These documents on Accelerator Division Safety Procedures (subtopic of ESH) are available:
Showing documents with topic Accelerator Division Safety Procedures on the most recent version. See documents with ADSP on any version.

Beams-doc-# Title Author(s) Topic(s) Last Updated
8762-v2 ADSP-05-1212 Booster Gradient Power Supply Bus System Lockout/Tagout Procedure Joe Compton ADSP
06 Apr 2021
8765-v1 ADSP-05-1214 Kautz Road Substation MOS 86, 87, & 89 Lockout Joe Compton ADSP
29 Oct 2020
8834-v1 ADSP-10-0202 Control & Release of Radioactive Materials from Radiological Areas to Controlled Areas Gary L Lauten ADSP
28 Oct 2020
8831-v1 ADSP-10-0201 Radioactive Waste Disposal Procedure Tony Busch et al. ADSP
28 Oct 2020
8828-v1 ADSP-10-0104 Movable Shielding Inventory Wayne Schmitt ADSP
28 Oct 2020
8825-v1 ADSP-10-0103 Radiation Interlock Modification Procedure Gary L Lauten ADSP
28 Oct 2020
8822-v1 ADSP-10-0102 Non-Interlocked Beam Enclosure Equipment Access Hatch Administrative Control Lockout Gary L Lauten ADSP
28 Oct 2020
8819-v1 ADSP-10-0101 Radiation Detector Change Procedure Dale White ADSP
28 Oct 2020
8816-v1 ADSP-10-0003 Safety System Interlock Request Procedure John E Anderson ADSP
28 Oct 2020
8813-v1 ADSP-10-0002 Safety System Interlock Bypass Procedure Randy M Zifko ADSP
28 Oct 2020
8810-v1 ADSP-10-0001 Radiation & Electrical Safety System Testing Requirements Randy M Zifko ADSP
28 Oct 2020
8807-v1 ADSP-08-0601 ES&H Review of Procurement Actions and Other Proposed Activities Eric D McHugh ADSP
28 Oct 2020
8804-v1 ADSP-08-0501 Air Emissions Source Program Sylvia Wilson ADSP
28 Oct 2020
8801-v1 ADSP-08-0401 Management of Polychlorinated Biphenyls (PCB's) Sylvia Wilson ADSP
28 Oct 2020
8798-v1 ADSP-08-0301 Identifying & Inspecting Potential Spill Sources Sylvia Wilson ADSP
28 Oct 2020
8795-v1 ADSP-08-0203 Waste Effluent Discharge Identification Procedure Sylvia Wilson ADSP
28 Oct 2020
8792-v1 ADSP-08-0202 Regulated Waste Management Procedures Sylvia Wilson ADSP
28 Oct 2020
8789-v1 ADSP-05-1222 M4 Enclosure 480 Volt Lockout/Tagout Procedure Joe Compton ADSP
28 Oct 2020
8786-v1 ADSP-05-1221 Extraction Enclosure including the Extraction Stub 480 VAC Lockout/Tagout Procedure Joe Compton ADSP
28 Oct 2020
8783-v1 ADSP-05-1220 Delivery Ring 13.8 kVAC and 480 VAC Lockout/Tagout Procedure Joe Compton ADSP
28 Oct 2020
8780-v1 ADSP-05-1219 Transport 480 Volt Lockout/Tagout Procedure Joe Compton ADSP
28 Oct 2020
8777-v1 ADSP-05-1218 Pre-Target/Pre-Vault 480 Volt Lockout/Tagout Procedure Joe Compton ADSP
28 Oct 2020
8774-v1 ADSP-05-1217 NuMI MI-65 13.8KVAC Lockout/Tagout Procedure Joe Compton ADSP
28 Oct 2020
8771-v1 ADSP-05-1216 MiniBooNE MI12A and MI12B 480 Volt Lockout/Tagout Procedure Mark Obrycki ADSP
28 Oct 2020
8768-v1 ADSP-05-1215 HP3DS and QP3 13.8 KV Lockout/Tagout Procedure Joe Compton ADSP
28 Oct 2020
8759-v1 ADSP-05-1210 Main Injector F-sector & Transfer Hall Exposed Bus Lockout/Tagout Procedure Joe Compton ADSP
28 Oct 2020
8756-v1 ADSP-05-0510 Accelerator Division Hazard Communication Program Sylvia Wilson ADSP
28 Oct 2020
8753-v1 ADSP-05-0400 Electrical Safety John E Anderson ADSP
28 Oct 2020
8750-v1 ADSP-02-0401 Accelerator Division Emergency Response Plan John E Anderson ADSP
28 Oct 2020
8747-v1 ADSP-02-0110 Outline for Performing Shielding Assessments Wayne Schmitt ADSP
28 Oct 2020
8744-v1 ADSP-02-0102 Response to Excursions above the Accelerator Operating Limits John E Anderson ADSP
28 Oct 2020
8741-v1 ADSP-01-0401 Accelerator Division ESH Self Assessment Program Raymond H Lewis ADSP
28 Oct 2020
8738-v1 ADSP-01-0001 Accelerator Division Two-Person Rule Policy Eric D McHugh ADSP
28 Oct 2020
8666-v2 ADSP-02-0101 Response to Violations of the Accelerator Safety Envelope Maddie Wolter ADSP
ESH
15 Sep 2020
4980-v2 ADSP-00-0001 Accelerator Division ES&H Procedure Numbering System Raymond H Lewis ADSP
13 Oct 2015

Number of documents found: 35

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.8.10, contact Beams Document Database Administrators
Execution time: 1 wallclock secs ( 0.17 usr + 0.02 sys = 0.19 CPU)