Document List by Topic

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

These documents on Muon and sub-topics are available:
Showing documents with topic Muon on the most recent version. See documents with Muon on any version.
(List events on Muon)

Beams-doc-# Title Author(s) Topic(s) Last Updated
8347-v1 Test-Driven Development and Behavior-Driven Development in AD/Instrumentation John Diamond Muon
Instrumentation
Mu2e
Controls
28 Apr 2020
7950-v1 2e13 PoT Simulations of AP0 and M2M3 Beamline Using G4Beamline (Sep-2019) Eremey V Valetov Muon
Beam Physics
Target Station
Transfer Lines
Mu2e
g-2
27 Mar 2020
7849-v1 Accelerator R&D Oportunities at Fermilab Vladimir Shiltsev Main Ring
Muon
Beam Physics
Upgrades
Booster
Recycler
Technology
04 Dec 2019
4376-v14 Cryo AIP Project Plan Arkiday Klebaner et al. Projects
07 Mar 2019
5061-v7 Structural Support Design Guidelines Christine R. Ader et al. Magnets
Muon
Magnets
Alignment
Alignment
Alignment
Design Properties
Magnets
Magnets
Magnets
16 Jan 2019
6832-v5 g-2 Operational Experience Compared to Technical Design Report Jerry Annala et al. Muon
13 Dec 2018
6522-v1 LLRF System for the Fermilab Muon g-2 and the Mu2e Experiments Philip Varghese Muon
Recycler
17 Jul 2018
6037-v1 g-2 Ring Injection Kicker Step Response Dennis Barak et al. g-2
19 Jan 2018
4434-v15 Delivery Ring AIP Project Plan Jerry Annala Muon
17 Aug 2017
4319-v59 Muon Cryogenics AIP Schedule Ken Domann Projects
04 Aug 2017
5364-v2 Prospects for a Muon Spin Resonance Facility in the MuCool Test Area John A. Johnstone Muon
External Beams
Linac
17 Apr 2017
4368-v10 Recycler 2.5 MHz RF Project Plan Ioanis Kourbanis Projects
23 May 2016
5148-v1 Comments on Proton Beams for REDTOP Michael J. Syphers Muon
External Beams
02 May 2016
4433-v15 Beam Transport AIP Project Plan Ioanis Kourbanis Muon
Recycler
Transfer Lines
06 Apr 2016
5128-v1 Delivery Ring AIP Review Report Consolato Gattuso et al. Projects
31 Mar 2016
4427-v11 Muon Campus Interface Milestones Mary Convery Muon
21 Jan 2016
4898-v1 Concepts for efficient production, transport and cooling of intense muon beams Diktys Stratakis Muon
Projects
Accelerator Seminar
Mu2e
g-2
28 Jul 2015
4854-v7 Modified Running Scenarios for the g-2 and Mu2e Experiments Phil Adamson et al. Mu2e
g-2
18 Jun 2015
4716-v1 The Fermilab Muon Campus - The Experiments, Projects, and Status Steve Werkema Muon
Accelerator Seminar
Projects
Mu2e
g-2
25 Nov 2014
4682-v1 Muon Campus Cryogenics Interface Document Mary Convery Muon
10 Oct 2014
4681-v1 Muon Campus Beamline Enclosure Interface Control Document Mary Convery et al. Muon
10 Oct 2014
4679-v1 Total Loss Monitor Radiation Safety System Anthony F. Leveling Muon
Accelerator Seminar
Booster
08 Oct 2014
4668-v1 Ionization Cooling for Muon Experiments Yuri Alexahin et al. Muon
16 Sep 2014
4248-v3 Muon Campus Cryogenic Requirements Arkiday Klebaner Muon
Mu2e
g-2
29 Jun 2014
4493-v1 Ultra High Input Impedance Electrometer/Pulse Train Converter For the Measurement of Beam Losses Dan Schoo Mu2e
04 Dec 2013
4469-v1 MC Infrastructure GPP Project Plan Tom Lackowski Muon
22 Oct 2013
4379-v1 Muon Campus Beam Line GPP Project Plan Tom Lackowski Muon
Projects
Mu2e
g-2
21 Oct 2013
4432-v1 Muon Campus Program Plan Russ Alber et al. Muon
23 Aug 2013
4407-v1 Recycler RF AIP Requirements Ioanis Kourbanis Muon
Projects
Recycler
11 Jul 2013
4408-v1 Beam Transport AIP Requirements Ioanis Kourbanis Muon
Projects
Recycler
11 Jul 2013
4409-v1 Delivery Ring AIP Requirements Jerry Annala Muon
Projects
11 Jul 2013
4150-v2 BoE MuAIP 02.03: Beam Line Instrumentation Brian E. Drendel Projects
12 Jun 2012
4149-v1 BoE MuAIP 03.04: Delivery Ring Abort System Brian E. Drendel Projects
12 Jun 2012
4299-v1 Muon Campus Projects Overview Mary Convery Muon
21 Feb 2013
4295-v1 Local Longitudinal Microwave Instability Limits During Bunch Rotation Kingyuen B. Ng Muon
Muon Collider R&D
18 Feb 2013
4296-v1 Space-Charge Effects on Beam Rotation at the Compressor Ring Kingyuen B. Ng Muon
Muon Collider R&D
18 Feb 2013
4271-v1 Muon Campus Plans Mary Convery Muon
Projects
Mu2e
g-2
10 Jan 2013
4151-v1 BoE MuAIP 03.05: Delivery Ring Instrumentation Brian E. Drendel Projects
12 Jun 2012

Number of documents found: 38

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.8.9, contact Beams Document Database Administrators
Execution time: 8 wallclock secs ( 1.11 usr + 0.35 sys = 1.46 CPU)