7673-v1 |
NuMI Horn Longitudinal Field-Mapping System |
Adam Watts |
Target Hall Systems
External Beams
Focusing Horns
NuMI
|
20 Sep 2019 |
6820-v3 |
Strain Gauge Installation Procedure for HRMT43 |
Alyssa R Miller |
Target Hall Systems
|
11 Feb 2019 |
6510-v1 |
Proposal for upgrading the NuMI horn field-mapping system |
Adam Watts |
Target Hall Systems
NuMI
|
17 Jul 2018 |
6482-v1 |
NuMI Target Replacement Decision Briefing |
Robert M Zwaska |
Target Hall Systems
NuMI
|
26 Jun 2018 |
5355-v1 |
The Challenges of Next Generation Neutrino Beam Targetry |
Patrick G. Hurh et al. |
Target Hall Systems
NOvA
NuMI
|
23 Mar 2017 |
2390-v1 |
The NuMI Beam System: First Year of Operation |
Samuel R. Childress |
Extraction from Main Injector
Target Hall Systems
Primary Proton Beam
|
14 Aug 2006 |
1435-v1 |
The NUMI Beamline |
Samuel R. Childress et al. |
Extraction from Main Injector
Target Hall Systems
Commissioning
Focusing Horns
Monitoring Instrumentation
Primary Proton Beam
Run II
|
04 Nov 2004 |
724-v1 |
Optimization Studies of Beam Optics for the Low Energy Neutrino Production |
Valeriy I. Garkusha et al. |
Target Hall Systems
Focusing Horns
|
09 Jan 2004 |
735-v1 |
Locating the neutrino beam elements |
Adam Para |
Target Hall Systems
Commissioning
Focusing Horns
Monitoring Instrumentation
Alignment
|
16 Jul 2003 |
734-v1 |
Cross-Hair System Performance Requirements |
Deborah Harris |
Target Hall Systems
Monitoring Instrumentation
Alignment
|
16 Jul 2003 |
730-v1 |
Proposal for Continuously-Variable Beam Energy |
Deborah Harris et al. |
Target Hall Systems
|
15 Jul 2003 |
729-v1 |
Technical Design of the Target Pile Protection Baffle |
Valeriy I. Garkusha et al. |
Target Hall Systems
|
14 Jul 2003 |
723-v1 |
Further Studies of Target for the Low Energy NuMI Beam |
Valeriy I. Garkusha et al. |
Target Hall Systems
|
09 Jul 2003 |
716-v1 |
Preliminary Design Work and Neutrino Beam Calculations for the NuMI Project |
Valeriy I. Garkusha et al. |
Target Hall Systems
Focusing Horns
|
08 Jul 2003 |
715-v1 |
Conceptual Design Work and Neutrino Beam Calculations for the NuMI Project |
Valeriy I. Garkusha et al. |
Target Hall Systems
Focusing Horns
|
08 Jul 2003 |
714-v1 |
Preliminary Design Work on NBB Absorber and Target Prototype |
Valeriy I. Garkusha et al. |
Target Hall Systems
|
07 Jul 2003 |
712-v1 |
Monitoring NuMI Target |
Alex V. Kulik |
Target Hall Systems
|
07 Jul 2003 |
711-v1 |
Advanced Conceptual Design of the Full-Scale Fin Target and Engineering Design of the Target Prototypes for the NuMI Project |
Valeriy I. Garkusha et al. |
Target Hall Systems
General
|
03 Jul 2003 |
706-v1 |
Advanced Conceptual Design of the Low Energy Target and Beam Plug |
Valeriy I. Garkusha et al. |
Target Hall Systems
|
03 Jul 2003 |
707-v1 |
Comparison of Initial Conceptual Designs of the Low Energy Target |
Valeriy I. Garkusha et al. |
Target Hall Systems
|
03 Jul 2003 |
709-v1 |
Proposed Test of NuMI Prototype Target in Main Injector Beam |
Valeriy I. Garkusha et al. |
Target Hall Systems
|
03 Jul 2003 |
676-v1 |
Dynamic Stress Calculations for ME and LE Targets and Results of Prototyping for the LE Target |
Valeriy I. Garkusha et al. |
Target Hall Systems
|
20 Jun 2003 |
843-v1 |
Temperature and Stresses in the LE Target with 6.4 mm Wide Segments |
Valeriy I. Garkusha et al. |
Target Hall Systems
|
20 Jun 2001 |