4519-v1 |
Studies of MI Beam Intensity, Loss and Activation Patterns |
Bruce C. Brown |
Beam Instrumentation
DCCTs
ES&H
|
27 May 2020 |
2834-v1 |
Main Injector Residual Radiation Data 2004 - 2007 |
Bruce C. Brown |
ES&H
|
22 May 2020 |
2618-v1 |
First Results from MI8 Collimator Use |
Phil Adamson et al. |
Studies
Transfer Lines
Collimation
ES&H
|
22 May 2020 |
4867-v3 |
Calibration of BLM Response to Proton Loss |
Bruce C. Brown |
Beam Instrumentation
Beam Loss Monitors (BLM)
Collimation
ES&H
|
10 Mar 2020 |
307-v2 |
Shielding Assessment of F0 to Switchyard Beam Line Enclosure for MI 120 GeV Beam Transport |
Chandrashekhara M. Bhat |
Transfer Lines
Beam Dynamics
ES&H
|
28 Feb 2020 |
309-v2 |
Ground Water, Air-Borne and Soil Activation from the Operation of the MI-40 Beam Absorber During the FMI Era |
Chandrashekhara M. Bhat |
ES&H
|
26 Sep 2019 |
7573-v2 |
Design Considerations and Operational Features of the Collimators for the Fermilab Main Injector and Recycler |
Bruce C. Brown |
Energy Deposition
Recycler
Main Injector
Transfer Lines
Collimation
Collimation
ES&H
Beam Physics
Transfer Lines
|
30 Aug 2019 |
6270-v2 |
Al Tag Radiation Studies for Instrumentation in the Main Injector |
Bruce C. Brown et al. |
Beam Instrumentation
Beam Instrumentation
Recycler
Main Injector
Photographs
ES&H
Instrumentation
|
13 Apr 2018 |
4046-v3 |
Activation of Steel and Copper Samples in the Main Injector Collimator Region |
Bruce C. Brown |
Energy Deposition
Collimation
ES&H
|
01 Jun 2017 |
4723-v1 |
Tunnel Cable Clean-up Memos |
Paul PCC Czarapata |
ES&H
ES&H
|
22 Dec 2014 |
3980-v2 |
Analysis Procedures for Al Activation Studies |
Bruce C. Brown |
Beam Instrumentation
Energy Deposition
Beam Loss Monitors (BLM)
Collimation
ES&H
|
09 Apr 2012 |
3717-v1 |
Comparison of Short Term Cooldown Data for MI Collimator C307 Near Beam and Beside Marble Shielding |
Amir Jaehoon Safavi |
ES&H
|
17 Nov 2010 |
3568-v1 |
Predicting Residual Radiation using Beam Loss Data - Early Results |
Bruce C. Brown |
Beam Instrumentation
Beam Loss Monitors (BLM)
Operations
MI-Dept
ES&H
|
11 Mar 2010 |
3529-v1 |
Expected Activation of SmCo5 Beam Line Magnets |
Bruce C. Brown |
Transfer Lines
Magnets
ES&H
NOvA
|
05 Jan 2010 |
3219-v1 |
Analysis of Some Crude Main Injector Radiation Cool-down Data |
Bruce C. Brown |
Operations
ES&H
|
03 Oct 2008 |
2426-v2 |
MARS15 Calculations for MI8 Collimator Design |
Bruce C. Brown et al. |
Transfer Lines
Collimation
Proton Plan
ES&H
|
22 Apr 2008 |
2881-v2 |
Main Injector Collimation System Hardware |
Bruce C. Brown |
Operations
Collimation
Proton Plan
ES&H
|
22 Apr 2008 |
1382-v2 |
Residual Radiation Hints for Aperture and Alignment Issues in the Main Injector |
Bruce C. Brown |
Alignment
ES&H
Vacuum
|
18 Jan 2005 |
148-v2 |
AP4 Beam Dump and Allowed Beam Intensity Limit During the Construction Phase of theMI-8 GeV Beam-line |
Chandrashekhara M. Bhat |
Beam Dynamics
ES&H
|
10 Jul 2003 |
105-v1 |
Radiation Levels in the 8 GeV Beamline Arising from the Tevatron Beam Losses |
Chandrashekhara M. Bhat et al. |
ES&H
|
24 Jun 2003 |
344-v1 |
Preliminary Measurement of Airborne Radioactvity in the MI40 Absorber Room and at MI40 Abort Lambertsons |
Anthony F. Leveling |
Studies
ES&H
|
07 Apr 1999 |
342-v1 |
Radiation Dose Rate Measurement at Tevatron Wave Guide Penetrations at F0 Service Building due to 8 GeV Proton Beam Loss |
Anthony F. Leveling |
ES&H
|
05 Feb 1999 |
332-v1 |
Determination of Interlock Gate Locations at E35, F47, and A25 |
Anthony F. Leveling |
Studies
Civil
ES&H
|
15 Sep 1998 |
331-v2 |
Effect of FO Crossover Shielding Field Change |
Anthony F. Leveling |
Civil
ES&H
|
21 Jul 1998 |
330-v1 |
Committed Effective Dose Equivalent Calculation for Personnel Exposure to Airborne Radioactivity Produced by Main Injector Beam Loss |
Anthony F. Leveling |
Studies
ES&H
|
07 Jul 1998 |
315-v1 |
Main Injector and Recycler Ring Shielding Assessment |
Chandrashekhara M. Bhat et al. |
Studies
ES&H
|
01 Jul 1998 |
305-v2 |
A Preliminary Analysis of Ground-Water and Surface-Water Radioactivity Around the Main Injector Extraction and Injection Regions |
Chandrashekhara M. Bhat et al. |
Studies
ES&H
|
01 Nov 1997 |
306-v1 |
Can Magnetic Fields Assist in Radiation Shielding for 8 GeV Proton Beams |
Bruce C. Brown |
Energy Deposition
ES&H
ES&H
|
15 Aug 1997 |
289-v1 |
Main Injector 8 GeV Beam Line Shielding Assessment |
Chandrashekhara M. Bhat et al. |
Magnets
ES&H
|
17 Feb 1997 |
235-v1 |
Groundwater, Air-Borne and Soil Activation from the Operation of the Temporary Beam Absorber in the MI-8 GeV Beam Line |
Chandrashekhara M. Bhat et al. |
Civil
ES&H
|
25 Jan 1997 |
211-v2 |
Ground-water Activation from the Operation of MI40 Beam Absorber |
Chandrashekhara M. Bhat et al. |
Design Properties
ES&H
|
28 Aug 1996 |
197-v1 |
8 GeV Beam Absorber for Beam Line Commissioning |
Chandrashekhara M. Bhat et al. |
Design Properties
Commissioning
ES&H
|
31 Jul 1996 |
146-v2 |
Radiation Level in the Intersection Region of AP2 and 8 GeV Beam-line due to Beam Loss in the AP2 Beam-line |
Chandrashekhara M. Bhat et al. |
Beam Dynamics
ES&H
|
23 Aug 1995 |
136-v2 |
µ-Dose Level in the Vicinity of the Intersection of the 8 GeV and the AP2-Beamlines |
Chandrashekhara M. Bhat |
Beam Dynamics
ES&H
|
28 Jun 1995 |
100-v1 |
Radiation Levels in the MI-60 Enclosure from Tevatron Beam Losses |
Chandrashekhara M. Bhat |
Beam Dynamics
Civil
ES&H
|
08 Nov 1993 |
95-v1 |
Radioactivity of the Closed Loop Cooling Water of the Main Injector Beam Abort Dump |
Chandrashekhara M. Bhat |
Design Properties
ES&H
|
01 Sep 1993 |
88-v3 |
Radiation Shieldings for MI Culverts |
Chandrashekhara M. Bhat |
Design Properties
Civil
ES&H
|
01 Aug 1993 |
87-v2 |
A Design Study of the MI40 Beam-Abort Dump |
Chandrashekhara M. Bhat |
Design Properties
ES&H
|
29 Jul 1993 |