468-v4 |
Notes for MI/RR Group Meeting of 19 Feb 2003 |
Bruce C. Brown |
RF
Beam Dynamics
Beam Instrumentation
Transfer Lines
MI-RR-Group
Studies
|
23 Apr 2020 |
307-v2 |
Shielding Assessment of F0 to Switchyard Beam Line Enclosure for MI 120 GeV Beam Transport |
Chandrashekhara M. Bhat |
Beam Dynamics
ES&H
Transfer Lines
|
28 Feb 2020 |
50-v2 |
Estimates of Skew Quad Strengths and Locations for the Main Injector |
Peter Bagley et al. |
Lattice
Transverse Dynamics
Alignment
Beam Dynamics
Magnets
|
12 Feb 2020 |
13-v1 |
gamma_t Jump Schemes |
Stephen G. Peggs |
RF
Lattice
Beam Dynamics
|
07 Feb 2020 |
12-v1 |
MI-Transition Crossing ESME Simulation |
S. Alex Bogacz |
RF
Beam Dynamics
|
07 Feb 2020 |
339-v2 |
Stripline Detectors for Fermilab Main Injector |
James L. Crisp et al. |
Beam Instrumentation
Beam Dynamics
|
26 Sep 2019 |
7184-v1 |
RCS for Multi-MW Main Injector |
Jeffrey Eldred |
Accelerator Seminar
Beam Dynamics
Beam Physics
Future Accelerators
|
28 Jun 2019 |
4340-v2 |
Accuracy and Performance Upgrade of PIC and Hybrid Space-Charge Solvers |
Leonid Vorobiev |
Beam Dynamics
Beam Dynamics
Beam Dynamics
Multiparticle
|
12 Nov 2013 |
3991-v1 |
Proposal to Create a Tomoscope Application for the Fermilab Main Injector |
Jerry Cai et al. |
Beam Instrumentation
Beam Dynamics
Controls
Operations
|
09 Nov 2011 |
3756-v1 |
POSINST Simulations and Problems |
Xiaolong Zhang |
Beam Dynamics
Beam Physics
|
16 Dec 2010 |
3526-v1 |
The SEY Test Stand |
Robert M Zwaska |
Project X
Instabilities
Beam Dynamics
|
17 Dec 2009 |
3458-v1 |
Some Initial ECloud Measurements |
Robert M Zwaska |
Instabilities
Beam Dynamics
|
25 Sep 2009 |
2199-v1 |
Painting injection at 8~GeV to the Main Injector |
Alexandr Drozhdin |
Project
Beam Dynamics
|
02 Jun 2008 |
2200-v1 |
Painting injection at 8~GeV to the Main Injector |
Alexandr Drozhdin |
Project
Beam Dynamics
|
02 Jun 2008 |
2591-v1 |
Fourier Analysis of MI TBT data |
Eliana Gianfelice-Wendt |
Beam Dynamics
|
10 Oct 2007 |
2810-v1 |
On possibility to compensate space charge effects by controlled electron columns |
Vladimir Shiltsev |
Transverse Dynamics
Beam Dynamics
Beam Dynamics
Beam Dynamics
SNuMi
|
13 Jun 2007 |
2579-v1 |
Electron Cloud Instabilities |
Robert M Zwaska |
Instabilities
Beam Dynamics
Proton Driver
SNuMi
|
06 Dec 2006 |
2337-v1 |
Electron Cloud Studies at Tevatron and Main Injector |
Xiaolong Zhang |
Instabilities
Beam Dynamics
Vacuum
SNuMi
Talks
|
10 Jul 2006 |
2263-v2 |
Proposal of Studying Electron Cloud and It's Mitigation for Tevatron and Main Injector Upgrades |
Xiaolong Zhang |
Studies
Beam Dynamics
SNuMi
Vacuum
|
13 Jun 2006 |
2278-v1 |
Electron Cloud Measurements in the Fermilab Main Injector |
Robert M Zwaska |
Instabilities
Beam Dynamics
|
25 May 2006 |
2275-v1 |
Simulation of longitudinal coupled bunch instability in the Main Injector driven by parasitic high order cavity mode |
Vincent Wu |
Studies
Beam Dynamics
|
22 May 2006 |
2226-v1 |
Proton Stacking in the Recycler |
Chandrashekhara M. Bhat |
Beam Dynamics
Beam Dynamics
SNuMi
|
17 Apr 2006 |
2209-v1 |
APPLICATIONS OF BARRIER BUCKET RF SYSTEMS AT FERMILAB |
Chandrashekhara M. Bhat |
Beam Dynamics
Electromagnetic Calculations
Beam Dynamics
|
15 Mar 2006 |
2208-v1 |
Bunch compression and stretching using barrier rf system |
Chandrashekhara M. Bhat |
Longitudinal Dynamics
Beam Dynamics
Beam Dynamics
|
15 Mar 2006 |
2173-v2 |
Innovative Beam Physics for High Luminosity at Hadron Colliders |
Chandrashekhara M. Bhat |
Longitudinal Dynamics
Beam Dynamics
Beam Studies
Accumulator
Beam Dynamics
|
26 Feb 2006 |
2034-v2 |
Recycling pbars in the Main Injector- Issues |
Chandrashekhara M. Bhat |
Beam Dynamics
|
01 Dec 2005 |
841-v7 |
Pbar acceleration in MI using 2.5 MHz and 53 MHz rf Systems |
Chandrashekhara M. Bhat et al. |
RF
Studies
Longitudinal Dynamics
Beam Dynamics
HLRF
Controls
LLRF
HLRF
|
07 Nov 2005 |
1980-v1 |
Phase Space and Antiproton Production at Fermilab |
Dave McGinnis |
Beam Dynamics
Beam Dynamics
Accumulator
Beam Dynamics
Debuncher
|
04 Oct 2005 |
1850-v1 |
A NEW TECHNIQUE FOR MAKING BRIGHT PROTON BUNCHES USING BARRIER RF SYSTEMS |
Chandrashekhara M. Bhat |
Longitudinal Dynamics
Beam Dynamics
|
31 May 2005 |
1744-v3 |
A New Scheme for Producing Bright Proton Bunches in MI for Tevatron Shots |
Chandrashekhara M. Bhat |
Beam Dynamics
Run II
|
18 Mar 2005 |
1442-v1 |
Novel Beam Manipulation Techniques for Fermilab Run II and Beyond |
Chandrashekhara M. Bhat |
Beam Dynamics
Beam Dynamics
|
11 Nov 2004 |
1401-v1 |
Schemes for Producing High Intensity Low- Longitudinal Emittance Proton Bunches for the Tevatron Collider Shots |
Chandrashekhara M. Bhat |
Beam Dynamics
MI-Dept
|
09 Oct 2004 |
1395-v4 |
Schemes for Producing High Intensity Low-longitudinal Emittance Proton Bunches for the Tevatron Collider |
Chandrashekhara M. Bhat |
Beam Dynamics
|
09 Oct 2004 |
762-v8 |
Simulation of Main Injector 2.5 MHz Pbar Acceleration with Space Charge and Beam Loading Effects |
Vincent Wu |
Beam Dynamics
|
15 Dec 2003 |
107-v1 |
gamma_t Jump Design Considerations for the Fermilab Main Injector |
Stephen D. Holmes |
Beam Dynamics
Design Properties
|
14 Aug 2003 |
43-v1 |
Comments on the Behavior of alpha_1 in Main Injector gamma_t Jump Schemes |
S. Alex Bogacz et al. |
Beam Dynamics
|
14 Aug 2003 |
33-v1 |
Dynamic Aperture with gamma_t Jump |
Rodney E. Gerig |
Beam Dynamics
|
14 Aug 2003 |
742-v1 |
Proton Deceleration from 150 GeV to 8.9 GeV in the Main Injector: Simulations and Beam Tests |
Chandrashekhara M. Bhat |
Beam Instrumentation
Studies
LLRF
Beam Dynamics
|
25 Jul 2003 |
148-v2 |
AP4 Beam Dump and Allowed Beam Intensity Limit During the Construction Phase of theMI-8 GeV Beam-line |
Chandrashekhara M. Bhat |
Beam Dynamics
ES&H
|
10 Jul 2003 |
45-v1 |
Physical Aperture and Beamline Matching Criteria for the Main Injector |
Stephen D. Holmes et al. |
Lattice
Beam Dynamics
|
30 Jun 2003 |
10-v1 |
Transition Crossing Time Shifts |
Stephen G. Peggs |
Beam Dynamics
|
26 Jun 2003 |
93-v1 |
Beam Loading Effects During Multi-Batch Snap Coalescing |
David W. Wildman |
Beam Dynamics
|
23 Jun 2003 |
77-v1 |
Instrumentation Requirements for the Fermilab Main Injector |
David E. Johnson |
Beam Instrumentation
Beam Dynamics
|
23 Jun 2003 |
631-v1 |
Barrier RF Stacking at Fermilab |
Weiren Chou et al. |
RF
Longitudinal Dynamics
LLRF
Beam Dynamics
Adv. Accelerator R&D
HLRF
|
29 May 2003 |
633-v1 |
A New Antiproton Beam Transfer Scheme without Coalescing |
Weiren Chou et al. |
Studies
Longitudinal Dynamics
LLRF
Beam Dynamics
Beam Transfer
Operations
Multiparticle
|
28 May 2003 |
748-v1 |
Emittance measurement and acceleration Revision of MI-0294 |
Kiyomi Seiya |
Beam Instrumentation
Studies
LLRF
Beam Dynamics
|
10 Apr 2003 |
747-v1 |
Slip Stacking at Low Intensity Status of the Beam Studies |
Kiyomi Seiya |
RF
Beam Instrumentation
Studies
LLRF
Beam Dynamics
|
03 Feb 2003 |
360-v1 |
Notes for MI/RR Group Meeting of 16 Sep 2002 |
Bruce C. Brown |
RF
Beam Dynamics
MI-RR-Group
|
13 Jan 2003 |
284-v4 |
Notes for MI/RR Group Meeting of 23 Dec 2002 |
Bruce C. Brown et al. |
Beam Dynamics
RF
Beam Dynamics
MI-RR-Group
Studies
|
07 Jan 2003 |
744-v1 |
Simulation of Pbar Stacking and Un-Stacking in the Recycler Ring |
Chandrashekhara M. Bhat |
RF
Beam Instrumentation
Studies
Beam Dynamics
|
01 Sep 2002 |
698-v1 |
Proton longitudinal emittance vs proton intensity during MI $2B cycle |
Ioanis Kourbanis et al. |
Beam Dynamics
|
04 Jan 2002 |
352-v1 |
Preparing the Proton Bunches in 2.5 MHz Buckets for MI Tune-up |
Chandrashekhara M. Bhat |
RF
Beam Instrumentation
Beam Dynamics
|
01 Jun 2001 |
356-v1 |
Analysis of the Beam Loss Observed During the October 12, 2000 Main Injector Deceleration Studies |
Gerald P. Jackson |
Studies
Beam Dynamics
|
23 Oct 2000 |
324-v2 |
Specifications for the TE01 Signal Transmission of the Recycler Stochastic Cooling Systems |
Gerald P. Jackson |
Beam Dynamics
Stochastic Cooling
|
04 May 1998 |
308-v1 |
Main Injector Intensity Limitations at Transition |
Chandrashekhara M. Bhat |
Beam Dynamics
Meetings
Tevatron Group
|
29 Sep 1997 |
146-v2 |
Radiation Level in the Intersection Region of AP2 and 8 GeV Beam-line due to Beam Loss in the AP2 Beam-line |
Chandrashekhara M. Bhat et al. |
Beam Dynamics
ES&H
|
23 Aug 1995 |
136-v2 |
µ-Dose Level in the Vicinity of the Intersection of the 8 GeV and the AP2-Beamlines |
Chandrashekhara M. Bhat |
Beam Dynamics
ES&H
|
28 Jun 1995 |
114-v1 |
Evaluation of Beam Coupling Due to the Dipole Current Loop |
Rachid Baiod |
Beam Dynamics
Magnets
|
28 Oct 1994 |
120-v1 |
X-Y Coupling of Betatron Motion from MI Dipole Bus Current |
James A. MacLachlan |
Beam Instrumentation
Beam Dynamics
Magnets
Design Properties
|
25 Oct 1994 |
108-v1 |
Low-Dispersion gt Jump Scheme for the Main Injector |
S. Alex Bogacz et al. |
Beam Dynamics
|
02 May 1994 |
104-v1 |
Impedance and Instability Threshold Estimates in the Main Injector I |
Michael A. Martens et al. |
Instabilities
Beam Dynamics
|
01 Mar 1994 |
100-v1 |
Radiation Levels in the MI-60 Enclosure from Tevatron Beam Losses |
Chandrashekhara M. Bhat |
Beam Dynamics
ES&H
Civil
|
08 Nov 1993 |
99-v1 |
Beam Loading Effects for a Partially Filled MI Ring |
S. Alex Bogacz |
Beam Dynamics
|
05 Nov 1993 |
92-v2 |
A Simplified Analysis of Resonant Extraction at the Main Injector |
John A. Johnstone |
Extraction
Beam Dynamics
|
03 Sep 1993 |
85-v1 |
Transparencies from 150 GeV Line Status Review |
Management of Main Injector Project |
Beam Instrumentation
Beam Dynamics
Transfer Lines
|
21 Jul 1993 |
81-v1 |
Response to Recommendation from September 1992 DOE Review, Main Injector Ring Vacuum - WBS 1.1.2.1 |
James A. MacLachlan |
Beam Dynamics
Vacuum
Vacuum
|
10 Mar 1993 |
76-v1 |
Calculating Orbit Errors in Main Injector Using Two or One BPM/Cell Correction Scheme |
Fady A. Harfoush |
Lattice
Beam Dynamics
|
03 Dec 1992 |
75-v1 |
Beamline Errors and Corrector Strengths |
David E. Johnson |
Beam Dynamics
Magnets
|
14 Aug 1992 |
704-v1 |
Proton Single Coalesced-Bunch Intensities in the Main Injector |
Gerry Dugan |
RF
Beam Dynamics
|
06 Aug 1991 |
61-v1 |
Examination of the Stability of the Advanced Imaginary gamma_t Lattice |
S. Y. Lee et al. |
Studies
Lattice
Beam Dynamics
|
06 May 1991 |
57-v1 |
Synchrotron Phase Transition Crossing Using an RF Harmonic |
James E. Griffin |
RF
Beam Dynamics
|
01 Mar 1991 |
52-v1 |
Chromaticity Compensation Sextupole Strengths |
S. Alex Bogacz |
Lattice
Beam Dynamics
Magnets
|
20 Feb 1991 |
49-v2 |
alpha_1 Dismay |
James A. MacLachlan |
Beam Dynamics
|
12 Feb 1991 |
46-v1 |
Microwave Instability at Transition - Stability Diagram Approach |
S. Alex Bogacz |
Beam Dynamics
|
01 Dec 1990 |
34-v1 |
Transition Crossing in the Main Injector-ESME Simulation |
S. Alex Bogacz |
Beam Dynamics
|
01 Aug 1990 |
31-v1 |
Main Injector RF Cycle and Z/N Limit |
Kingyuen B. Ng |
RF
Beam Dynamics
|
10 Jun 1990 |
32-v1 |
Some Estimation Concerning Crossing Transition of the Main Injector |
Kingyuen B. Ng |
Beam Dynamics
|
01 Jun 1990 |
14-v2 |
Eddy Current Effects in the Main Injector Beam Tube |
Stephen D. Holmes |
Beam Dynamics
Magnets
|
10 Apr 1990 |
3-v1 |
A Dynamic Lattice Insertion for Main Injector Extraction |
Rodney E. Gerig |
Extraction
Lattice
Beam Dynamics
|
31 Oct 1989 |
15-v2 |
Longitudinal Emittance Growth at Transition in the Main Injector |
Stanley M. Pruss et al. |
Beam Dynamics
|
11 Sep 1989 |