7400-v1 |
Fermilab Main Injector: Promises Kept and More |
Bruce C. Brown |
Recycler
Main Injector
Project
|
19 Jun 2019 |
7172-v1 |
MI Gamma-t jump requirements |
David P Capista |
PIP-Iplus
Main Injector
Project
|
22 Mar 2019 |
5382-v1 |
MAIN INJECTOR NOTES |
Bruce C. Brown |
Project
Design Properties
|
11 May 2017 |
4294-v1 |
The Fermilab Main Injector Technical Design Handbook |
Management of Main Injector Project |
Main Injector
Project
Design Properties
|
15 Feb 2013 |
2201-v4 |
Beam collimation in the transfer line from 8~GeV linac to the Main Injector |
Alexandr Drozhdin |
Proton Plan
Project
Collimation
|
27 Jan 2012 |
2330-v1 |
Beam collimation in the Main Injector at Slip-Stacking Injection |
Bruce C. Brown et al. |
Project
Collimation
|
09 Jan 2009 |
2329-v1 |
Beam Loss Simulation in the Main Injector at Slip-Stacking Injection |
Bruce C. Brown et al. |
Project
Collimation
|
09 Jan 2009 |
961-v1 |
Painting injection to the Fermilab Main Injector |
Alexandr Drozhdin et al. |
Project
|
02 Jun 2008 |
2198-v1 |
Beam collimation in the Main Injector |
Bruce C. Brown et al. |
Project
Collimation
|
02 Jun 2008 |
2199-v1 |
Painting injection at 8~GeV to the Main Injector |
Alexandr Drozhdin |
Project
Beam Dynamics
|
02 Jun 2008 |
2200-v1 |
Painting injection at 8~GeV to the Main Injector |
Alexandr Drozhdin |
Project
Beam Dynamics
|
02 Jun 2008 |
2202-v1 |
Lifetime of Stark States Hydrogen Atom in Magnetic Field Calculation and Estimation of Losses at Stripping Injection |
Weiren Chou et al. |
Project
|
02 Jun 2008 |
2324-v1 |
Induction barrier RF and applications in the Main Injector |
Weiren Chou |
Project
Adv. Accelerator R&D
|
05 Jul 2006 |
1441-v1 |
The Proton Plan |
Bruce Baller et al. |
RF
Upgrades
Project
Projects
|
11 Nov 2004 |
476-v2 |
2.5 MHz acceleration in the Main Injector |
Vincent Wu |
Project
|
15 Sep 2004 |
864-v3 |
Pbar acceleration in the MI using 2.5 MHz and 53 MHz rf Systems |
Chandrashekhara M. Bhat et al. |
HLRF
Studies
Operations
Project
LLRF
|
09 Oct 2003 |
859-v1 |
Booster cogging for multiple batch operation of the Main Injector |
William A Pellico et al. |
Primary Proton Beam
LLRF
Commissioning
Project
Projects
Studies
|
02 Oct 2003 |
629-v1 |
2 MW Upgrade of the Fermilab Main Injector |
Weiren Chou |
Future Accelerators
Project
|
28 May 2003 |
212-v2 |
Short Summary of my Visit to Fermilab |
Charles Steinbach |
Extraction
HLRF
Project
|
10 Sep 1996 |
149-v2 |
Thoughts on FMI Application Programming, CHEP95 and the Main Injector |
C. Shekhar Mishra |
Controls
Other
Project
|
05 Oct 1995 |
102-v1 |
MIDB Users and Uses |
Rachid Baiod et al. |
Magnets
Project
|
24 Jan 1994 |
98-v1 |
FMI PCS Self Assessment Report |
Management of Main Injector Project |
Project
|
29 Oct 1993 |