6113-v49 |
Technical Report on the Perpendicular Biased 2nd Harmonic Cavity for the Fermilab Booster |
Cheng-Yang Tan |
PIP
|
05 Jan 2021 |
6961-v1 |
PIP - Vacuum Valves Upgrade for Booster and 400 MeV |
David Augustine |
PIP
|
22 Jan 2019 |
6793-v1 |
Longitudinal Beam Dynamics Studies at the PIP-II Injector Test Facility |
Jean-Paul Carneiro |
Accelerator Seminar
Beam Physics
PIP
Projects
|
25 Oct 2018 |
6703-v1 |
2nd harmonic RF perpendicular biased cavity update (13 Sep 2018) |
Robyn L Madrak et al. |
PIP
|
13 Sep 2018 |
6673-v1 |
2nd harmonic RF perpendicular biased cavity update (30 Aug 2018) |
Kevin Duel et al. |
PIP
|
30 Aug 2018 |
6619-v1 |
Booster adiabatic capture meeting |
Chandrashekhara M. Bhat et al. |
PIP
|
17 Aug 2018 |
6607-v1 |
PIP Status Report Meeting |
Ken Domann et al. |
PIP
|
15 Aug 2018 |
6604-v1 |
PIP Status Report Meeting |
Ken Domann et al. |
PIP
|
15 Aug 2018 |
6601-v1 |
Simulation Study of RFQ Injection Line: Update |
Valery Kapin et al. |
PIP
|
15 Aug 2018 |
6583-v1 |
PIP: 2nd Harmonic Cavity Update |
Cheng-Yang Tan |
PIP
|
08 Aug 2018 |
6550-v1 |
PIP: Bunch length comparisons between operational, Bills and adiabatic paraphase curves |
Chandrashekhara M. Bhat et al. |
PIP
|
25 Jul 2018 |
6534-v1 |
2nd harmonic RF perpendicular biased cavity update (19 Jul 2018) |
Kevin Duel et al. |
PIP
|
19 Jul 2018 |
6434-v1 |
PIP: 2nd harmonic L11 installation sequencing plan |
Cheng-Yang Tan |
PIP
|
13 Jun 2018 |
6428-v1 |
2nd harmonic RF perpendicular biased cavity HLRF and LLRF (07 Jun 2018) |
Robert G Scala et al. |
PIP
|
07 Jun 2018 |
6389-v1 |
PIP: 2nd Harmonic Cavity Update |
Cheng-Yang Tan |
PIP
|
30 May 2018 |
6377-v1 |
2nd harmonic RF perpendicular biased cavity update (24 May 2018) |
Kevin Duel et al. |
PIP
|
25 May 2018 |
6362-v2 |
PIP: 2nd Harmonic Cavity Update |
Cheng-Yang Tan |
PIP
|
23 May 2018 |
6350-v1 |
2nd harmonic RF perpendicular biased cavity HLRF interlocks |
Cheng-Yang Tan |
PIP
|
23 May 2018 |
6330-v1 |
Fermilab Workshop on Megawatt Rings & IOTA/FAST Collaboration Meeting (Day 1) |
Chandrashekhara M. Bhat et al. |
PIP
|
09 May 2018 |
6288-v1 |
2nd harmonic RF perpendicular biased cavity update (26 Apr 2018) |
Kevin Duel et al. |
PIP
|
27 Apr 2018 |
6267-v1 |
2nd harmonic RF perpendicular biased cavity update (12 Apr 2018) |
Kevin Duel et al. |
PIP
|
12 Apr 2018 |
6255-v1 |
PIP Status Report Meeting |
Ken Domann et al. |
PIP
|
04 Apr 2018 |
6249-v2 |
PIP: 2nd Harmonic Cavity Update |
Cheng-Yang Tan |
PIP
|
04 Apr 2018 |
6243-v1 |
2nd harmonic RF perpendicular biased cavity update (29 Mar 2018) |
Kevin Duel et al. |
PIP
|
29 Mar 2018 |
6237-v1 |
2nd harmonic RF perpendicular biased cavity HLRF and LLRF (23 Mar 2018) |
Rene Padilla et al. |
PIP
|
23 Mar 2018 |
6216-v1 |
2nd harmonic RF perpendicular biased cavity update (15 Mar 2018) |
Kevin Duel et al. |
PIP
|
15 Mar 2018 |
6180-v1 |
Booster RF capture meeting |
Victor Grzelak et al. |
PIP
|
07 Mar 2018 |
6162-v1 |
2nd harmonic RF perpendicular biased cavity update (01 Mar 2018) |
Kevin Duel et al. |
PIP
|
01 Mar 2018 |
6117-v1 |
PIP Status Report Meeting |
Ken Domann et al. |
PIP
|
21 Feb 2018 |
6101-v1 |
2nd harmonic RF perpendicular biased cavity update (15 Feb 2018) |
Kevin Duel et al. |
PIP
|
15 Feb 2018 |
5350-v5 |
Y567b Power Amplifier Tests at 76 and 106 MHz |
Robyn L Madrak et al. |
Upgrades
PIP
HLRF
|
09 Feb 2018 |
6085-v1 |
2nd harmonic RF perpendicular biased cavity HLRF and LLRF (07 Feb 2018) |
Cheng-Yang Tan |
PIP
|
07 Feb 2018 |
6070-v1 |
2nd harmonic RF perpendicular biased cavity update (01 Feb 2018) |
Cheng-Yang Tan |
PIP
|
01 Feb 2018 |
6064-v1 |
PIP Status Report Meeting |
William A Pellico |
PIP
|
31 Jan 2018 |
6034-v1 |
2nd harmonic RF perpendicular biased cavity update (18 Jan 2018) |
Kevin Duel et al. |
PIP
|
18 Jan 2018 |
6029-v1 |
PIP: 2nd harmonic cavity update |
Cheng-Yang Tan |
PIP
|
17 Jan 2018 |
6005-v2 |
2nd harmonic RF perpendicular biased cavity update (21 Dec 2017) |
Cheng-Yang Tan |
PIP
|
21 Dec 2017 |
5969-v1 |
2nd harmonic RF perpendicular biased cavity update (07 Dec 2017) |
Kevin Duel et al. |
PIP
|
08 Dec 2017 |
5822-v1 |
Parallel-Biased Booster Replacement Cavity |
Mohamed H Hassan |
Booster
PIP
|
01 Dec 2017 |
5924-v1 |
2nd harmonic RF perpendicular biased cavity update (09 Nov 2017) |
Kevin Duel et al. |
PIP
|
09 Nov 2017 |
5876-v1 |
2nd harmonic RF perpendicular biased cavity update (12 Oct 2017) |
John Kuharik et al. |
PIP
|
30 Oct 2017 |
5858-v1 |
2nd harmonic RF perpendicular biased cavity update (28 Sep 2017) |
Gennady Romanov et al. |
PIP
|
28 Sep 2017 |
5834-v1 |
2nd harmonic RF perpendicular biased cavity update (14 Sep 2017) |
Kevin Duel et al. |
PIP
|
14 Sep 2017 |
5810-v1 |
2nd harmonic RF perpendicular biased cavity update (31 Aug 2017) |
John Kuharik et al. |
PIP
|
31 Aug 2017 |
5798-v1 |
2nd harmonic RF perpendicular biased cavity update (17 Aug 2017) |
Kevin Duel et al. |
PIP
|
17 Aug 2017 |
5774-v1 |
PIP: Booster Lattice Studies |
Cheng-Yang Tan |
PIP
|
09 Aug 2017 |
5756-v1 |
2nd harmonic RF perpendicular biased cavity update (03 Aug 2017) |
Cheng-Yang Tan |
PIP
|
03 Aug 2017 |
5663-v2 |
2nd harmonic RF perpendicular biased cavity update (20 Jul 2017) |
Kevin Duel et al. |
PIP
|
21 Jul 2017 |
5606-v2 |
Booster lattice meeting (12 Jul 2017) |
Cheng-Yang Tan |
PIP
|
13 Jul 2017 |
5591-v1 |
2nd harmonic RF perpendicular biased cavity update (06 Jul 2017) |
Kevin Duel et al. |
PIP
|
06 Jul 2017 |
5573-v1 |
Booster lattice meeting (28 Jun 2017) |
Yuri Alexahin et al. |
PIP
|
28 Jun 2017 |
5567-v3 |
2nd harmonic RF perpendicular biased cavity update (22 Jun 2017) |
Cheng-Yang Tan |
PIP
|
23 Jun 2017 |
5531-v1 |
Booster lattice meeting (14 Jun 2017) |
Yuri Alexahin et al. |
PIP
|
15 Jun 2017 |
5519-v1 |
Study of Two-Stage Collimation System in Fermilab Booster |
Valery Kapin |
PIP
|
12 Jun 2017 |
5501-v1 |
2nd harmonic RF perpendicular biased cavity update (08 Jun 2017) |
Kevin Duel et al. |
PIP
|
08 Jun 2017 |
5489-v1 |
Proposal to Use the Fermilab PIP-II Linac to Support a Low Energy Muon Program |
Adrian Hillier et al. |
PIP
|
05 Jun 2017 |
5477-v2 |
Booster lattice meeting (31 May 2017) |
Cheng-Yang Tan |
PIP
|
31 May 2017 |
5456-v1 |
2nd harmonic RF perpendicular biased cavity update (25 May 2017) |
Gennady Romanov et al. |
PIP
|
25 May 2017 |
5438-v1 |
Booster lattice meeting (17 May 2017) |
Yuri Alexahin et al. |
PIP
|
23 May 2017 |
5430-v1 |
PIP Status Report Meeting |
Ken Domann et al. |
PIP
|
20 May 2017 |
5406-v1 |
2nd harmonic RF perpendicular biased cavity update (11 May 2017) |
Kevin Duel et al. |
PIP
|
11 May 2017 |
5400-v2 |
Booster lattice meeting (03 May 2017) |
Yuri Alexahin et al. |
PIP
|
03 May 2017 |
5388-v1 |
2nd harmonic RF perpendicular biased cavity update (27 Apr 2017) |
Kevin Duel et al. |
PIP
|
28 Apr 2017 |
5371-v1 |
PIP Status Report Meeting |
Valery Kapin et al. |
PIP
|
19 Apr 2017 |
5367-v1 |
2nd harmonic RF perpendicular biased cavity update (13 Apr 2017) |
Kevin Duel et al. |
PIP
|
13 Apr 2017 |
5365-v2 |
Booster lattice meeting (12 Apr 2017) |
Yuri Alexahin et al. |
PIP
|
12 Apr 2017 |
5361-v1 |
PIP1+: Booster lattice measurements |
Kiyomi Seiya et al. |
PIP
|
03 Apr 2017 |
5358-v1 |
2nd harmonic RF perpendicular biased cavity update (30 Mar 2017) |
Kevin Duel et al. |
PIP
|
30 Mar 2017 |
5354-v1 |
PIP Status Report Meeting |
Ken Domann |
PIP
|
22 Mar 2017 |
5352-v2 |
Laser Notcher status 3-22-17 |
David E. Johnson |
PIP
|
22 Mar 2017 |
5351-v1 |
Booster lattice meeting (22 Mar 2017) |
Yuri Alexahin et al. |
PIP
|
22 Mar 2017 |
5348-v1 |
2nd harmonic RF perpendicular biased cavity update (16 Mar 2017) |
Kevin Duel et al. |
PIP
|
17 Mar 2017 |
5345-v1 |
PIP Status Report Meeting |
Salah Chaurize et al. |
PIP
|
13 Mar 2017 |
5343-v1 |
Booster lattice meeting (08 Mar 2017) |
Alexandru Macridin et al. |
PIP
|
08 Mar 2017 |
5342-v1 |
2nd harmonic RF perpendicular biased cavity update (02 Mar 2017) |
Kevin Duel et al. |
PIP
|
02 Mar 2017 |
5329-v1 |
2nd harmonic RF perpendicular biased cavity update (16 Feb 2017) |
Kevin Duel et al. |
PIP
|
02 Mar 2017 |
5340-v1 |
A proposal for upgrade of Booster collimation system |
Valery Kapin |
PIP
|
22 Feb 2017 |
5339-v1 |
Booster lattice meeting (22 Feb 2017) |
Alexandru Macridin et al. |
PIP
|
22 Feb 2017 |
5338-v1 |
PIP: Booster Lattice Measurements |
Cheng-Yang Tan |
PIP
|
22 Feb 2017 |
5325-v1 |
2nd harmonic RF perpendicular biased cavity mechanical update (09 Feb 2017) |
Kevin Duel et al. |
PIP
|
10 Feb 2017 |
5321-v1 |
2nd harmonic RF perpendicular biased cavity update (02 Feb 2017) |
Kevin Duel et al. |
PIP
|
03 Feb 2017 |
5320-v1 |
2nd harmonic RF perpendicular biased cavity update (19 Jan 2017) |
Kevin Duel et al. |
PIP
|
02 Feb 2017 |
5317-v1 |
PIP Status Report Meeting |
Ken Domann et al. |
PIP
|
25 Jan 2017 |
5312-v1 |
2nd harmonic RF perpendicular biased cavity update (19 Jan 2017) |
Kevin Duel et al. |
PIP
|
19 Jan 2017 |
5308-v2 |
PIP Status Report Meeting |
Rene Padilla et al. |
PIP
|
11 Jan 2017 |
5303-v1 |
2nd harmonic RF perpendicular biased cavity update (05 Jan 2017) |
Kevin Duel et al. |
PIP
|
05 Jan 2017 |
5300-v1 |
PIP Status Report Meeting |
Ken Domann et al. |
PIP
|
21 Dec 2016 |
5294-v1 |
PIP New Tuners Summary Report |
Patrick G. Sheahan et al. |
PIP
HLRF
|
14 Dec 2016 |
5289-v1 |
2nd harmonic RF perpendicular biased cavity update (08 Dec 2016) |
Kevin Duel et al. |
PIP
|
08 Dec 2016 |
5288-v1 |
Criteria for proceeding with replacement Booster cavity (PIP) |
William A Pellico |
Booster
PIP
|
05 Dec 2016 |
5286-v1 |
Closeout - Recommendations and Comments |
Fernanda G Garcia |
PIP
|
30 Nov 2016 |
5274-v1 |
Timetable |
Fernanda G Garcia |
PIP
|
22 Nov 2016 |
5272-v1 |
Answers to Reviewer Questions |
David E. Johnson |
PIP
|
22 Nov 2016 |
5270-v1 |
Laser Instrumentation |
Todd R. Johnson |
PIP
|
22 Nov 2016 |
5268-v2 |
July Commissioning and Upgrade palns |
David E. Johnson |
PIP
|
22 Nov 2016 |
5267-v1 |
Pulse Formation and Fiber System |
David E. Johnson |
PIP
|
22 Nov 2016 |
5269-v2 |
Laser Notcher Free Space Optics |
Todd R. Johnson |
PIP
|
22 Nov 2016 |
5266-v2 |
Overall Design of Laser Notcher System |
Kevin Duel et al. |
PIP
|
22 Nov 2016 |
5265-v1 |
Welcome / Charge / Motivation |
Fernanda G Garcia et al. |
PIP
|
22 Nov 2016 |
5276-v1 |
2nd harmonic RF perpendicular biased cavity update (17 Nov 2016) |
Kevin Duel et al. |
PIP
|
18 Nov 2016 |
5261-v1 |
2nd harmonic RF perpendicular biased cavity update (27 Oct 2016) |
Matt R Kufer et al. |
PIP
|
18 Nov 2016 |
5262-v1 |
PIP Status Report Meeting |
David E. Johnson et al. |
PIP
|
28 Oct 2016 |
5260-v1 |
PIP: Summary of DC studies held between 12 Oct to 14 Oct 2016 |
Cheng-Yang Tan |
PIP
|
27 Oct 2016 |
5257-v2 |
PIP Status Report Meeting |
Ken Domann et al. |
PIP
|
26 Oct 2016 |
5254-v1 |
Laser Nothcher Status 10-19-2016 |
David E. Johnson et al. |
Projects
PIP
|
19 Oct 2016 |
5241-v4 |
2nd harmonic RF perpendicular biased cavity update (29 Sep 2016) |
Gennady Romanov et al. |
PIP
|
29 Sep 2016 |
5222-v2 |
PIP Status Report Meeting |
Valery Kapin et al. |
PIP
|
28 Sep 2016 |
5240-v1 |
PIP Status Report Meeting |
Trevor A Butler et al. |
PIP
|
28 Sep 2016 |
5239-v1 |
PIP Status Report Meeting |
Matthew H Gardner et al. |
PIP
|
27 Sep 2016 |
5185-v4 |
2nd harmonic RF perpendicular biased cavity update (12 July 2016) |
Kevin Duel et al. |
PIP
|
22 Sep 2016 |
5232-v1 |
2nd harmonic RF perpendicular biased cavity update (15 Sep 2016) |
Robyn L Madrak et al. |
PIP
|
15 Sep 2016 |
5224-v1 |
2nd harmonic RF perpendicular biased cavity update (01 Sep 2016) |
Gennady Romanov et al. |
PIP
|
01 Sep 2016 |
5218-v1 |
2nd harmonic RF perpendicular biased cavity update (18 Aug 2016) |
Kevin Duel et al. |
PIP
|
18 Aug 2016 |
5206-v1 |
PIP Status Report Meeting |
David E. Johnson et al. |
PIP
Linac
|
11 Aug 2016 |
5202-v2 |
2nd harmonic RF perpendicular biased cavity update (28 July 2016) |
Kevin Duel et al. |
PIP
|
29 Jul 2016 |
5200-v1 |
PIP Status Report Meeting |
Ken Domann et al. |
PIP
|
27 Jul 2016 |
5196-v1 |
PIP Status Report Meeting |
William A Pellico |
PIP
|
19 Jul 2016 |
5175-v1 |
2nd harmonic RF perpendicular biased cavity update (16 June 2016) |
Kevin Duel et al. |
PIP
|
30 Jun 2016 |
5183-v1 |
2nd harmonic RF perpendicular biased cavity update (30 June 2016) |
Kevin Duel et al. |
PIP
|
30 Jun 2016 |
5174-v1 |
PIP: Measurements and simulations of beam crossing transition |
Chandrashekhara M. Bhat et al. |
PIP
|
15 Jun 2016 |
5171-v1 |
2nd harmonic RF perpendicular biased cavity update (02 June 2016) |
Kevin Duel et al. |
PIP
|
03 Jun 2016 |
5158-v1 |
2nd harmonic RF perpendicular biased cavity update (19 May 2016) |
Kevin Duel et al. |
PIP
|
19 May 2016 |
5152-v1 |
2nd harmonic RF perpendicular biased cavity update (05 May 2016) |
Gennady Romanov et al. |
PIP
|
05 May 2016 |
5144-v1 |
2nd harmonic RF perpendicular biased cavity update (21 Apr 2016) |
Kevin Duel et al. |
PIP
|
21 Apr 2016 |
5142-v1 |
PIP: LOCO update |
Ken Domann et al. |
PIP
|
20 Apr 2016 |
5136-v2 |
PIP: 2nd Harmonic Cavity Update |
William A Pellico et al. |
PIP
|
20 Apr 2016 |
5137-v1 |
Experience with the ferrite tuner for LEB (1992-1993) |
Vyacheslav Yakovlev |
PIP
|
15 Apr 2016 |
5132-v1 |
PIP Status Report Meeting |
Valery Kapin et al. |
PIP
|
08 Apr 2016 |
5134-v1 |
2nd harmonic RF perpendicular biased cavity update (07 Apr 2016) |
Kevin Duel et al. |
PIP
|
07 Apr 2016 |
5114-v1 |
2nd harmonic RF perpendicular biased cavity update (24 Mar2016) |
Kevin Duel et al. |
PIP
|
24 Mar 2016 |
5113-v1 |
PIP Status Report Meeting |
Ken Domann et al. |
PIP
|
24 Mar 2016 |
5112-v1 |
PIP Status Report Meeting |
Trevor A Butler et al. |
PIP
|
24 Mar 2016 |
5100-v1 |
2nd harmonic RF perpendicular biased cavity update (10 Mar2016) |
Gennady Romanov et al. |
PIP
|
10 Mar 2016 |
5097-v2 |
Laser Notcher Status |
David E. Johnson |
Projects
Projects
PIP
|
02 Mar 2016 |
5095-v1 |
2nd harmonic RF perpendicular biased cavity update (25 Feb 2016) |
Kevin Duel et al. |
PIP
|
25 Feb 2016 |
5079-v1 |
Booster Collimators |
Valery Kapin |
PIP
|
17 Feb 2016 |
5071-v1 |
2nd harmonic RF perpendicular biased cavity update (11 Feb 2016) |
Kevin Duel et al. |
PIP
|
11 Feb 2016 |
5070-v1 |
PIP Status Report Meeting |
Trevor A Butler et al. |
PIP
|
10 Feb 2016 |
5060-v1 |
PIP Status Report Meeting |
Chandrashekhara M. Bhat et al. |
PIP
|
01 Feb 2016 |
5058-v3 |
An Update on Early Injection Capture in the Booster |
Chandrashekhara M. Bhat |
Operations
PIP
|
01 Feb 2016 |
5059-v2 |
2nd harmonic RF perpendicular biased cavity update (28 Jan 2016) |
Gennady Romanov et al. |
PIP
|
29 Jan 2016 |
5047-v1 |
2nd harmonic RF perpendicular biased cavity update (14 Jan 2016) |
Cheng-Yang Tan et al. |
PIP
|
14 Jan 2016 |
5044-v1 |
PIP Meeting |
Thomas K Kroc et al. |
PIP
|
13 Jan 2016 |
5046-v2 |
PIP Meeting: 2nd Harmonic cavity Update |
Cheng-Yang Tan |
PIP
|
13 Jan 2016 |
5045-v1 |
PIP Status Report Meeting |
Ken Domann et al. |
PIP
|
13 Jan 2016 |
4610-v18 |
PIP RF Cavity and Tuners Refurbishement Progress & Projections |
Keith E Gollwitzer |
Upgrades
PIP
|
11 Jan 2016 |
4566-v3 |
Optics corrections in Booster |
Cheng-Yang Tan |
PIP
|
21 Dec 2015 |
5027-v1 |
PIP: Improving and fixing the Booster MADX model |
Cheng-Yang Tan |
PIP
|
16 Dec 2015 |
5022-v1 |
2nd harmonic RF perpendicular biased cavity update (10 Dec 2015) |
Robyn L Madrak et al. |
PIP
|
10 Dec 2015 |
5013-v2 |
Workshop on Booster Performance and Enhancements 23 Nov - 24 Nov |
Chandrashekhara M. Bhat et al. |
PIP
|
09 Dec 2015 |
5020-v1 |
Plan for booster collimations (Dec2015-summer2016) |
Valery Kapin |
PIP
|
08 Dec 2015 |
4864-v2 |
Simplified Modeling of Space Charge Losses in Booster at Injection |
Alexander A. Valishev |
Beam Dynamics
PIP
|
23 Nov 2015 |
5009-v1 |
Recommendations from review of 700kW plan |
Mary Convery |
PIP
Recycler
|
17 Nov 2015 |
5001-v3 |
2nd harmonic RF perpendicular biased cavity update (12 Nov 2015) |
Gennady Romanov et al. |
PIP
|
12 Nov 2015 |
4992-v1 |
PIP Status Report Meeting |
Ken Domann et al. |
PIP
|
28 Oct 2015 |
4981-v1 |
2nd harmonic RF perpendicular biased cavity update (15 Oct 2015) |
Gennady Romanov et al. |
PIP
|
15 Oct 2015 |
4960-v1 |
PIP Status Report Meeting |
Ken Domann et al. |
Booster
PIP
|
26 Sep 2015 |
4958-v1 |
2nd Harmonic Perpendicular Biased Cavity for Booster |
Cheng-Yang Tan |
PIP
|
25 Sep 2015 |
4956-v1 |
2nd harmonic RF perpendicular biased cavity update (24 Sep 2015) |
Robyn L Madrak et al. |
PIP
|
25 Sep 2015 |
4943-v1 |
Proton Improvement Plan / Proton Source Ready for 700kW |
William A Pellico |
Booster
PIP
|
10 Sep 2015 |
4945-v1 |
Introduction -- 700kW Followup Review |
Mary Convery |
Main Injector
PIP
Recycler
|
10 Sep 2015 |
4946-v1 |
2nd harmonic RF perpendicular biased cavity update (10 Sep 2015) |
Mohamed Awida et al. |
PIP
|
10 Sep 2015 |
4937-v3 |
PIP Status Report Meeting |
Trevor A Butler et al. |
PIP
|
02 Sep 2015 |
4933-v2 |
2nd harmonic RF perpendicular biased cavity update (27 Aug 2015) |
Ding Sun et al. |
PIP
|
27 Aug 2015 |
4922-v2 |
2nd harmonic RF perpendicular biased cavity update (13 Aug 2015) |
Gennady Romanov et al. |
PIP
|
14 Aug 2015 |
4920-v1 |
PIP Status Report Meeting |
Ryan Crawford et al. |
Booster
PIP
Linac
|
12 Aug 2015 |
4902-v1 |
PIP Status Report Meeting |
Tom N Kubicki et al. |
PIP
|
04 Aug 2015 |
4903-v1 |
2nd harmonic RF perpendicular biased cavity update (30 July 2015) |
Kevin Duel et al. |
PIP
|
30 Jul 2015 |
4893-v1 |
PIP Status Report Meeting |
Trevor A Butler et al. |
PIP
Upgrades
|
22 Jul 2015 |
4892-v2 |
2nd harmonic RF perpendicular biased cavity special meeting on matching |
Cheng-Yang Tan |
PIP
|
21 Jul 2015 |
4885-v1 |
2nd harmonic RF perpendicular biased cavity update (16 July 2015) |
Gennady Romanov et al. |
PIP
|
16 Jul 2015 |
4879-v1 |
2nd harmonic RF perpendicular biased cavity update (01 July 2015) |
Robyn L Madrak et al. |
PIP
|
01 Jul 2015 |
4871-v1 |
PIP Status Report Meeting |
Ken Domann et al. |
PIP
|
29 Jun 2015 |
4865-v1 |
Talks presented at the PIP Status Meeting |
William A Pellico |
PIP
|
17 Jun 2015 |
4855-v2 |
2nd harmonic RF perpendicular biased cavity special meeting on power coupler |
Gennady Romanov et al. |
PIP
|
11 Jun 2015 |
4847-v1 |
2nd harmonic RF perpendicular biased cavity update (21 May 2015) |
Gennady Romanov et al. |
PIP
|
09 Jun 2015 |
4853-v1 |
2nd harmonic RF perpendicular biased cavity update (4 June 2015) |
Gennady Romanov et al. |
PIP
|
04 Jun 2015 |
4852-v2 |
PIP Status Report Meeting |
Ryan Crawford et al. |
PIP
|
03 Jun 2015 |
4846-v1 |
PIP Status Report Meeting |
Trevor A Butler et al. |
PIP
|
20 May 2015 |
4821-v1 |
Plan for PA test at 76/106 MHz |
Joseph E. Dey et al. |
PIP
|
30 Apr 2015 |
4820-v1 |
PIP Status Report Meeting |
Ryan Crawford et al. |
PIP
|
29 Apr 2015 |
4812-v1 |
PIP Status Report Meeting |
Ken Domann et al. |
PIP
|
22 Apr 2015 |
4804-v1 |
2nd harmonic RF perpendicular biased cavity update (15 Apr 2015) |
Robyn L Madrak et al. |
PIP
|
16 Apr 2015 |
4795-v1 |
PIP Status Report Meeting |
Raymond Tomlin et al. |
PIP
|
14 Apr 2015 |
4801-v1 |
PIP Status Report Meeting |
Joe Compton et al. |
PIP
|
13 Apr 2015 |
4796-v2 |
2nd harmonic RF perpendicular biased cavity update (02 Apr 2015) |
Robyn L Madrak et al. |
PIP
|
02 Apr 2015 |
4794-v1 |
PIP Status Report Meeting |
Ken Domann et al. |
PIP
|
30 Mar 2015 |
4784-v1 |
PIP Status Report Meeting |
Joe Compton et al. |
PIP
|
16 Mar 2015 |
4783-v2 |
2nd harmonic RF perpendicular biased cavity update (12 Mar 2015) |
Gennady Romanov et al. |
PIP
|
12 Mar 2015 |
4779-v1 |
PIP Status Report Meeting |
Ryan Crawford et al. |
Booster
PIP
|
09 Mar 2015 |
4778-v1 |
PIP: LOCO update |
Cheng-Yang Tan |
PIP
|
04 Mar 2015 |
4774-v1 |
PIP Status Report Meeting |
Trevor A Butler et al. |
PIP
Linac
Upgrades
|
25 Feb 2015 |
4770-v1 |
2nd harmonic RF perpendicular biased cavity update (17 Feb 2015) |
Robyn L Madrak et al. |
PIP
|
17 Feb 2015 |
4763-v1 |
PIP Status Report Meeting |
Tom N Kubicki et al. |
Booster
PIP
HLRF
|
13 Feb 2015 |
4756-v1 |
2nd harmonic RF perpendicular biased cavity update (30 Sep 2014) |
Robyn L Madrak et al. |
PIP
|
05 Feb 2015 |
4755-v1 |
2nd harmonic RF perpendicular biased cavity update (12 Sep 2014) |
Robyn L Madrak et al. |
PIP
|
05 Feb 2015 |
4754-v1 |
2nd harmonic RF perpendicular biased cavity update (14Jan2015 - 03 Feb 2015) |
Robyn L Madrak et al. |
PIP
|
03 Feb 2015 |
4753-v1 |
PIP Status Report Meeting |
Ken Domann et al. |
Booster
PIP
|
02 Feb 2015 |
4738-v2 |
Laser Notcher Demonstration Experiment |
Matthew H Gardner et al. |
PIP
|
14 Jan 2015 |
4739-v1 |
2nd harmonic RF perpendicular biased cavity update (Dec 2014- 14Jan2015) |
Robyn L Madrak et al. |
PIP
|
14 Jan 2015 |
4731-v1 |
PIP Status Report Meeting |
Ryan Crawford et al. |
PIP
|
17 Dec 2014 |
4724-v1 |
PIP Status Report Meeting |
David E. Johnson |
PIP
Linac
|
10 Dec 2014 |
4721-v1 |
2nd harmonic RF perpendicular biased cavity update (Nov-Dec 2014) |
Cheng-Yang Tan |
PIP
|
10 Dec 2014 |
4719-v1 |
Enhancements of the Fermilab Booster to Reduce Losses and Extend Lifetime: The Proton Improvement Plan |
Robert M Zwaska |
Booster
PIP
Linac
|
30 Nov 2014 |
4718-v1 |
PIP Status Report Meeting |
Ken Domann et al. |
PIP
HLRF
|
25 Nov 2014 |
4712-v1 |
PIP Status Report Meeting |
Ryan Crawford et al. |
Booster
PIP
Linac
|
19 Nov 2014 |
4711-v1 |
Laser Notcher Pulse Energy Requirements & Demonstration Experiment |
David E. Johnson et al. |
PIP
Upgrades
|
19 Nov 2014 |
4700-v2 |
Preparing for PIP II - What are the issues and plans for Booster |
William A Pellico |
Accelerator Seminar
Booster
PIP
|
18 Nov 2014 |
4698-v1 |
2nd harmonic RF perpendicular biased cavity update (Oct-Nov 2014) |
Cheng-Yang Tan |
PIP
|
11 Nov 2014 |
4693-v1 |
PIP Status Report Meeting |
Trevor A Butler et al. |
PIP
Linac
Upgrades
|
29 Oct 2014 |
4691-v3 |
2nd harmonic RF perpendicular biased cavity update (Oct 2014) |
Cheng-Yang Tan |
PIP
|
21 Oct 2014 |
4684-v1 |
PIP General Meeting Status Update |
Keith E Gollwitzer |
Booster
PIP
Linac
Regular Meetings
|
16 Oct 2014 |
4021-v2 |
PIP Linac Modulator Specification Data |
Trevor A Butler et al. |
PIP
Linac
|
22 Sep 2014 |
4664-v4 |
Numerical Studies for Proton Improvement Plan at Fermilab |
Leonid Vorobiev |
Instabilities
Beam Dynamics
Longitudinal Dynamics
Beam Dynamics
Transverse Dynamics
PIP
Energy Deposition
|
19 Sep 2014 |
4669-v1 |
PIP Status Report Meeting |
William A Pellico |
PIP
|
17 Sep 2014 |
4663-v1 |
PIP: 2nd harmonic cavity eddy current considerations |
Cheng-Yang Tan |
PIP
|
29 Aug 2014 |
4660-v8 |
PIP Status Report Meeting |
David Augustine et al. |
PIP
|
20 Aug 2014 |
4651-v1 |
PIP General Info |
William A Pellico et al. |
PIP
|
14 Aug 2014 |
4649-v5 |
PIP Linac Notcher - September Readiness Review |
Jean-Paul Carneiro et al. |
PIP
Upgrades
|
13 Aug 2014 |
4646-v1 |
PIP Status Report Meeting |
Ken Domann et al. |
Beam Dynamics
PIP
Linac
|
02 Aug 2014 |
4631-v1 |
PIP Status Report Meeting |
Ken Domann et al. |
PIP
|
03 Jul 2014 |
4628-v1 |
PIP Status Report Meeting |
Ryan Crawford et al. |
Booster
PIP
|
26 Jun 2014 |
4627-v2 |
PIP: 2nd Harmonic Cavity Update |
Cheng-Yang Tan |
PIP
|
25 Jun 2014 |
4620-v1 |
PIP Status Report Meeting |
William A Pellico et al. |
Booster
PIP
HLRF
|
20 Jun 2014 |
4609-v1 |
PIP General Info |
Ken Domann et al. |
PIP
|
28 May 2014 |
4606-v1 |
Doubling the Main Injector Beam Power |
Ioanis Kourbanis |
Accelerator Seminar
Main Injector
PIP
Recycler
|
20 May 2014 |
4597-v1 |
2nd harmonic RF perpendicular biased cavity update (04 Apr 16 May 2014) |
Cheng-Yang Tan |
PIP
|
16 May 2014 |
4587-v1 |
PIP Status Report Meeting |
Nathan Eddy et al. |
Booster
PIP
|
30 Apr 2014 |
4585-v1 |
PIP General Info |
Ken Domann et al. |
PIP
|
24 Apr 2014 |
4584-v1 |
PIP Status Update - Linac Utilities Report |
Matthew H Gardner |
PIP
|
23 Apr 2014 |
4569-v1 |
PIP General Info |
William A Pellico |
PIP
|
10 Apr 2014 |
4567-v2 |
2nd harmonic RF perpendicular biased cavity update (-- 04 Apr 2014) |
Cheng-Yang Tan |
PIP
|
04 Apr 2014 |
4565-v1 |
Booster Bias Supply Upgrade |
Patrick G. Sheahan |
Booster
PIP
|
02 Apr 2014 |
4564-v2 |
PIP: 2nd harmonic RF perpendicular biased cavity update |
Cheng-Yang Tan |
PIP
|
02 Apr 2014 |
4554-v1 |
PIP General Info |
Salah Chaurize et al. |
Booster
PIP
|
13 Mar 2014 |
4552-v1 |
Accelerator Operations and PIP |
Sergei Nagaitsev |
Operations
PIP
|
11 Mar 2014 |
4547-v1 |
PIP General Info |
Ken Domann et al. |
PIP
|
20 Feb 2014 |
4538-v1 |
PIP General Info |
Fernanda G Garcia |
PIP
|
11 Feb 2014 |
4536-v1 |
PIP: LOCO for Booster |
Cheng-Yang Tan |
PIP
|
11 Feb 2014 |
4534-v1 |
35 Years of H- Ions at Fermilab |
Dan Bollinger |
Pre-Accelerator
Accelerator Seminar
PIP
|
06 Feb 2014 |
4501-v1 |
PIP General Info |
Trevor A Butler et al. |
PIP
|
27 Dec 2013 |
4499-v1 |
3-CELL TEST RESULTS & 9-CELL PLAN |
Howard Pfeffer |
HLRF
PIP
|
18 Dec 2013 |
4492-v1 |
PIP General Info |
Ken Domann et al. |
Beam Dynamics
PIP
LLRF
|
04 Dec 2013 |
4490-v1 |
Status of Pulser for Short Magnets |
Chris Jensen |
Power Supplies
PIP
|
04 Dec 2013 |
4480-v2 |
PIP General Info |
Ken Domann et al. |
PIP
|
07 Nov 2013 |
4479-v1 |
Preliminary consideration of perpendicularly biased Booster cavity |
Gennady Romanov |
PIP
HLRF
|
07 Nov 2013 |
4454-v1 |
Source Development |
Dan Bollinger |
Pre-Accelerator
PIP
|
24 Sep 2013 |
4453-v1 |
PIP General Info |
William A Pellico |
PIP
|
24 Sep 2013 |
4443-v1 |
Booster Cavity: Parametric Study |
Mohamed H Hassan et al. |
Booster
PIP
HLRF
|
16 Sep 2013 |
4442-v1 |
PIP General Info |
William A Pellico |
PIP
|
16 Sep 2013 |
4431-v1 |
Booster Aperture and Alignment |
Kiyomi Seiya |
Booster
PIP
|
22 Aug 2013 |
4430-v1 |
PIP General Info |
Ken Domann et al. |
PIP
|
21 Aug 2013 |
4424-v2 |
TRACK 3D SIMULATIONS OF THE PIP RFQ |
Jean-Paul Carneiro |
PIP
|
13 Aug 2013 |
4419-v1 |
Booster New Cavities - PIP |
Mohamed H Hassan |
Booster
PIP
|
24 Jul 2013 |
4412-v1 |
PIP General Info |
William A Pellico |
PIP
|
11 Jul 2013 |
4306-v1 |
Linac Laser Notcher Status |
David E. Johnson |
Projects
PIP
|
28 Jun 2013 |
4392-v1 |
PIP General Info |
William A Pellico |
PIP
|
24 Jun 2013 |
4380-v2 |
The FNAL 400 MeV Linac in TRACEWIN |
Jean-Paul Carneiro |
PIP
Linac
|
11 Jun 2013 |
4363-v2 |
Plans for Booster & Linac Transformer Installation |
Ryan Crawford |
Booster
Upgrades
PIP
Linac
Upgrades
|
08 May 2013 |
4366-v1 |
PIP General Info |
William A Pellico |
PIP
|
08 May 2013 |
4365-v1 |
PIP Vacuum Upgrades and Future Plans |
David Augustine |
Booster
PIP
|
08 May 2013 |
4353-v1 |
PIP General Info |
William A Pellico |
PIP
|
24 Apr 2013 |
4352-v1 |
PIP Budget/Schedule Status |
Ken Domann |
PIP
|
24 Apr 2013 |
4337-v1 |
Booster ORM status |
Eliana Gianfelice-Wendt |
Beam Dynamics
PIP
|
10 Apr 2013 |
4336-v1 |
PIP General Info |
William A Pellico |
PIP
|
10 Apr 2013 |
4335-v1 |
Booster Transition Crossing |
Yuri Alexahin |
Booster
Beam Dynamics
PIP
|
03 Apr 2013 |
4334-v1 |
Linac Modulator Upgrade |
Trevor A Butler |
PIP
Linac
Upgrades
|
03 Apr 2013 |
4333-v1 |
PIP General Info |
William A Pellico |
PIP
|
03 Apr 2013 |
4330-v1 |
PIP Budget/Schedule Status |
Ken Domann |
PIP
|
02 Apr 2013 |
4325-v1 |
PIP General Info |
Robert M Zwaska |
PIP
|
27 Mar 2013 |
4312-v1 |
Booster Ferrite Bias Supply Upgrade |
Patrick G. Sheahan |
Booster
Upgrades
PIP
HLRF
|
13 Mar 2013 |
4311-v1 |
PIP General Info |
William A Pellico |
PIP
|
13 Mar 2013 |
4308-v1 |
Linac BPM Status Update |
Elliott S McCrory |
BPM
Beam Instrumentation
Console Applications
PIP
Beam Instrumentation
|
06 Mar 2013 |
4307-v1 |
PIP General Info |
William A Pellico |
PIP
|
06 Mar 2013 |
4304-v1 |
Update of Booster Alignment & Magnet Moves |
Kiyomi Seiya |
Booster
Beam Dynamics
PIP
|
25 Feb 2013 |
4302-v1 |
PIP General Info |
William A Pellico |
PIP
|
25 Feb 2013 |
4301-v1 |
Booster Beam Notching Installation Update |
Salah Chaurize |
Booster
Beam Dynamics
Upgrades
PIP
|
25 Feb 2013 |
4293-v1 |
Status of Low-Energy Linac Lattice Update |
Valery Kapin |
Beam Dynamics
PIP
|
13 Feb 2013 |
4292-v1 |
PIP General Info |
William A Pellico |
PIP
|
13 Feb 2013 |
4282-v1 |
Design of Booster Transverse Damper |
Timofey Zolkin |
Booster
Beam Dynamics
Upgrades
PIP
|
30 Jan 2013 |
4281-v1 |
Design of the Booster transverse damper. |
Timofey Zolkin |
Beam Dynamics
PIP
|
30 Jan 2013 |
4280-v1 |
PIP Budget/Schedule Status |
Ken Domann |
PIP
|
30 Jan 2013 |
4278-v1 |
PIP - General Info |
Robert M Zwaska |
PIP
|
30 Jan 2013 |
4274-v1 |
Simulation of Booster Transverse Instabilities |
Alexandru Macridin |
Booster
Beam Dynamics
PIP
|
16 Jan 2013 |
4273-v1 |
PIP General Info |
William A Pellico |
PIP
|
16 Jan 2013 |
4270-v1 |
PIP General Info |
William A Pellico |
PIP
|
10 Jan 2013 |
4267-v2 |
BOOSTER NOTCH ABSORBER ASSEMBLY |
Vladimir Sidorov |
Booster
PIP
|
10 Jan 2013 |
4268-v1 |
Final Update - 2012 Booster LCW Improvement Plan |
David Hixson |
Upgrades
PIP
|
09 Jan 2013 |
4266-v1 |
Refurbished Booster RF |
John S Reid |
Booster
Upgrades
PIP
HLRF
|
21 Dec 2012 |
4263-v1 |
PIP Budget/Schedule Status |
Ken Domann |
PIP
|
21 Dec 2012 |
4265-v1 |
PIP General Info |
William A Pellico |
PIP
|
21 Dec 2012 |
4262-v1 |
Linac Low Energy Modulators Status Update |
Howard Pfeffer |
HLRF
PIP
|
19 Dec 2012 |
4261-v1 |
PIP Booster Start-up Schedule |
Todd Sullivan |
PIP
|
12 Dec 2012 |
4259-v1 |
PIP General Info |
William A Pellico |
PIP
|
10 Dec 2012 |
4258-v4 |
Longitudinal Dynamics Studies for Proton Improvement Plan (PIP) at Fermilab |
Leonid Vorobiev |
Beam Dynamics
Longitudinal Dynamics
PIP
|
06 Dec 2012 |
4232-v2 |
Linac BPM upgrade 805MHz phase signal system |
Elliott S McCrory |
BPM
Beam Instrumentation
PIP
|
06 Dec 2012 |
4257-v2 |
PIP -- Status of RFQ Injector |
Cheng-Yang Tan |
PIP
|
05 Dec 2012 |
4256-v3 |
PIP - Linac Startup Plan |
Fernanda G Garcia |
Operations
PIP
Linac
|
05 Dec 2012 |
4254-v1 |
PIP-University Collaboration |
Robert M Zwaska |
PIP
|
28 Nov 2012 |
4255-v1 |
PIP Budget/Schedule Status |
Ken Domann |
PIP
|
28 Nov 2012 |
4253-v1 |
PIP Update |
William A Pellico |
PIP
|
28 Nov 2012 |
4251-v2 |
RFQ Linac Matching. Numerical optimization. |
Leonid Vorobiev |
Beam Dynamics
Transverse Dynamics
PIP
|
27 Nov 2012 |
4252-v2 |
Space Charge Templates for 3D beam simulation. |
Leonid Vorobiev |
PIP
Antiproton Source
Multiparticle
|
27 Nov 2012 |
4246-v1 |
Project Status Update |
Ken Domann et al. |
Projects
Projects
PIP
|
09 Nov 2012 |
4245-v1 |
PIP - General Info |
William A Pellico et al. |
PIP
|
09 Nov 2012 |
4242-v1 |
PIP Update TalkBooster Notched Beam Kicker Pulser General Talk |
Salah Chaurize |
Booster
PIP
|
24 Oct 2012 |
4241-v1 |
Refurbished Booster RF |
John S Reid |
PIP
HLRF
|
24 Oct 2012 |
4240-v1 |
PIP - General Info |
William A Pellico et al. |
Booster
PIP
Linac
|
24 Oct 2012 |
4239-v1 |
PIP - General Info |
William A Pellico |
PIP
|
11 Oct 2012 |
4237-v2 |
Linac Laser Notcher Status |
David E. Johnson et al. |
PIP
|
08 Oct 2012 |
4236-v1 |
Proton Improvement Plan - S&T Review |
William A Pellico |
Booster
PIP
Linac
|
04 Oct 2012 |
4234-v1 |
PIP General Info |
William A Pellico |
PIP
|
03 Oct 2012 |
4231-v1 |
PIP Budget/Schedule Status |
Ken Domann |
PIP
|
27 Sep 2012 |
4230-v1 |
PIP General Info |
William A Pellico |
PIP
|
27 Sep 2012 |
4229-v2 |
Progress Update - 2012 Booster LCW Improvement Plan |
David Hixson |
Operations
Upgrades
PIP
|
26 Sep 2012 |
4228-v1 |
Linac MCC/Transformer, Hatch, Booster Transformers, Anode Supply |
Ryan Crawford |
Booster
Upgrades
PIP
Linac
Upgrades
|
25 Sep 2012 |
4223-v1 |
PIP - General Info |
William A Pellico |
PIP
|
19 Sep 2012 |
4220-v1 |
9/19/2012 PIP meeting Source talk |
Dan Bollinger |
Pre-Accelerator
PIP
|
19 Sep 2012 |
4221-v1 |
Booster Notch Absorber Update |
Vladimir Sidorov |
Booster
PIP
|
19 Sep 2012 |
4217-v1 |
Proton Improvement Plan RFQ Platfrom Update |
Salah Chaurize |
PIP
|
13 Sep 2012 |
4214-v1 |
PIP General Info |
William A Pellico |
PIP
|
12 Sep 2012 |
4210-v1 |
RFQ PA Systems |
Brian Schupbach |
Pre-Accelerator
PIP
Upgrades
|
30 Aug 2012 |
4209-v1 |
BoosterL12/Noker-L13/Absorber Update |
Salah Chaurize |
Booster
Upgrades
PIP
|
30 Aug 2012 |
4207-v1 |
PIP General Info |
William A Pellico |
PIP
|
29 Aug 2012 |
4205-v2 |
PIP - RFQ Injector Installation Overview |
Cheng-Yang Tan |
PIP
|
29 Aug 2012 |
4204-v1 |
PIP General Info |
William A Pellico |
PIP
|
22 Aug 2012 |
4200-v1 |
PIP General Info |
William A Pellico |
PIP
|
21 Aug 2012 |
4199-v1 |
Booster Turbo Manifold Design Analysis |
David Augustine |
Booster
Upgrades
PIP
Vacuum
|
21 Aug 2012 |
4198-v1 |
Booster Cogging Teststand Progress -- PIP Presentation |
Craig C Drennan et al. |
Upgrades
PIP
LLRF
|
20 Aug 2012 |
4197-v1 |
New Ferrite Testing for Booster Tuners |
Dennis Barak et al. |
PIP
HLRF
|
15 Aug 2012 |
4195-v1 |
Linac Substation L1 & Booster Substation Y-BE2 --- Update #3 |
Ryan Crawford |
Booster
Upgrades
PIP
Linac
Upgrades
|
15 Aug 2012 |
4193-v1 |
PIP - General Info |
William A Pellico |
PIP
|
09 Aug 2012 |
4192-v1 |
Linac 400 MeV BPM Status |
Nathan Eddy |
Beam Instrumentation
PIP
|
08 Aug 2012 |
4183-v1 |
PIP - General Info |
William A Pellico |
PIP
|
26 Jul 2012 |
4182-v1 |
PIP - General Info |
William A Pellico et al. |
Upgrades
PIP
|
19 Jul 2012 |
4181-v1 |
PIP - General Info |
William A Pellico |
PIP
|
18 Jul 2012 |
4180-v1 |
Second Refurbished Booster RF Cavity for 15Hz |
John S Reid |
PIP
HLRF
|
18 Jul 2012 |
4179-v1 |
Booster Bias Supply & Test Stand |
Patrick G. Sheahan |
Power Supplies
PIP
HLRF
|
18 Jul 2012 |
4177-v1 |
PIP - RFQ Repair and Installation Plans |
Cheng-Yang Tan |
PIP
|
11 Jul 2012 |
4168-v1 |
PIP - General Info |
Robert M Zwaska |
Booster
PIP
Linac
|
27 Jun 2012 |
4167-v2 |
PIP - Linac: Substation L1 & MCC Upgrade |
Ryan Crawford |
PIP
Linac
|
27 Jun 2012 |
4166-v1 |
Laser Notcher Status |
David E. Johnson |
Projects
PIP
|
27 Jun 2012 |
4164-v1 |
PIP - General Info |
Salah Chaurize et al. |
Booster
Upgrades
PIP
|
20 Jun 2012 |
4156-v1 |
PIP - General Info |
William A Pellico |
PIP
|
12 Jun 2012 |
4140-v1 |
PIP - General Info and Shutdown 2012 Activities Status Report |
William A Pellico et al. |
PIP
|
30 May 2012 |
4135-v1 |
PIP - General Info |
William A Pellico |
PIP
|
24 May 2012 |
4113-v1 |
PIP - General Info and Shutdown 2012 Schedule - First 2 weeks |
William A Pellico |
PIP
|
19 Apr 2012 |
4111-v1 |
PIP - General Info |
William A Pellico |
PIP
|
13 Apr 2012 |
4106-v1 |
L13 Notched Beam Absorber Update |
Salah Chaurize |
Booster
Operations
Upgrades
PIP
|
05 Apr 2012 |
4105-v1 |
PIP - General Info |
William A Pellico |
PIP
|
04 Apr 2012 |
4104-v1 |
PIP - General Info |
William A Pellico |
PIP
|
29 Mar 2012 |
4103-v1 |
PIP Presentation on Booster Main Injector Phase Lock |
Craig C Drennan |
PIP
LLRF
|
28 Mar 2012 |
4100-v1 |
PIP - General Info |
William A Pellico |
PIP
|
23 Mar 2012 |
4081-v4 |
Booster Nocthing and Absorber Review |
Salah Chaurize et al. |
Booster
PIP
|
21 Mar 2012 |
4097-v1 |
PIP - Linac: 200MHz Modulator Upgrade - Status Report |
Trevor A Butler |
PIP
Linac
Upgrades
|
21 Mar 2012 |
4096-v1 |
PIP - Linac: Substation L1 & MCC Upgrade |
Ryan Crawford |
PIP
Linac
Upgrades
|
20 Mar 2012 |
4089-v1 |
Calibration of Booster BPMs using IPM, and measurement of quad center relative to BPMs |
Meghan J McAteer |
Booster
PIP
Alignment
|
14 Mar 2012 |
4088-v1 |
PIP - General Info |
William A Pellico |
PIP
|
14 Mar 2012 |
4084-v1 |
First Refurbished Booster RF Cavity for 15Hz |
John S Reid |
Booster
PIP
HLRF
|
07 Mar 2012 |
4083-v1 |
PIP - General Info |
William A Pellico et al. |
Booster
PIP
Linac
|
07 Mar 2012 |
4082-v1 |
PIP - Booster RF Tuner and cavity Refurbishment |
Matt Slabaugh |
Booster
PIP
HLRF
|
07 Mar 2012 |
4079-v1 |
Update of Booster Alignment & Magnet Moves |
Kiyomi Seiya |
PIP
Alignment
|
29 Feb 2012 |
4078-v1 |
PIP - General Info |
William A Pellico |
PIP
|
29 Feb 2012 |
4068-v1 |
Booster SS Driver Upgrade Update |
Tom N Kubicki |
Booster
Upgrades
PIP
|
09 Feb 2012 |
4067-v1 |
PIP Schedule Summary |
Elmie Peoples |
PIP
|
09 Feb 2012 |
4065-v1 |
PIP - General Info |
William A Pellico |
PIP
|
09 Feb 2012 |
4066-v1 |
PIP - General Info |
William A Pellico |
PIP
|
09 Feb 2012 |
4062-v1 |
Beam to Muon g-2 and Mu2e Experiments from Recycler |
Milorad B. Popovic |
Booster
PIP
Recycler
Linac
|
03 Feb 2012 |
4060-v2 |
Booster 150 KW Power Amplifier |
Steve Kotz |
Booster
PIP
HLRF
|
01 Feb 2012 |
4058-v1 |
PIP - General Info |
William A Pellico |
PIP
|
31 Jan 2012 |
4057-v1 |
PIP - General Info |
William A Pellico |
PIP
|
31 Jan 2012 |
4050-v1 |
Progress in the RF/Thermal Modeling Effort of the Booster Cavity |
Mohamed H Hassan |
PIP
HLRF
|
18 Jan 2012 |
4049-v1 |
Booster Bias Supply Upgrade |
Patrick G. Sheahan |
PIP
HLRF
|
18 Jan 2012 |
4042-v3 |
Status of Linac Lattice Study |
H.J Kim |
Beam Physics
PIP
Linac
|
11 Jan 2012 |
4041-v1 |
PIP - General Info |
William A Pellico |
PIP
|
11 Jan 2012 |
4040-v1 |
Booster Notching Absorber Design |
Vladimir Sidorov |
Booster
PIP
|
10 Jan 2012 |
4038-v1 |
Fermilab Booster Model Calibration |
Alexey Petrenko |
Booster
PIP
|
10 Jan 2012 |
4037-v1 |
Proton Improvement Plan: View from the Directorate (and the DOE) |
Stuart Henderson |
PIP
|
09 Jan 2012 |
4036-v1 |
PIP - General Info |
William A Pellico |
PIP
|
09 Jan 2012 |
4032-v1 |
PIP - General Info |
William A Pellico |
PIP
|
03 Jan 2012 |
4031-v1 |
PIP - General Info |
William A Pellico |
PIP
|
03 Jan 2012 |
4028-v2 |
Booster Digital Damper Status & Plans |
Nathan Eddy |
PIP
Beam Instrumentation
|
21 Dec 2011 |
4029-v2 |
Proposal for Booster notching improvement |
Alexandr Drozhdin et al. |
PIP
|
21 Dec 2011 |
4018-v1 |
PIP - General Info |
William A Pellico |
PIP
|
07 Dec 2011 |
4017-v1 |
PIP - General Info |
William A Pellico |
PIP
|
07 Dec 2011 |
4016-v1 |
Booster Bias Supply Upgrade |
Patrick G. Sheahan |
PIP
|
07 Dec 2011 |
4008-v1 |
PIP - General Info |
William A Pellico |
PIP
|
28 Nov 2011 |
4007-v3 |
Linac L1 Substation Upgrade |
Steven L. Hays |
PIP
Upgrades
|
23 Nov 2011 |
4006-v1 |
Orbit response matrix measurements and model calibration for the Fermilab Booster |
Alexey Petrenko |
Booster
PIP
|
23 Nov 2011 |
4004-v2 |
New Ferrite Cores for Booster RF Cavity Tuners |
Ralph Pasquinelli |
PIP
|
23 Nov 2011 |
3999-v1 |
Booster Bias Supply and Cavity Upgrade |
Patrick G. Sheahan |
PIP
|
17 Nov 2011 |
3998-v1 |
PIP General Info |
William A Pellico |
PIP
|
17 Nov 2011 |
3996-v2 |
Booster Laser Notcher Proposal |
David E. Johnson et al. |
PIP
|
16 Nov 2011 |
3993-v1 |
Booster Alignment & Magnet Moves |
Kiyomi Seiya |
PIP
Alignment
|
09 Nov 2011 |
3992-v1 |
Optice Measurements in the Booster |
Meghan J McAteer |
Beam Dynamics
PIP
|
09 Nov 2011 |
3989-v2 |
Booster Linear Coupling Measurement and comparison with MAD8 |
Yuri Alexahin et al. |
Studies
PIP
|
09 Nov 2011 |
3986-v1 |
PIP - The H- Injector Upgrade |
Cheng-Yang Tan |
PIP
|
02 Nov 2011 |
3985-v1 |
PIP - Linac:7835 Procurement Strategy |
Fernanda G Garcia |
Operations
Projects
PIP
Linac
Upgrades
|
02 Nov 2011 |
3979-v1 |
Linac RF Modulators New Specifications |
Trevor A Butler |
PIP
Linac
|
01 Nov 2011 |
3976-v1 |
PIP Budget Codes Budget FY12 Updates |
William A Pellico et al. |
PIP
|
25 Oct 2011 |
3952-v1 |
Spare cavity status and tuner update |
Matt Slabaugh |
Booster
PIP
|
28 Sep 2011 |
3947-v1 |
Booster Laser Notcher Options |
David E. Johnson |
Upgrades
PIP
|
20 Sep 2011 |
3946-v1 |
Laser Notcher for Booster |
David E. Johnson |
PIP
|
19 Sep 2011 |
3936-v1 |
Linac/400 MeV BPM System Plans and Status |
Nathan Eddy |
BPM
BPM
PIP
Upgrades
|
07 Sep 2011 |
3935-v2 |
Proton Source Vacuum Plan |
David Augustine |
Booster
PIP
Vacuum
Linac
Vacuum
|
02 Sep 2011 |
3932-v1 |
Linac Momentum Dump Vacuum Repair - Final Design 2011 |
Robert E Reilly |
PIP
Other
Vacuum
Linac
|
31 Aug 2011 |
3931-v1 |
Status Report on the Installation of Solid State Conversions for Booster Stations 1 & 2 |
Steve Kotz |
Booster
PIP
HLRF
|
31 Aug 2011 |
3930-v1 |
2012 Booster LCW Improvement Plan Overview |
David Hixson |
Booster
Operations
Upgrades
Projects
PIP
|
29 Aug 2011 |
3926-v1 |
Proton Improvement Plan -- Preliminary Overview of FY12 |
Bob Webber |
Booster
PIP
Linac
|
24 Aug 2011 |
3921-v1 |
Initial Simulations of Performance Limitations of the Booster RF Cavity |
Mohamed H Hassan |
Booster
HLRF
PIP
Electromagnetic Calculations
LLRF
|
10 Aug 2011 |
3920-v1 |
PIP- Booster RF -- Spare Cavity Status |
Matt Slabaugh |
Booster
PIP
HLRF
|
10 Aug 2011 |
3911-v1 |
TD Cost Estimate for Booster Tuners |
Thomas J Gardner |
Booster
PIP
HLRF
|
02 Aug 2011 |
3912-v1 |
Booster Modulator Upgrades |
Rene Padilla |
Booster
PIP
HLRF
|
02 Aug 2011 |
3913-v1 |
Booster Solid State Driver Upgrade |
Tom N Kubicki |
Booster
PIP
HLRF
|
02 Aug 2011 |