8926-v2 |
Meson Area ArCO2 Gas Lines Schematic (rough drafts) |
Gordon M. Koizumi et al. |
External Beams
|
05 Jan 2021 |
1943-v2 |
Measurement of Switchyard Phase Space 18Aug05 |
Thomas R. Kobilarcik |
SY120
|
16 Dec 2020 |
8615-v28 |
120 GeV Beam Down MCenter to Meson Enclosure MC7 |
Gordon M. Koizumi |
External Beams
ESH
|
13 Nov 2020 |
8693-v2 |
Preparing BNB for 20 Hz Operation |
Alyssa R Miller |
External Beams
Instrumentation
|
12 Oct 2020 |
8052-v10 |
MS2 LCW upgrade plan notes |
Abhishek Deshpande et al. |
External Beams
MCenter
MTEST
|
09 Oct 2020 |
8672-v1 |
Meson Startup Checklist |
Adam Watts |
External Beams
MCenter
MTEST
|
15 Sep 2020 |
8658-v1 |
Deprecated version of 120 GeV Beam to MCenter (Part 2) |
Gordon M. Koizumi |
External Beams
ESH
|
04 Sep 2020 |
8655-v1 |
Deprecated 120 GeV Beam Down MCenter to Meson Enclosure MC7 |
Gordon M. Koizumi |
External Beams
ESH
|
04 Sep 2020 |
8037-v2 |
NOvA Test Beam Halo Discussions |
Adam Watts |
External Beams
MCenter
|
26 Jun 2020 |
6802-v3 |
NuMI Startup Checklist |
Adam Watts |
External Beams
|
24 Jun 2020 |
8484-v1 |
Dipole magnet bend center and sagitta correction |
Adam Watts |
External Beams
SY120
Beam Physics
MTEST
|
17 Jun 2020 |
7406-v2 |
Introduction to the Fundamentals of Particle Accelerators |
Adam Watts |
External Beams
Beam Physics
|
03 Jun 2020 |
8200-v12 |
BQB (3Q84) Quadrupole Tentative Stand Modifications |
Gordon M. Koizumi |
External Beams
Main Ring
|
28 May 2020 |
8311-v1 |
Accelerators for Neutrinos at Fermilab |
Paul Derwent |
External Beams
Booster
NuMI
Recycler
Projects
Main Injector
|
16 Apr 2020 |
7908-v3 |
NuMI Veto Interrupts MicroBooNE Data |
Alyssa R Miller |
Operations
External Beams
Booster
NuMI
Recycler
Controls
|
27 Mar 2020 |
6771-v17 |
BNB Accelerator Timing Signal Availability |
Alyssa R Miller |
External Beams
Hardware
MiniBooNE
Controls
|
25 Feb 2020 |
8025-v1 |
Ion Stripping at the Irradiation Physics Area |
Jason St. John |
External Beams
|
20 Feb 2020 |
7805-v1 |
BNB Target Beam Scans |
Alyssa R Miller |
External Beams
Instrumentation
|
11 Feb 2020 |
7718-v3 |
Making Room for PIP-II in F-sector |
Adam Watts |
External Beams
|
09 Dec 2019 |
7784-v1 |
Booster Neutrino Beamline Status |
Thomas R. Kobilarcik |
External Beams
|
25 Oct 2019 |
6937-v11 |
Switchyard TLMs |
Adam Watts et al. |
External Beams
Interlock Group
|
01 Oct 2019 |
7673-v1 |
NuMI Horn Longitudinal Field-Mapping System |
Adam Watts |
Target Hall Systems
External Beams
NuMI
Focusing Horns
|
20 Sep 2019 |
7465-v1 |
Transverse Phase Space Tomography in Beamlines - Tenth International Conference on Charged Particle Optics |
Adam Watts |
External Beams
Optics
|
10 Jul 2019 |
7166-v2 |
Introdution to MADX for Beamlines |
Adam Watts |
External Beams
|
25 Mar 2019 |
7064-v1 |
Moving the Interlocked Gate Near Downstream End of Main Ring F-sector Upstream |
Gordon M. Koizumi |
Operations
External Beams
Recycler
Main Ring
ESH
Main Injector
|
22 Mar 2019 |
6991-v1 |
Analysis of BNB Target Position Scan Performed 2018.10.31 |
Alyssa R Miller |
External Beams
MiniBooNE
Studies
|
11 Feb 2019 |
6904-v8 |
Bunch Rotation in the Booster Neutrino Beamline |
Thomas R. Kobilarcik |
External Beams
MiniBooNE
Studies
|
10 Jan 2019 |
6868-v1 |
Service Building Clean Up Photos |
Craig C Drennan |
External Beams
|
26 Nov 2018 |
6805-v1 |
Switchyard Startup Checklist |
Adam Watts |
External Beams
|
29 Oct 2018 |
6799-v1 |
Magnet Change-out Checklist |
Adam Watts |
External Beams
|
29 Oct 2018 |
6735-v1 |
State of the Relevant BNB Accelerator Timing Signals |
Alyssa R Miller |
External Beams
Controls
|
27 Sep 2018 |
6342-v6 |
Charged Particle Beam Optics for the proposed Irradiation Physics Area |
Jason St. John et al. |
External Beams
|
13 Aug 2018 |
6577-v2 |
Shielding Augmentation for the Proposed Irradiation Physics Area Cave |
Jason St. John |
External Beams
|
11 Aug 2018 |
6574-v1 |
Shielding Options for Irradiation Physics Area Roll Up Door |
Jason St. John |
External Beams
|
07 Aug 2018 |
6562-v1 |
MCenter Secondary Beamline for NOvA Test Beam |
Adam Watts |
External Beams
MCenter
|
31 Jul 2018 |
6324-v1 |
Multiple Scattering from Thin Targets for the proposed Irradiation Physics Area |
Jason St. John et al. |
External Beams
|
23 Jul 2018 |
6339-v2 |
A Study of Prompt and Residual Radiation in the Proposed Irradiation Physics Area |
Jason St. John |
External Beams
|
15 Jul 2018 |
6356-v2 |
Toward High-Intensity Ion Chambers in Switchyard |
Adam Watts |
SY120
Instrumentation
|
26 Jun 2018 |
6416-v1 |
Beam-Induced Heating of a Beryllium Target in the MTest Beamline |
Adam Watts |
MTEST
|
05 Jun 2018 |
6150-v1 |
Compensation of Beam Roll Due to HP3US Regulation Errors in Switchyard |
Adam Watts |
External Beams
Studies
SY120
Main Ring
|
27 Feb 2018 |
6023-v4 |
Intensity Monitors in the Fixed Target Area |
Thomas R. Kobilarcik et al. |
SY120
|
02 Feb 2018 |
4776-v3 |
Magnetic Field Measurements in the BnB 25 Meter Absorber |
Michael R Backfish |
External Beams
MiniBooNE
|
06 Jul 2017 |
5585-v1 |
MuCool Test Area (MTA) Experimental Capabilities March 2014 |
Michael R Backfish et al. |
External Beams
|
06 Jul 2017 |
5525-v2 |
Nova Test Beams Talk 6 14 2017 |
Michael R Backfish |
External Beams
MCenter
|
14 Jun 2017 |
5418-v1 |
A Ninety Degree Monitor For Better Target Tuning of the MCenter Secondary Beamline |
Michael R Backfish |
External Beams
MCenter
MTEST
|
16 May 2017 |
5364-v2 |
Prospects for a Muon Spin Resonance Facility in the MuCool Test Area |
John A. Johnstone |
External Beams
Muon
Linac
|
17 Apr 2017 |
5353-v2 |
Investigation Into MI52 Septa Wire Failures |
Michael R Backfish |
SY120
Beam Physics
Main Injector
|
23 Mar 2017 |
5324-v1 |
Investigation Into the Use of Rare Earth Magnets |
Michael R Backfish |
External Beams
|
08 Feb 2017 |
5323-v1 |
Measurement of Elliptical Beam Emittance in the Transverse Plane |
Adam Watts |
External Beams
Transverse Dynamics
Instrumentation
SY120
Transfer Lines
Optics
Beam Physics
Instrumentation
Beam Dynamics
|
08 Feb 2017 |
5284-v1 |
Computed Tomography of Transverse Phase Space |
Carol J. Johnstone et al. |
External Beams
Beam Physics
Instrumentation
|
21 Nov 2016 |
5242-v1 |
MiniBooNE Resistive Wall Current Monitor |
Michael R Backfish |
External Beams
MiniBooNE
|
03 Oct 2016 |
5231-v1 |
Magnetic field map for T977 tertiary beam |
Richard W Gran |
External Beams
MCenter
MTEST
|
13 Sep 2016 |
5225-v1 |
Simulated Tomography of Beam Transverse Phase Space |
Adam Watts |
External Beams
SY120
Optics
Beam Physics
Instrumentation
|
01 Sep 2016 |
5155-v1 |
Status of Switchyard Berm Pipe Cathodic Protection |
Adam Watts |
SY120
|
11 May 2016 |
5148-v1 |
Comments on Proton Beams for REDTOP |
Michael J. Syphers |
External Beams
Muon
|
02 May 2016 |
5098-v2 |
MICE Cavity Beam Tests in MTA Facility |
Michael R Backfish |
External Beams
|
07 Mar 2016 |
5040-v2 |
Magnetic Control of Fermilab Switchyard Beam Splits |
Adam Watts |
External Beams
Transverse Dynamics
SY120
|
24 Feb 2016 |
4831-v4 |
Simulation of Momentum Spread in the MTest Secondary Beamline |
Michael R Backfish |
Beam Physics
MTEST
|
18 Feb 2016 |
5064-v2 |
Meson Test Improvements During the January 2016 Shutdown |
Michael R Backfish |
External Beams
MTEST
|
04 Feb 2016 |
4697-v1 |
The Addition of an Air Gap in the Meson Test Secondary Beamline |
Michael R Backfish |
External Beams
MTEST
|
04 Feb 2016 |
4994-v5 |
Effects of Rough Vacuum in the P3 Beamline |
Adam Watts |
SY120
Main Ring
|
02 Feb 2016 |
5049-v2 |
Kicking the Booster Neutrino Beam Off Target |
Thomas R. Kobilarcik |
MiniBooNE
|
21 Jan 2016 |
5048-v1 |
Meson Test Cherenkov Detector Pressure Scans Talk for Switchyard Meeting |
Michael R Backfish |
Studies
MTEST
|
14 Jan 2016 |
5030-v1 |
Neutrino-Muon beamline emittance |
Carol J. Johnstone et al. |
External Beams
Studies
SY120
Optics
|
17 Dec 2015 |
5002-v2 |
Meson Center Primary Target Shielding Proposal |
Michael R Backfish |
External Beams
MCenter
|
13 Nov 2015 |
5000-v1 |
Measuring the Bunch Length of the Booster Neutrino Beamline Beam |
Michael R Backfish |
External Beams
MiniBooNE
|
12 Nov 2015 |
4915-v2 |
A Preliminary Beam Permit System for the Neutrino-Muon Beamline |
Adam Watts |
External Beams
SY120
Controls
|
06 Aug 2015 |
4886-v1 |
Operational Methods For Delivering Meson Test Beam to Fermi Test Beam Facility |
Michael R Backfish |
Operations
External Beams
SY120
MTEST
|
16 Jul 2015 |
4825-v3 |
Booster Neutrino Beamline Decay Pipe Inspection |
Thomas R. Kobilarcik |
Studies
|
21 May 2015 |
4573-v1 |
The Booster Neutrino Beamline |
Thomas R. Kobilarcik |
Accelerator Seminar
MiniBooNE
|
17 Apr 2014 |
4553-v1 |
Thoughts Concerning Vacuum in the Fixed Target Meson Area |
Thomas R. Kobilarcik |
MCenter
|
12 Mar 2014 |
4530-v1 |
NM4 Prompt Dose Investigation |
Michael I Geelhoed |
External Beams
|
04 Feb 2014 |
4396-v1 |
Switchyard 120 Cathodic Protection Status |
Michael I Geelhoed |
SY120
|
27 Jun 2013 |
4375-v2 |
NM3 Beam Cherenkov |
Michael I Geelhoed |
SY120
|
26 Jun 2013 |
4225-v3 |
High Rate Tracking Proposal |
Michael I Geelhoed |
MTEST
|
03 Oct 2012 |
4146-v2 |
Integration of ORKA and SY120 |
Thomas R. Kobilarcik |
SY120
|
26 Jun 2012 |
4039-v1 |
Optimization of g-2 target |
Sergei I. Striganov |
External Beams
Antiproton Source
|
24 Apr 2012 |
4076-v2 |
E906 Beam Status |
Michael I Geelhoed |
SY120
|
20 Feb 2012 |
4000-v7 |
HDPE Berm Pipe Radiation Integrity |
Michael I Geelhoed |
SY120
|
08 Dec 2011 |
4010-v2 |
HDPE Berm Pipe Aperture |
Michael I Geelhoed |
SY120
|
05 Dec 2011 |
4009-v4 |
Berm Pipe Aperture V 4 |
Michael I Geelhoed |
SY120
|
01 Dec 2011 |
4011-v1 |
HDPE Vacuum |
Michael I Geelhoed |
SY120
|
29 Nov 2011 |
4001-v3 |
Neutrino Muon Beamline Optics |
Michael I Geelhoed |
SY120
|
22 Nov 2011 |
3483-v1 |
LBNE - Lattice Optics (opus #1) |
John A. Johnstone |
Optics
Studies
|
25 Oct 2009 |
3236-v0 |
Accelerator Division Impact Statement for the Mu2e Proposal |
Michael J. Syphers |
External Beams
Antiproton Source
|
27 Oct 2008 |
3124-v1 |
FNAL Accelerator Complex Status |
Ron Moore |
Operations
External Beams
Booster
Recycler
Linac
Antiproton Source
Main Injector
Tevatron
|
20 Jun 2008 |
3090-v1 |
Tevatron Fixed Target Redux and the NuSOnG Proposal |
Michael J. Syphers |
Extraction
External Beams
SY120
Main Injector
Tevatron
|
06 May 2008 |
2849-v2 |
Discussion of Tevatron Fixed Target Options after Run II |
Michael J. Syphers |
General
SY120
|
13 Feb 2008 |
2272-v1 |
Fermilab Test Beam & The International Linear Collider |
Chuck Brown et al. |
Future Accelerators
MTEST
|
18 May 2006 |
2222-v1 |
Tevatron 120 -- Life after Run II? |
Michael J. Syphers |
General
CKM
SY120
MIPP
MTEST
|
03 Apr 2006 |
2178-v2 |
First Report of the Proton Study Group |
Sergei Nagaitsev et al. |
Operations
Upgrades
SY120
Other
General
|
03 Apr 2006 |
1900-v1 |
Report to the Fermilab Director by the Proton Committee |
Chuck Ankenbrandt et al. |
Upgrades
Operations
MiniBooNE
General
|
18 Jul 2005 |
1837-v1 |
A Proposal to Upgrade the Switchyard BPM |
Brajesh Choudhary |
SY120
BPM
BPM
|
20 May 2005 |
1750-v1 |
SY120 BPM Electronics Measurements |
James A. Fitzgerald |
Extraction
SY120
BPM
|
23 Mar 2005 |
1429-v2 |
Stacking and SY120 Pulses |
Dave McGinnis |
SY120
Accumulator
|
04 Nov 2004 |
1387-v3 |
Thoughts on SY120 Operation in FY'05 |
David E. Johnson |
SY120
|
01 Nov 2004 |
1403-v1 |
Bucker Learning Algorithm For Slow Spill |
Peter Prieto |
SY120
|
13 Oct 2004 |
1316-v1 |
SY120 Mixed-mode Operation |
David E. Johnson |
SY120
Transfer Lines
Transfer Lines
|
24 Aug 2004 |
1242-v2 |
Potential Optical Solutions For Pbar Stacking and SY120 Mixed-Mode Operation |
David E. Johnson |
SY120
|
07 Jul 2004 |
1120-v1 |
SY120Jamboree: Resonant Extraction Status and Plans |
David E. Johnson |
SY120
|
13 Apr 2004 |