1453-v2 |
Measuring and Adjusting Accumulator Tunes |
Brian E. Drendel |
Accumulator
Operations
Instrumentation
Lattice
Beam Dynamics
|
30 Apr 2020 |
3977-v1 |
Longitudinal instabilities in the Accumulator for μ2e project |
Valeri Balbekov et al. |
Mu2e
Longitudinal Dynamics
Accumulator
Instabilities
|
25 Oct 2011 |
3871-v4 |
Beam Loading Studies in Accumulator Ring for µ2e project at Fermilab |
Valerii Balbekov et al. |
Mu2e
Accumulator
Beam Physics
Accelerator Seminar
|
29 Jun 2011 |
3552-v1 |
A 15-Hz spill cycle scenario for Mu2e |
Chandrashekhara M. Bhat et al. |
RF
Accumulator
Debuncher
Beam Dynamics
|
16 Feb 2010 |
2854-v1 |
Document Pbar Running Conditions |
Brian E. Drendel |
Alignment
Controls
Studies/Commissioning
Vacuum/Water/Utilities
RF
Transfer Lines
Accumulator
Stochastic Cooling
Magnets
Debuncher
Operations
Instrumentation
Target Station
Antiproton Source
Lattice
Beam Dynamics
|
09 Aug 2007 |
2470-v1 |
Run II Status and Goals: Can We Achieve 8 fb-1 |
Valeri A Lebedev |
Accumulator
Status
|
25 Sep 2006 |
2415-v1 |
Correct the Accumulator Extraction Energy |
Steve Werkema |
Accumulator
|
25 Aug 2006 |
2245-v1 |
Antiproton Source Studies and Stacking |
Keith E Gollwitzer |
Studies/Commissioning
Transfer Lines
Accumulator
Stochastic Cooling
Debuncher
Instrumentation
Accelerator Seminar
Lattice
|
18 Apr 2006 |
2173-v2 |
Innovative Beam Physics for High Luminosity at Hadron Colliders |
Chandrashekhara M. Bhat |
Longitudinal Dynamics
Beam Studies
Accumulator
Beam Dynamics
Beam Dynamics
|
26 Feb 2006 |
2009-v5 |
Optimizing Pbar Kicker Timing While Stacking |
Brian E. Drendel |
Accumulator
Magnets
Debuncher
Operations
|
07 Nov 2005 |
2022-v1 |
Recycler-Only Operations Luminosity Projections |
Dave McGinnis |
Operations
General
Accumulator
|
05 Nov 2005 |
1988-v3 |
Align Debuncher and Accumulator Bend Fields |
Brian E. Drendel |
Accumulator
Debuncher
Training Docs
|
20 Oct 2005 |
1992-v1 |
Proton Intensity Improvements for MINOS |
Dave McGinnis |
Accumulator
Upgrades
Stochastic Cooling
Alignment
|
14 Oct 2005 |
1980-v1 |
Phase Space and Antiproton Production at Fermilab |
Dave McGinnis |
Beam Dynamics
Accumulator
Beam Dynamics
Debuncher
Beam Dynamics
|
04 Oct 2005 |
1948-v1 |
Model of Antiproton Stack Size Versus Rapid Transfer Time |
Dave McGinnis |
Operations
Accumulator
|
05 Sep 2005 |
1942-v1 |
Stacking Monitor and the 4-8 GHz Stacking Thermostat |
Dave McGinnis |
Accumulator
Training Docs
Instrumentation
|
30 Aug 2005 |
1941-v1 |
ANTIPROTON AND NEUTRINO PRODUCTION ACCELERATOR TIMELINE ISSUES |
Dave McGinnis |
General
Accumulator
|
29 Aug 2005 |
1795-v3 |
Pbar Aggregates for Fast Recycler Shots |
Brian E. Drendel |
Operations
Accumulator
Operations
|
03 May 2005 |
1457-v2 |
Initial Thoughts on a Proposal for a Pbar Global Monitoring System |
Brian E. Drendel |
Alignment
Controls
Studies/Commissioning
Vacuum/Water/Utilities
RF
Transfer Lines
Accumulator
Stochastic Cooling
Magnets
Debuncher
Operations
Instrumentation
Target Station
Lattice
Beam Dynamics
|
14 Dec 2004 |
1485-v1 |
Pbar Stacking Report |
Dave McGinnis |
Alignment
Transfer Lines
Accumulator
Stochastic Cooling
Debuncher
Instrumentation
Lattice
|
05 Dec 2004 |
1429-v2 |
Stacking and SY120 Pulses |
Dave McGinnis |
Accumulator
SY120
|
04 Nov 2004 |