1019-v1 |
Antiproton Source Debuncher BPM using Synchronous Detection |
James A. Budlong et al. |
Hardware
Front-end Systems
BPM
BPM
|
28 Apr 2020 |
740-v1 |
Instrumentation Breakout for DOE Run II Review July 2003 |
Keith E Gollwitzer et al. |
Beam Instrumentation
ACNET
Beam Instrumentation
Electron Cooling
BPM
Beam Instrumentation
Instrumentation
Beam Instrumentation
Talks
|
23 Apr 2020 |
557-v9 |
Design for Recycler BPM Calibration Acnet Page |
Marc W Mengel |
BPM
Beam Instrumentation
Data Acquisition
BPM
|
23 Apr 2020 |
450-v1 |
Agenda, charge and committee for the RR BPM Technical Review |
Pushpalatha C. Bhat |
RR2003Spring
BPM
Beam Instrumentation
|
23 Apr 2020 |
4269-v5 |
Recycler BPM Sign Convention, System Description, and Signal Path |
Peter Prieto |
BPM
Beam Instrumentation
NOvA
BPM
|
22 Aug 2013 |
3975-v1 |
ESS Update |
Dave McGinnis |
BPM
Superconductivity
|
25 Oct 2011 |
3936-v1 |
Linac/400 MeV BPM System Plans and Status |
Nathan Eddy |
Upgrades
BPM
PIP
BPM
|
07 Sep 2011 |
1169-v6 |
Digital Receiver Based Recycler BPM Front-end Software |
Duane C Voy |
BPM
Beam Instrumentation
BPM
|
11 Sep 2009 |
1270-v1 |
Echotek Based Main Injector Beam Line Tuner Front-end Operation |
Duane C Voy |
Beam Instrumentation
Front-end Systems
BPM
Beam Line Tuner (BLT)
|
11 Sep 2009 |
1333-v3 |
Gets32Sets32 Data Acquisition Protocol |
Kevin Cahill |
BPM
Java Data Acquisition
|
13 Feb 2008 |
3018-v3 |
Instrumentation Tutorials |
Bob Webber |
BPM
Talks
|
04 Feb 2008 |
2371-v1 |
Note on Position Sensitivity of the Sum Signal from a Main Injector Extra-Wide Aperture BPM |
Bob Webber |
Beam Instrumentation
BPM
BPM
Intensity Measurements
BPM
|
01 Aug 2006 |
2348-v1 |
Model of RF Leakage Effect on MI Beam Position Measurement |
Bob Webber |
Beam Instrumentation
BPM
BPM
BPM
|
14 Jul 2006 |
2285-v2 |
Rapid Transfer BPM List as of 6-9-06 (after upgrades) |
John Van Bogaert |
Beam Transfer
BPM
BPM
Transfer Lines
Transfer Lines
Run II Upgrades
BPM
|
09 Jun 2006 |
2280-v1 |
MI Extra Wide Aperture BPM Scaling in Difference-Over-Sum BPM System |
Bob Webber |
Beam Instrumentation
BPM
BPM
BPM
|
05 Jun 2006 |
2273-v3 |
MI Extra Wide Aperture BPM Scaling in AM-PM BPM System |
Bob Webber |
Beam Instrumentation
BPM
BPM
BPM
|
26 May 2006 |
2153-v1 |
Main Injector BPM Test Stand Data |
Bob Webber |
Beam Instrumentation
BPM
BPM
BPM
|
18 Feb 2006 |
2085-v1 |
Calibration of the Booster BPM System |
Bob Webber |
BPM
Beam Instrumentation
BPM
|
28 Dec 2005 |
2020-v2 |
Summary of the ICALEPCS 2005 Conference |
Charles Briegel et al. |
Accelerator Seminar
Front-end Systems
BPM
Power Supplies
|
07 Nov 2005 |
1978-v2 |
Memo on Preliminary Values for MI BPM Polynomial Coefficients |
Bob Webber |
Beam Instrumentation
Monitoring Instrumentation
BPM
BPM
Extraction from Main Injector
BPM
|
03 Oct 2005 |
1322-v2 |
Main Injector/NuMI BPM Scaling - Analysis of Main Injector HP602 and HP604 BPM Data from Traditional Main Injector and NuMI BPM Systems |
Bob Webber |
Beam Instrumentation
Commissioning
Monitoring Instrumentation
BPM
General
BPM
|
03 Oct 2005 |
1958-v2 |
Antiproton Beam Position Measurements with Prototype Equipment at MI-30 |
Charles Briegel et al. |
Beam Instrumentation
BPM
BPM
|
19 Sep 2005 |
1892-v1 |
Recycler Transverse Damper Status |
James L. Crisp |
Instabilities
BPM
Beam Dynamics
BPM
Dampers
|
06 Jul 2005 |
792-v12 |
Minutes from the Tevatron BPM Upgrade Project Meetings |
Bob Webber et al. |
Tevatron BPM
BPM
BPM
BPM
|
15 Jun 2005 |
1837-v1 |
A Proposal to Upgrade the Switchyard BPM |
Brajesh Choudhary |
BPM
SY120
BPM
|
20 May 2005 |
1496-v3 |
Using Time Separation of Signals to Obtain Independent Proton and Antiproton Beam Position Measurements Around the Tevatron |
Bob Webber |
BPM
BPM
BPM
|
06 May 2005 |
907-v2 |
Monthly Reports of the Tevatron BPM Upgrade Project |
Steve Wolbers |
BPM
BPM
BPM
|
05 May 2005 |
1791-v1 |
Beamline BPM Upgrade |
Nathan Eddy et al. |
BPM
Run II
BPM
|
25 Apr 2005 |
1751-v2 |
Tevatron BPM Upgrade (talk at 3/24/05 Run 2 Meeting) |
Steve Wolbers |
BPM
BPM
Run II
BPM
|
24 Mar 2005 |
1584-v1 |
Collection of BPM Related Papers from the Tev Commissioning Era |
Alan Baumbaugh et al. |
Beam Loss Monitors (BLM)
BPM
Instrumentation
BPM
Intensity Measurements
BPM
|
18 Feb 2005 |
1542-v1 |
Summary of Tevatron BPMs for Main Injector |
Michael A. Martens et al. |
BPM
BPM
BPM
BPM
|
25 Jan 2005 |
1512-v3 |
Tevatron BPM Upgrade Test Stand Setup |
Dehong Zhang |
BPM
BPM
BPM
|
27 Dec 2004 |
1114-v11 |
Test the Modified EchoTek Board |
Vince Pavlicek et al. |
BPM
BPM
BPM
|
29 Nov 2004 |
1450-v1 |
Tevatron BPM Modes of Operation |
Jim Steimel |
BPM
BPM
BPM
|
15 Nov 2004 |
1358-v2 |
TeV BPM Data Registers |
Michael A. Martens et al. |
Tevatron BPM
BPM
BPM
BPM
|
04 Nov 2004 |
1415-v4 |
Relationship Between Beam Position Monitor Log Ratio and Difference-Over-Sum Formulations |
Bob Webber |
BPM
BPM
|
21 Oct 2004 |
1416-v1 |
Note on BPM Sensitivity Scale Factors for NuMI BPM System |
Bob Webber |
Commissioning
Monitoring Instrumentation
BPM
General
Primary Proton Beam
BPM
|
18 Oct 2004 |
1360-v1 |
BPM Test signal spectrum analysis and batch envelope filter |
Gustavo Cancelo |
Tevatron BPM
BPM
BPM
BPM
|
23 Sep 2004 |
1359-v1 |
Echotek Update |
Eric James |
Tevatron BPM
BPM
BPM
BPM
|
23 Sep 2004 |
1356-v1 |
Tevatron BPM Upgrade (Talk 9/21/04) |
Steve Wolbers |
Tevatron BPM
BPM
BPM
|
22 Sep 2004 |
1323-v3 |
MI beam orbit verifier specifications for the NuMI Beam Permit System |
Andrew Godley |
Beam Instrumentation
Monitoring Instrumentation
BPM
Extraction from Main Injector
Primary Proton Beam
Controls
|
07 Sep 2004 |
1200-v1 |
Short-gate sampling mode |
Jim Steimel |
Tevatron BPM
BPM
BPM
BPM
|
11 Jun 2004 |
446-v1 |
OBSOLETE |
Duane C Voy |
BPM
Beam Instrumentation
BPM
|
18 May 2004 |
801-v1 |
OBSOLETE |
Duane C Voy |
BPM
Beam Instrumentation
Front-end Documentation
BPM
|
18 May 2004 |
800-v2 |
OBSOLETE |
Duane C Voy |
Beam Instrumentation
BPM
Front-end Documentation
BPM
|
18 May 2004 |
445-v1 |
Resonant Log Amplifier Based Recycler BPM Front-end Software Description |
Duane C Voy |
BPM
Beam Instrumentation
BPM
|
18 May 2004 |
1161-v1 |
Tevatron BPM Upgrade Calibration Specifications |
Jim Steimel |
Tevatron BPM
BPM
BPM
BPM
|
06 May 2004 |
1156-v1 |
FNPL BPM System RAM Module Readout Software |
Jason C. Wennerberg |
Controls
BPM
BPM
|
04 May 2004 |
1088-v1 |
Determining Beta-Star in the Tevatron |
Michael J. Syphers |
Collision Point Monitor (CPM)
BPM
Beam Studies
Instrumentation
BPM
Optics
BPM
|
29 Mar 2004 |
1082-v1 |
Slides from 3/18/04 Tevatron BPM upgrade meeting |
Bill Haynes |
Tevatron BPM
BPM
BPM
BPM
|
21 Mar 2004 |
560-v13 |
RR BPM channel Assignments |
Peter Prieto |
RR2003Spring
BPM
Beam Instrumentation
BPM
|
17 Mar 2004 |
1061-v1 |
Tevatron BPM Upgrade Timing/Diagnostic Design Ideas |
Bill Haynes |
Tevatron BPM
BPM
BPM
BPM
|
07 Mar 2004 |
1041-v1 |
Echotek Drivers |
Charles Briegel |
Tevatron BPM
BPM
Beam Instrumentation
BPM
|
24 Feb 2004 |
987-v1 |
BPM Software Specifications meeting |
Jim Steimel |
Tevatron BPM
BPM
BPM
BPM
|
29 Jan 2004 |
977-v1 |
Tevatron BPM Resolution Demonstration |
Bob Webber |
BPM
BPM
BPM
|
15 Jan 2004 |
969-v1 |
TeV BPM Commissioning |
Jim Steimel |
Tevatron BPM
BPM
BPM
|
12 Jan 2004 |
967-v1 |
Description of Conditions of VA14 and HA15 BPM Proton and Pbar Signals During Position Scan |
Bob Webber |
BPM
BPM
BPM
|
12 Jan 2004 |
959-v1 |
A View of Bunch Crossings vs. Time and Location Around the TeV |
Bob Webber |
General
Beam Transfer
BPM
Instrumentation
BPM
BPM
|
02 Jan 2004 |
948-v1 |
Summary: Status, Motivations and Directions |
Bob Webber |
Tevatron BPM
BPM
BPM
|
17 Dec 2003 |
947-v1 |
BPM Hardware |
Vince Pavlicek |
Tevatron BPM
BPM
BPM
|
17 Dec 2003 |
946-v1 |
Seeing Antiprotons with the Damper Board |
Robert K Kutschke |
BPM
BPM
|
17 Dec 2003 |
944-v1 |
Tevatron BPM Requirements |
Michael A. Martens |
BPM
BPM
|
17 Dec 2003 |
943-v2 |
Tevatron BPM Upgrade Project Manager Overview |
Steve Wolbers |
Tevatron BPM
BPM
BPM
|
17 Dec 2003 |
554-v4 |
Tevatron Beam Position Monitor Upgrade Requirements |
Jerry Annala et al. |
BPM
Instrumentation
BPM
BPM
|
12 Nov 2003 |
906-v1 |
Minutes from the Tevatron BPM Upgrade Hardware Meetings |
Steve Wolbers |
Tevatron BPM
BPM
BPM
BPM
|
10 Nov 2003 |
870-v1 |
Make a BPM out of a Damper? |
Vince Pavlicek |
Tevatron BPM
BPM
BPM
BPM
|
07 Oct 2003 |
837-v1 |
Purpose of Tevatron BPM Upgrade Specifications Talk |
Jim Steimel |
Tevatron BPM
BPM
BPM
BPM
|
19 Sep 2003 |
836-v1 |
Tevatron Beam Position Monitor Upgrade Specifications Outline -- Draft |
Jim Steimel |
Tevatron BPM
BPM
BPM
BPM
|
19 Sep 2003 |
781-v1 |
Tev BPM Requirements Review |
Jim Steimel |
Tevatron BPM
BPM
BPM
BPM
|
14 Aug 2003 |
773-v1 |
Tevatron BPM Upgrade Project |
Steve Wolbers |
Tevatron BPM
BPM
BPM
BPM
|
08 Aug 2003 |
770-v1 |
Operations Bulletin #924 : Towards a Better Understanding of BPM Data Acquisition |
Rodney E. Gerig |
Tevatron BPM
BPM
BPM
BPM
|
08 Aug 2003 |
768-v1 |
Present Uses of the Fermilab Digital Signal Receiver VXI Module |
Brian E. Chase |
Tevatron BPM
BPM
LLRF
BPM
BPM
|
08 Aug 2003 |
766-v1 |
Basic BPM Hardware Theory and Measurements |
Jim Steimel |
Tevatron BPM
BPM
Instrumentation
BPM
BPM
|
08 Aug 2003 |
736-v1 |
Coupling Between Adjacent BPMs |
James L. Crisp |
Monitoring Instrumentation
BPM
BPM
|
17 Jul 2003 |
618-v1 |
Thoughts on TeV BPM Improvements |
Bob Webber |
BPM
Beam Instrumentation
Instrumentation
BPM
|
27 May 2003 |
525-v1 |
RR and Transport BPM Tech Spec |
Bob Webber |
BPM
Beam Instrumentation
BPM
|
22 Mar 2003 |
509-v1 |
Main Injector BPM Review Committee Report of the meeting on March 4, 2003 |
Keith E Gollwitzer et al. |
Beam Instrumentation
BPM
BPM
|
18 Mar 2003 |
379-v2 |
RECYCLER BPM SYSTEM UPGRADE |
Ming-jen Yang |
BPM
|
13 Jan 2003 |
457-v2 |
Recycler BPM Front-end 030217 Technical Review |
Duane C Voy |
BPM
Beam Instrumentation
BPM
|
18 Feb 2003 |
453-v1 |
A Matlab Simulation of the Proposed Recycler BPM Signal Processing |
Warren Schappert |
RR2003Winter
BPM
Beam Instrumentation
Data Acquisition
BPM
|
17 Feb 2003 |
452-v1 |
Recycler Upgrade Pre-Amplifier- Transition Module Design |
Peter Prieto |
BPM
Beam Instrumentation
BPM
|
14 Feb 2003 |
443-v1 |
RR BPM Meeting minutes to discuss Software |
Bob Webber |
BPM
Beam Instrumentation
RR BPM
BPM
|
13 Feb 2003 |
442-v1 |
RR BPM Meeting minutes to discuss Calibration System |
Bob Webber |
BPM
Beam Instrumentation
RR BPM
BPM
|
13 Feb 2003 |
441-v1 |
RR BPM Meeting minutes to discuss ECHOTEK DDC Signal Processing |
Bob Webber |
BPM
Beam Instrumentation
RR BPM
BPM
|
13 Feb 2003 |
440-v1 |
RR BPM Meeting minutes on preamps and transition modules/crates |
Bob Webber |
BPM
Beam Instrumentation
RR BPM
BPM
|
13 Feb 2003 |
439-v1 |
RR BPM Meeting on Schedule Development |
Bob Webber |
BPM
Beam Instrumentation
RR BPM
BPM
|
13 Feb 2003 |
438-v1 |
Recycler BPM Proposal - July 10, 2002 |
James L. Crisp et al. |
BPM
Beam Instrumentation
BPM
|
13 Feb 2003 |
138-v1 |
Requirements for the Recycler Ring and Associated Transfer Line BPMs |
Brajesh Choudhary |
Beam Instrumentation
BPM
Beam Instrumentation
BPM
|
07 Feb 2003 |
419-v1 |
Thoughts On Using A Wire To Simulate Beam Through a BPM Pickup |
Bob Webber |
BPM
Beam Instrumentation
BPM
|
29 Jan 2003 |
395-v2 |
RR BPM Dynamic Range Thoughts |
Bob Webber |
RR2003Winter
RR2003Spring
BPM
Beam Instrumentation
BPM
|
23 Jan 2003 |
383-v1 |
Notes for MI/RR Group Meeting of 7 Oct 2002 |
Bruce C. Brown |
Studies
Controls
BPM
Beam Instrumentation
MI-RR-Group
|
14 Jan 2003 |
373-v1 |
BPM System Requirements |
Martin J. Hu |
BPM
Beam Instrumentation
BPM
|
29 Jul 2002 |
788-v1 |
MI8 Transfer Line Lattice Function Measurement |
Saeed Assadi et al. |
Lattice
BPM
|
01 May 2000 |
317-v1 |
Addendum to MI-0226 |
Gregory L. Vogel |
RF
Beam Instrumentation
BPM
|
24 Jun 1998 |
323-v2 |
Beam Position Monitors for the Fermilab Recycler Ring |
Ed Barsotti, Jr. et al. |
BPM
Beam Instrumentation
BPM
|
29 Apr 1998 |
316-v1 |
MI BPM RF Module Test Results |
Gregory L. Vogel |
RF
BPM
|
16 Jan 1998 |
286-v1 |
The Effect of Quadrupole Magnetic Fields on Main Injector BPM Measurements |
James L. Crisp et al. |
Beam Instrumentation
BPM
BPM
|
31 Jan 1997 |