1943-v2 |
Measurement of Switchyard Phase Space 18Aug05 |
Thomas R. Kobilarcik |
SY120
|
16 Dec 2020 |
8484-v1 |
Dipole magnet bend center and sagitta correction |
Adam Watts |
External Beams
SY120
Beam Physics
MTEST
|
17 Jun 2020 |
6356-v2 |
Toward High-Intensity Ion Chambers in Switchyard |
Adam Watts |
SY120
Instrumentation
|
26 Jun 2018 |
6150-v1 |
Compensation of Beam Roll Due to HP3US Regulation Errors in Switchyard |
Adam Watts |
External Beams
SY120
Studies
Main Ring
|
27 Feb 2018 |
6023-v4 |
Intensity Monitors in the Fixed Target Area |
Thomas R. Kobilarcik et al. |
SY120
|
02 Feb 2018 |
5353-v2 |
Investigation Into MI52 Septa Wire Failures |
Michael R Backfish |
Main Injector
SY120
Beam Physics
|
23 Mar 2017 |
5323-v1 |
Measurement of Elliptical Beam Emittance in the Transverse Plane |
Adam Watts |
External Beams
Transverse Dynamics
SY120
Instrumentation
Transfer Lines
Instrumentation
Optics
Beam Physics
Beam Dynamics
|
08 Feb 2017 |
5225-v1 |
Simulated Tomography of Beam Transverse Phase Space |
Adam Watts |
External Beams
SY120
Instrumentation
Optics
Beam Physics
|
01 Sep 2016 |
5155-v1 |
Status of Switchyard Berm Pipe Cathodic Protection |
Adam Watts |
SY120
|
11 May 2016 |
5040-v2 |
Magnetic Control of Fermilab Switchyard Beam Splits |
Adam Watts |
External Beams
Transverse Dynamics
SY120
|
24 Feb 2016 |
4994-v5 |
Effects of Rough Vacuum in the P3 Beamline |
Adam Watts |
SY120
Main Ring
|
02 Feb 2016 |
5030-v1 |
Neutrino-Muon beamline emittance |
Carol J. Johnstone et al. |
External Beams
SY120
Studies
Optics
|
17 Dec 2015 |
4915-v2 |
A Preliminary Beam Permit System for the Neutrino-Muon Beamline |
Adam Watts |
External Beams
SY120
Controls
|
06 Aug 2015 |
4886-v1 |
Operational Methods For Delivering Meson Test Beam to Fermi Test Beam Facility |
Michael R Backfish |
Operations
External Beams
SY120
MTEST
|
16 Jul 2015 |
4396-v1 |
Switchyard 120 Cathodic Protection Status |
Michael I Geelhoed |
SY120
|
27 Jun 2013 |
4375-v2 |
NM3 Beam Cherenkov |
Michael I Geelhoed |
SY120
|
26 Jun 2013 |
4146-v2 |
Integration of ORKA and SY120 |
Thomas R. Kobilarcik |
SY120
|
26 Jun 2012 |
4076-v2 |
E906 Beam Status |
Michael I Geelhoed |
SY120
|
20 Feb 2012 |
4000-v7 |
HDPE Berm Pipe Radiation Integrity |
Michael I Geelhoed |
SY120
|
08 Dec 2011 |
4010-v2 |
HDPE Berm Pipe Aperture |
Michael I Geelhoed |
SY120
|
05 Dec 2011 |
4009-v4 |
Berm Pipe Aperture V 4 |
Michael I Geelhoed |
SY120
|
01 Dec 2011 |
4011-v1 |
HDPE Vacuum |
Michael I Geelhoed |
SY120
|
29 Nov 2011 |
4001-v3 |
Neutrino Muon Beamline Optics |
Michael I Geelhoed |
SY120
|
22 Nov 2011 |
3090-v1 |
Tevatron Fixed Target Redux and the NuSOnG Proposal |
Michael J. Syphers |
Extraction
Main Injector
External Beams
SY120
Tevatron
|
06 May 2008 |
2849-v2 |
Discussion of Tevatron Fixed Target Options after Run II |
Michael J. Syphers |
General
SY120
|
13 Feb 2008 |
2222-v1 |
Tevatron 120 -- Life after Run II? |
Michael J. Syphers |
General
SY120
MIPP
CKM
MTEST
|
03 Apr 2006 |
2178-v2 |
First Report of the Proton Study Group |
Sergei Nagaitsev et al. |
Other
General
SY120
Operations
Upgrades
|
03 Apr 2006 |
1837-v1 |
A Proposal to Upgrade the Switchyard BPM |
Brajesh Choudhary |
SY120
BPM
BPM
|
20 May 2005 |
1750-v1 |
SY120 BPM Electronics Measurements |
James A. Fitzgerald |
Extraction
SY120
BPM
|
23 Mar 2005 |
1429-v2 |
Stacking and SY120 Pulses |
Dave McGinnis |
Accumulator
SY120
|
04 Nov 2004 |
1387-v3 |
Thoughts on SY120 Operation in FY'05 |
David E. Johnson |
SY120
|
01 Nov 2004 |
1403-v1 |
Bucker Learning Algorithm For Slow Spill |
Peter Prieto |
SY120
|
13 Oct 2004 |
1316-v1 |
SY120 Mixed-mode Operation |
David E. Johnson |
Transfer Lines
SY120
Transfer Lines
|
24 Aug 2004 |
1242-v2 |
Potential Optical Solutions For Pbar Stacking and SY120 Mixed-Mode Operation |
David E. Johnson |
SY120
|
07 Jul 2004 |
1120-v1 |
SY120Jamboree: Resonant Extraction Status and Plans |
David E. Johnson |
SY120
|
13 Apr 2004 |