456-v1 |
Notes for MI/RR Group Meeting of 12 Feb 2003 |
Bruce C. Brown |
MI-RR-Group
Operations
Beam Dynamics
Vacuum
|
23 Apr 2020 |
283-v5 |
Notes for MI/RR Group Meeting of 18 Dec 2002 |
Daniel R. Broemmelsiek et al. |
MI-RR-Group
Operations
Studies
|
28 Feb 2020 |
5153-v1 |
MIBLMS Open Access Client |
Kyle J Hazelwood |
Operations
Controls
Beam Instrumentation
Beam Loss Monitors (BLM)
Beam Instrumentation
Alarms
Operations
Controls
|
06 May 2016 |
4417-v1 |
Longitudinal phase space coating of beam in a storage ring |
Chandrashekhara M. Bhat |
Operations
Recycler
Longitudinal Dynamics
LLRF
HLRF
RF
Beam Physics
Multiparticle
|
21 Jul 2013 |
783-v1 |
Ionization Issues at the Fermilab Recycler |
Daniel R. Broemmelsiek |
Operations
Vacuum
Commissioning
|
26 Jan 2012 |
3271-v1 |
Storage efficiency in the Recycler |
Alexander Shemyakin |
Operations
|
17 Dec 2008 |
2178-v2 |
First Report of the Proton Study Group |
Sergei Nagaitsev et al. |
Operations
Other
General
SY120
Upgrades
|
03 Apr 2006 |
2108-v1 |
Notes about an operation at 600 E10 level |
Alexander Shemyakin |
Operations
|
24 Jan 2006 |
2088-v1 |
Overview of Recycler Operations |
Consolato Gattuso |
Operations
|
09 Jan 2006 |
2022-v1 |
Recycler-Only Operations Luminosity Projections |
Dave McGinnis |
Operations
General
Accumulator
|
05 Nov 2005 |
1984-v1 |
VLHC and Pbar Cooling for Tevatron |
Vladimir Shiltsev |
Operations
|
11 Oct 2005 |
1948-v1 |
Model of Antiproton Stack Size Versus Rapid Transfer Time |
Dave McGinnis |
Operations
Accumulator
|
05 Sep 2005 |
1795-v3 |
Pbar Aggregates for Fast Recycler Shots |
Brian E. Drendel |
Operations
Accumulator
Operations
|
03 May 2005 |
1540-v1 |
Defining a Recycler "Golden" Closed Orbit |
David E. Johnson |
Operations
|
25 Jan 2005 |
1443-v3 |
Operations Model: Incorporating the Recycler |
Elliott S McCrory |
Operations
|
12 Nov 2004 |
1428-v1 |
Run 2 Operational Status and Plans for FY05 |
Dave McGinnis |
Operations
Operations
Operations
Operations
Operations
|
01 Nov 2004 |
1298-v1 |
Examination of Accumulator to Recycler Transfers |
David E. Johnson |
Operations
|
06 Aug 2004 |
1268-v1 |
Preliminary Results from Tevatron Collider Model with Assumptions on Recycler Integration |
Elliott S McCrory |
Operations
|
22 Jul 2004 |
1140-v1 |
Redefining MI 8 GeV Energy to Maximize Pbar Production |
David E. Johnson |
Operations
Operations
|
23 Apr 2004 |
1136-v1 |
Recycler status (talk at UEC meeting, Apr 2004) |
Sergei Nagaitsev |
Operations
|
21 Apr 2004 |
933-v2 |
Pbar Momentum Mining in the Recycler :simulations and beam studies |
Chandrashekhara M. Bhat |
Operations
Studies
Beam Dynamics
RF
|
28 Jan 2004 |
364-v1 |
Notes for MI/RR Group Meeting of 23 Sep 2002 |
Bruce C. Brown |
MI-RR-Group
Operations
RF
Studies
Operations
|
13 Jan 2003 |
361-v1 |
Notes for MI/RR Group Meeting of 18 Sep 2002 |
Bruce C. Brown |
MI-RR-Group
Operations
Transfer Lines
|
13 Jan 2003 |