484-v1 |
Notes for MI/RR Group Meeting of 26 Feb 2003 |
Chandrashekhara M. Bhat et al. |
RF
Beam Instrumentation
MI-RR-Group
RF
BPM
|
23 Apr 2020 |
7136-v1 |
Diplexer for Recycler Medium Level Electronics |
Edward W. Cullerton |
RF
|
20 Mar 2019 |
4827-v5 |
XFR Modification to Resetting Beam Sync (AA) and Offset Beam Sync (OAA) |
Craig C Drennan |
RF
LLRF
LLRF
Operations
LLRF
RF
|
05 Jun 2015 |
4417-v1 |
Longitudinal phase space coating of beam in a storage ring |
Chandrashekhara M. Bhat |
Recycler
Longitudinal Dynamics
LLRF
Operations
HLRF
RF
Beam Physics
Multiparticle
|
21 Jul 2013 |
3614-v1 |
Instability Study in the Recycler |
Chandrashekhara M. Bhat et al. |
Beam Dynamics
MI-RR-Group
Electron Cooling
Studies
RF
|
21 May 2010 |
3562-v1 |
MI -> RR Injection Phase and Energy Mismatch: Measurements using W24 |
Chandrashekhara M. Bhat et al. |
RF
Beam Instrumentation
Beam Instrumentation
Studies
Recycler
Main Injector
Mountain Range
Shot Data Analysis (SDA)
Talks
Studies
Data Acquisition
RF
|
02 Mar 2010 |
3167-v1 |
Cooling the Hot Momentum Beam after the Tev Shots |
Chandrashekhara M. Bhat et al. |
Recycler
Beam Dynamics
Studies
RF
|
27 Jul 2008 |
2884-v2 |
Reconstruction of Longitudinal Phase-spaceby Monte Carlo Method |
Chandrashekhara M. Bhat |
Recycler
Beam Dynamics
RF
|
05 Oct 2007 |
745-v1 |
Gated Current Integrator for the Beam in the RR Barrier Bucket |
Chandrashekhara M. Bhat et al. |
Beam Instrumentation
LLRF
LLRF
Beam Dynamics
RF
|
13 Dec 2005 |
1077-v1 |
Barrier-bucket longitudinal emittance calculatio. |
Valeri Balbekov |
Longitudinal Dynamics
RF
|
17 Mar 2004 |
933-v2 |
Pbar Momentum Mining in the Recycler :simulations and beam studies |
Chandrashekhara M. Bhat |
Beam Dynamics
Operations
Studies
RF
|
28 Jan 2004 |
571-v1 |
Equalizers for Accumulator Core Cooling Upgrade |
Ding Sun |
RF
|
29 Apr 2003 |
488-v1 |
Notes for MI/RR Group Meeting of 3 March 2003 |
Bruce C. Brown |
Vacuum
MI-RR-Group
RF
|
10 Mar 2003 |
382-v1 |
Notes for MI/RR Group Meeting of 30 Sep 2002 |
Bruce C. Brown et al. |
Beam Dynamics
Vacuum
MI-RR-Group
Vacuum
Studies
RF
Transfer Lines
|
14 Jan 2003 |
284-v4 |
Notes for MI/RR Group Meeting of 23 Dec 2002 |
Bruce C. Brown et al. |
Beam Dynamics
Beam Dynamics
MI-RR-Group
Studies
RF
|
07 Jan 2003 |
376-v1 |
A First Look at the Longitudinal Emittance in the Fermilab Recycler Ring |
Chandrashekhara M. Bhat |
Beam Instrumentation
Beam Dynamics
RF
|
02 Aug 2002 |