
Y567b Power Amplifier Tests at 76 and 106 MHz |
Robyn L Madrak et al. |
HLRF
Upgrades
PIP
|
09 Feb 2018 |
4568-v4 |
Longitudinal Beam Dynamics of the Booster Beam from Injection to Extraction Beam Studies and Simulations |
Chandrashekhara M. Bhat |
Booster
Upgrades
Beam Physics
Beam Dynamics
Operations
|
15 Nov 2017 |
4610-v18 |
PIP RF Cavity and Tuners Refurbishement Progress & Projections |
Keith E Gollwitzer |
Upgrades
PIP
|
11 Jan 2016 |
5014-v1 |
Beam Injection and Capture |
Chandrashekhara M. Bhat |
Booster
Upgrades
Beam Dynamics
|
25 Nov 2015 |
4928-v1 |
Early Beam Injection Scheme for the Fermilab Booster: A Path for Intensity Upgrade |
Chandrashekhara M. Bhat |
Upgrades
|
18 Aug 2015 |
4683-v3 |
Booster Injection in PIP-II Era An Update |
David E. Johnson |
Upgrades
|
14 Oct 2014 |
4550-v2 |
Booster RF System Upgrades for 15 Hz Operation |
John S Reid et al. |
Accelerator Seminar
Upgrades
|
04 Mar 2014 |
4546-v2 |
Beam Energy Spread in the Booster at Injection |
Chandrashekhara M. Bhat et al. |
Upgrades
Projects
Beam Dynamics
Operations
|
19 Feb 2014 |
4497-v1 |
PIP-II: A Plan for Developing Multi-MW Capabilities at Fermilab & Overview of Physics Opportunities with High-intensity Proton Beams |
Stephen D. Holmes et al. |
Accelerator Seminar
Upgrades
Main Injector
Future Accelerators
|
12 Dec 2013 |
4481-v2 |
Parameter table for Fermilab Megawatt Power Upgrade |
Sergei Nagaitsev |
Upgrades
Upgrades
|
18 Nov 2013 |
4363-v2 |
Plans for Booster & Linac Transformer Installation |
Ryan Crawford |
Linac
Booster
Upgrades
Upgrades
PIP
|
08 May 2013 |
2757-v3 |
Updating Calibration Values in the Booster BPM System |
Craig C Drennan |
Upgrades
BPM
|
02 Apr 2013 |
4312-v1 |
Booster Ferrite Bias Supply Upgrade |
Patrick G. Sheahan |
Booster
HLRF
Upgrades
PIP
|
13 Mar 2013 |
4301-v1 |
Booster Beam Notching Installation Update |
Salah Chaurize |
Booster
Upgrades
PIP
Beam Dynamics
|
25 Feb 2013 |
4282-v1 |
Design of Booster Transverse Damper |
Timofey Zolkin |
Booster
Upgrades
PIP
Beam Dynamics
|
30 Jan 2013 |
4268-v1 |
Final Update - 2012 Booster LCW Improvement Plan |
David Hixson |
Upgrades
PIP
|
09 Jan 2013 |
4266-v1 |
Refurbished Booster RF |
John S Reid |
Booster
HLRF
Upgrades
PIP
|
21 Dec 2012 |
4243-v2 |
Compensating for injection slewing with Booster corrector magnets in the Project X era |
Eric J Prebys |
Upgrades
|
25 Oct 2012 |
4229-v2 |
Progress Update - 2012 Booster LCW Improvement Plan |
David Hixson |
Upgrades
PIP
Operations
|
26 Sep 2012 |
4228-v1 |
Linac MCC/Transformer, Hatch, Booster Transformers, Anode Supply |
Ryan Crawford |
Linac
Booster
Upgrades
Upgrades
PIP
|
25 Sep 2012 |
4209-v1 |
BoosterL12/Noker-L13/Absorber Update |
Salah Chaurize |
Booster
Upgrades
PIP
|
30 Aug 2012 |
4199-v1 |
Booster Turbo Manifold Design Analysis |
David Augustine |
Booster
Upgrades
PIP
Vacuum
|
21 Aug 2012 |
4198-v1 |
Booster Cogging Teststand Progress -- PIP Presentation |
Craig C Drennan et al. |
Upgrades
PIP
LLRF
|
20 Aug 2012 |
4195-v1 |
Linac Substation L1 & Booster Substation Y-BE2 --- Update #3 |
Ryan Crawford |
Linac
Booster
Upgrades
Upgrades
PIP
|
15 Aug 2012 |
4182-v1 |
PIP - General Info |
William A Pellico et al. |
Upgrades
PIP
|
19 Jul 2012 |
4164-v1 |
PIP - General Info |
Salah Chaurize et al. |
Booster
Upgrades
PIP
|
20 Jun 2012 |
4106-v1 |
L13 Notched Beam Absorber Update |
Salah Chaurize |
Booster
Upgrades
PIP
Operations
|
05 Apr 2012 |
4099-v2 |
GMPS Transductor Upgrades |
Xiaolong Zhang et al. |
Upgrades
Data Acquisition
|
04 Apr 2012 |
4068-v1 |
Booster SS Driver Upgrade Update |
Tom N Kubicki |
Booster
Upgrades
PIP
|
09 Feb 2012 |
3997-v1 |
Booster Cogging Upgrades |
Kiyomi Seiya |
Upgrades
|
16 Nov 2011 |
3967-v1 |
PIP and the Booster Notch |
Robert M Zwaska |
Upgrades
|
12 Oct 2011 |
3947-v1 |
Booster Laser Notcher Options |
David E. Johnson |
Upgrades
PIP
|
20 Sep 2011 |
3930-v1 |
2012 Booster LCW Improvement Plan Overview |
David Hixson |
Booster
Upgrades
Projects
PIP
Operations
|
29 Aug 2011 |
3734-v2 |
BOOSTER COLLIMATION AND SHIELDING |
Nikolai Mokhov |
Upgrades
Energy Deposition
|
07 Dec 2010 |
3689-v1 |
Task Force Report - Directorate Meeting |
William A Pellico |
Upgrades
Upgrades
|
05 Oct 2010 |
3230-v1 |
Examination of the Booster Short Straight Corrector Prototype Installation |
Craig C Drennan |
Upgrades
|
20 Oct 2008 |
622-v1 |
FERMILAB BOOSTER BEAM COLLIMATION AND SHIELDING |
Alexandr Drozhdin et al. |
Upgrades
Energy Deposition
|
02 Jun 2008 |
2883-v1 |
Booster RF Repetition Rate Limit |
Robert J. Ducar et al. |
Proton Plan
HLRF
Upgrades
Projects
|
26 Sep 2007 |
2859-v11 |
Booster Corrector Installation Data -- Shutdown 2007 |
Craig C Drennan |
Upgrades
Power Supplies
Controls
|
19 Sep 2007 |
2792-v7 |
Minutes of the Booster Corrector Prototype Test Planning Meeting |
Craig C Drennan |
Upgrades
|
05 Jul 2007 |
2804-v1 |
Proton Plan Booster Corrector Upgrade -- Directors Review Aug. 2006 |
Craig C Drennan |
Upgrades
|
11 Jun 2007 |
2632-v3 |
Coordinate System for New Booster Corrector Magnet System |
Craig C Drennan et al. |
Upgrades
Beam Dynamics
Operations
Controls
|
30 May 2007 |
2791-v1 |
System Overview for the Multi-element Corrector Magnets and Controls for the Fermilab Booster. |
Craig C Drennan |
Upgrades
|
29 May 2007 |
2734-v2 |
Booster Long Straight Corrector Package Installation |
Craig C Drennan |
Upgrades
|
24 Apr 2007 |
2718-v1 |
March 27, 2007 Booster Corrector Status for DOE Review |
Craig C Drennan |
Upgrades
|
27 Mar 2007 |
2714-v1 |
Link to AC Measurement Slew Rate and Field Strength Data and Results |
Phil Schlabach |
Upgrades
|
22 Mar 2007 |
2713-v1 |
Web Link to Tech Division for Booster Corrector Thermal Studies |
David J. Harding |
Upgrades
|
22 Mar 2007 |
2712-v1 |
BMA000 Magnetic Measurements -- Excerpts from Oct. 2006 Tech. Review |
Phil Schlabach |
Upgrades
|
22 Mar 2007 |
2711-v1 |
Booster Corrector Prototype BMA000 -- Field Strength Test Results |
Phil Schlabach |
Upgrades
|
22 Mar 2007 |
2686-v1 |
Proposal of RF manipulation in Booster |
William A Pellico et al. |
Longitudinal Dynamics
Booster
Upgrades
Beam Physics
|
12 Mar 2007 |
2548-v1 |
Report from Booster Corrector Review |
Thomas H Nicol et al. |
Proton Plan
Upgrades
|
08 Nov 2006 |
2339-v1 |
Prospective Gains from Gamma-t Jump and 2nd Harmonic Magnet Ramp in Fermilab Booster |
James A. MacLachlan |
Proton Plan
Upgrades
Projects
Beam Dynamics
Studies
|
11 Jul 2006 |
2240-v1 |
Rep. Rate and Beam Quality Issues for the Booster in the SNuMI Era |
Eric J Prebys |
Upgrades
SNuMi
|
17 Apr 2006 |
2178-v2 |
First Report of the Proton Study Group |
Sergei Nagaitsev et al. |
Other
Operations
Upgrades
General
SY120
|
03 Apr 2006 |
2221-v1 |
Proposed Booster bpm geometry |
James L. Crisp |
Upgrades
Beam Instrumentation
BPM
|
03 Apr 2006 |
2112-v2 |
Optimum Booster ORBUMP Magnet Configuration |
Eric J Prebys |
Upgrades
|
01 Feb 2006 |
1992-v1 |
Proton Intensity Improvements for MINOS |
Dave McGinnis |
Upgrades
Accumulator
Stochastic Cooling
Alignment
|
14 Oct 2005 |
1900-v1 |
Report to the Fermilab Director by the Proton Committee |
Chuck Ankenbrandt et al. |
MiniBooNE
Upgrades
General
Operations
|
18 Jul 2005 |
1817-v1 |
Status of the Proton Plan |
Eric J Prebys |
Upgrades
Operations
|
11 May 2005 |
1441-v1 |
The Proton Plan |
Bruce Baller et al. |
RF
Project
Upgrades
Projects
|
11 Nov 2004 |
1430-v2 |
Booster Corrector System Specification |
David J. Harding et al. |
Upgrades
Projects
Controls
|
05 Nov 2004 |
918-v1 |
Talks given at NBI2003 in KEK by Bob Zwaska |
Robert M Zwaska |
Dampers
Commissioning
Monitoring Instrumentation
Upgrades
Extraction from Main Injector
Primary Proton Beam
Commissioning
|
18 Nov 2003 |
634-v1 |
A New Kind of Beam Pipe for Rapid Cycling Proton Synchrotrons |
Alex Chen et al. |
Upgrades
Vacuum
Future Accelerators
Vacuum
|
28 May 2003 |
632-v1 |
Fermilab Booster Modeling and Space Charge Study |
Weiren Chou et al. |
Ion Profile Monitor
Upgrades
Beam Dynamics
Studies
Multiparticle
|
28 May 2003 |
630-v1 |
An 8-GeV Synchrotron-Based Proton Driver |
Weiren Chou |
Upgrades
Upgrades
Future Accelerators
|
28 May 2003 |