1454-v3 |
Align DRF2 and Debuncher Momentum Cooling |
Brian E. Drendel |
RF
Stochastic Cooling
Debuncher
Operations
Instrumentation
|
30 Apr 2020 |
7133-v1 |
4-8 GHz Petter 180 Hybrid for the Pbar Debuncher Pickup |
Edward W. Cullerton |
RF
Debuncher
LLRF
|
20 Mar 2019 |
7139-v1 |
3.27 GHz IIR Notch Filter for the 2-4 GHz Stacktail Momentum Cooling System |
Edward W. Cullerton |
RF
Stochastic Cooling
|
20 Mar 2019 |
3552-v1 |
A 15-Hz spill cycle scenario for Mu2e |
Chandrashekhara M. Bhat et al. |
RF
Accumulator
Debuncher
Beam Dynamics
|
16 Feb 2010 |
2825-v4 |
Correcting the Accumulator Extraction Energy and Phase |
Steve Werkema |
RF
LLRF
|
28 Jul 2008 |
2854-v1 |
Document Pbar Running Conditions |
Brian E. Drendel |
Alignment
Controls
Studies/Commissioning
Vacuum/Water/Utilities
RF
Accumulator
Transfer Lines
Debuncher
Magnets
Stochastic Cooling
Operations
Instrumentation
Target Station
Antiproton Source
Beam Dynamics
Lattice
|
09 Aug 2007 |
1457-v2 |
Initial Thoughts on a Proposal for a Pbar Global Monitoring System |
Brian E. Drendel |
Alignment
Controls
Studies/Commissioning
Vacuum/Water/Utilities
RF
Transfer Lines
Accumulator
Stochastic Cooling
Magnets
Debuncher
Operations
Instrumentation
Target Station
Lattice
Beam Dynamics
|
14 Dec 2004 |