528-v1 |
Notes for MI/RR Group Meeting of 10 March 2003 |
Bruce C. Brown |
RF
Extraction
Beam Instrumentation
Vacuum
MI-RR-Group
|
23 Apr 2020 |
484-v1 |
Notes for MI/RR Group Meeting of 26 Feb 2003 |
Chandrashekhara M. Bhat et al. |
RF
Beam Instrumentation
MI-RR-Group
RF
BPM
|
23 Apr 2020 |
468-v4 |
Notes for MI/RR Group Meeting of 19 Feb 2003 |
Bruce C. Brown |
RF
Beam Instrumentation
Transfer Lines
Beam Dynamics
MI-RR-Group
Studies
|
23 Apr 2020 |
13-v1 |
gamma_t Jump Schemes |
Stephen G. Peggs |
RF
Lattice
Beam Dynamics
|
07 Feb 2020 |
12-v1 |
MI-Transition Crossing ESME Simulation |
S. Alex Bogacz |
RF
Beam Dynamics
|
07 Feb 2020 |
367-v3 |
Determining the Radius and Energy of the Recycler Ring |
Ioanis Kourbanis |
RF
Beam Instrumentation
Studies
BPM
|
03 Oct 2019 |
4827-v5 |
XFR Modification to Resetting Beam Sync (AA) and Offset Beam Sync (OAA) |
Craig C Drennan |
RF
LLRF
LLRF
Operations
LLRF
RF
|
05 Jun 2015 |
1927-v2 |
Beam Acceleration Capabilities of the Present MI RF System |
Ioanis Kourbanis |
RF
|
10 May 2013 |
3669-v1 |
Bunch coalescing study at low energy |
Anna Yagodnitsyna |
RF
|
10 Sep 2010 |
3562-v1 |
MI -> RR Injection Phase and Energy Mismatch: Measurements using W24 |
Chandrashekhara M. Bhat et al. |
RF
Beam Instrumentation
Beam Instrumentation
Studies
Recycler
Main Injector
Mountain Range
Shot Data Analysis (SDA)
Talks
Studies
Data Acquisition
RF
|
02 Mar 2010 |
2317-v4 |
Main Injector HLRF Anode Limit Program & Cavity Tuner RF Voltage Limit |
Tim G. Berenc et al. |
RF
HLRF
Proton Plan
|
14 Sep 2006 |
2379-v1 |
Growth Rates of Coupled Bunch Modes due to the Fundamental RF Impedance |
Ioanis Kourbanis |
RF
|
04 Aug 2006 |
2331-v1 |
Main Injector HLRF Measurements for Proton Plan |
Tim G. Berenc |
RF
HLRF
Proton Plan
|
07 Jul 2006 |
2311-v2 |
Main Injector RF Power Calculations for the Proton Plan |
Tim G. Berenc et al. |
RF
HLRF
Proton Plan
|
30 Jun 2006 |
841-v7 |
Pbar acceleration in MI using 2.5 MHz and 53 MHz rf Systems |
Chandrashekhara M. Bhat et al. |
RF
Controls
Studies
Longitudinal Dynamics
LLRF
Beam Dynamics
HLRF
HLRF
|
07 Nov 2005 |
1441-v1 |
The Proton Plan |
Bruce Baller et al. |
RF
Project
Upgrades
Projects
|
11 Nov 2004 |
1347-v1 |
Calibration of 2.5 MHz voltage in Main Injector |
Vincent Wu |
RF
|
15 Sep 2004 |
631-v1 |
Barrier RF Stacking at Fermilab |
Weiren Chou et al. |
RF
Longitudinal Dynamics
LLRF
Beam Dynamics
Adv. Accelerator R&D
HLRF
|
29 May 2003 |
747-v1 |
Slip Stacking at Low Intensity Status of the Beam Studies |
Kiyomi Seiya |
RF
Beam Instrumentation
Studies
LLRF
Beam Dynamics
|
03 Feb 2003 |
17-v1 |
RF Considerations in the Main Injector |
Philip S. Martin |
RF
|
17 Jan 2003 |
364-v1 |
Notes for MI/RR Group Meeting of 23 Sep 2002 |
Bruce C. Brown |
RF
Studies
Operations
MI-RR-Group
Operations
|
13 Jan 2003 |
360-v1 |
Notes for MI/RR Group Meeting of 16 Sep 2002 |
Bruce C. Brown |
RF
Beam Dynamics
MI-RR-Group
|
13 Jan 2003 |
744-v1 |
Simulation of Pbar Stacking and Un-Stacking in the Recycler Ring |
Chandrashekhara M. Bhat |
RF
Beam Instrumentation
Studies
Beam Dynamics
|
01 Sep 2002 |
352-v1 |
Preparing the Proton Bunches in 2.5 MHz Buckets for MI Tune-up |
Chandrashekhara M. Bhat |
RF
Beam Instrumentation
Beam Dynamics
|
01 Jun 2001 |
743-v1 |
Pbar Acceleration in the MI using 2.5 MHz Coalescing RF system: Tune-up Study Scheme with proton beams and Operational Implementation |
Chandrashekhara M. Bhat et al. |
RF
Beam Instrumentation
LLRF
LLRF
|
14 Feb 2001 |
362-v1 |
Pbar Acceleration in the Main Injector RR/AR - MI - Tevatron - Simulations and Tune up Studies Using Protons |
Chandrashekhara M. Bhat |
RF
Beam Instrumentation
Studies
|
20 Nov 2000 |
354-v1 |
Pbar Acceleration in the Main Injector for Run II: ESME Simulations |
Chandrashekhara M. Bhat et al. |
RF
Beam Instrumentation
Studies
|
26 Jul 2000 |
353-v1 |
Slow Deceleration of Anti-Proton Beam in the MI: RF Specifications |
Chandrashekhara M. Bhat |
RF
Beam Instrumentation
|
12 Jun 2000 |
349-v1 |
Anti-Proton Beam Acceleration in the MI and RF Specifications |
Chandrashekhara M. Bhat |
RF
Beam Instrumentation
|
26 Jan 2000 |
317-v1 |
Addendum to MI-0226 |
Gregory L. Vogel |
RF
Beam Instrumentation
BPM
|
24 Jun 1998 |
316-v1 |
MI BPM RF Module Test Results |
Gregory L. Vogel |
RF
BPM
|
16 Jan 1998 |
157-v1 |
RF Power Limitation on Main Injector Beam Current |
James E. Griffin |
RF
Beam Instrumentation
|
03 Feb 1996 |
83-v1 |
Location of Tevatron RF in the Main Injector Era and Clarification of the Tevatron F0 Geometry |
David E. Johnson |
RF
HLRF
|
14 May 1993 |
704-v1 |
Proton Single Coalesced-Bunch Intensities in the Main Injector |
Gerry Dugan |
RF
Beam Dynamics
|
06 Aug 1991 |
57-v1 |
Synchrotron Phase Transition Crossing Using an RF Harmonic |
James E. Griffin |
RF
Beam Dynamics
|
01 Mar 1991 |
28-v1 |
Standard Ramps |
Philip S. Martin |
RF
Power Supplies
|
14 Jun 1990 |
31-v1 |
Main Injector RF Cycle and Z/N Limit |
Kingyuen B. Ng |
RF
Beam Dynamics
|
10 Jun 1990 |
19-v2 |
RF Intensity Limitations in the Main Injector |
James E. Griffin |
RF
HLRF
|
18 Aug 1989 |