1262-v5 |
Synchrotron Light Monitor Front End Description |
Eugene Lorman et al. |
Instrumentation
SyncLite (SL)
|
29 Feb 2008 |
1390-v3 |
Abort Gap Monitoring Utilizing Synchrotron Light |
Randy M Thurman-Keup |
Instrumentation
SyncLite (SL)
Abort Gap Measurements
|
19 Feb 2008 |
1738-v3 |
Sync Light ACNET Parameters |
Eugene Lorman et al. |
Instrumentation
SyncLite (SL)
|
29 Jan 2008 |
1975-v2 |
Optical Imaging of the Tevatron Beam using Synchrotron Radiation |
Randy M Thurman-Keup |
Emittance
Instrumentation
SyncLite (SL)
|
29 Jan 2008 |
1098-v4 |
Synclite & AGI Harware Setup |
Eugene Lorman et al. |
Instrumentation
SyncLite (SL)
Abort Gap Measurements
|
29 Jan 2008 |
2586-v1 |
Imaging the LHC beam |
Tanaji Sen |
SyncLite (SL)
Optics
|
13 Dec 2006 |
2537-v4 |
Synclite Master Document |
Randy M Thurman-Keup |
Instrumentation
SyncLite (SL)
|
25 Oct 2006 |
2519-v1 |
AGI Status |
Randy M Thurman-Keup |
Emittance
Instrumentation
Tevatron Group
SyncLite (SL)
Abort Gap Measurements
|
13 Oct 2006 |
2165-v1 |
Monitoring Abort Gap Beam Intensity in the Tevatron Using Synchrotron Radiation |
Randy M Thurman-Keup |
Instrumentation
SyncLite (SL)
Abort Gap Measurements
|
22 Feb 2006 |
1974-v1 |
Synclite Status 9/28/2005 |
Randy M Thurman-Keup |
Instrumentation
SyncLite (SL)
|
30 Sep 2005 |
1973-v1 |
A Controls Java-Based Synclite Viewer Application |
Randy M Thurman-Keup |
Instrumentation
SyncLite (SL)
|
29 Sep 2005 |
1544-v2 |
Synclite Status |
Randy M Thurman-Keup |
Instrumentation
SyncLite (SL)
|
05 Jul 2005 |
1337-v2 |
notes from Instrumentation/Beam Physics Meetings |
Nathan Eddy et al. |
Tune Measurement
FBI
Ion Profile Monitor
Schottky
Intensity Measurements
SyncLite (SL)
Sampled Bunch Display (SBD)
DCCTs
Instrumentation/beam Physics
Dampers
Abort Gap Measurements
Flying Wires
|
29 Mar 2005 |
1759-v1 |
Synclite Status from 03/25/05 TeV Mtg |
Randy M Thurman-Keup |
Instrumentation
Tevatron Group
SyncLite (SL)
|
28 Mar 2005 |
1589-v1 |
some sbd and agi data on teV damper issues |
Stephen Pordes |
SyncLite (SL)
Sampled Bunch Display (SBD)
Abort Gap Measurements
|
23 Feb 2005 |
978-v1 |
Synclite Study During December Shutdown |
Harry Cheung et al. |
Instrumentation
Tevatron Group
SyncLite (SL)
|
11 Jan 2005 |
1465-v1 |
Lattice Parameters for Tev Instrumentation |
Valeri A Lebedev et al. |
Emittance
Instrumentation
Shot Data Analysis (SDA)
SyncLite (SL)
Flying Wires
Flying Wires
|
18 Nov 2004 |
1460-v1 |
Status of Synclite |
Randy M Thurman-Keup |
Instrumentation
SyncLite (SL)
Instrumentation/beam Physics
Abort Gap Measurements
|
17 Nov 2004 |
1389-v1 |
VME Base Addresses |
Eugene Lorman |
Ion Profile Monitor
SyncLite (SL)
LabVIEW
Flying Wires
|
01 Oct 2004 |
1219-v1 |
Tevatron Abort Gap Monitor Timing Controls |
Tom Meyer et al. |
Instrumentation
Intensity Measurements
SyncLite (SL)
TeV ABORT
|
23 Jun 2004 |
1218-v1 |
Abort Gap Monitor Status presented at Beam Phys/Inst Mtg. |
Randy M Thurman-Keup |
Instrumentation
SyncLite (SL)
|
23 Jun 2004 |
1217-v1 |
Abort Gap Monitor results presented at TeV Mtg. |
Randy M Thurman-Keup |
Instrumentation
SyncLite (SL)
|
23 Jun 2004 |
1216-v1 |
Abort Gap Monitor Talk at LARP Mtg. |
Randy M Thurman-Keup |
Instrumentation
SyncLite (SL)
|
23 Jun 2004 |
1162-v2 |
Abort Gap Monitoring Status |
Randy M Thurman-Keup |
Instrumentation
SyncLite (SL)
Talks
|
23 Jun 2004 |
1195-v1 |
Abort Gap Synch Light Results from 6/4/04 TeV Meeting |
Randy M Thurman-Keup |
Instrumentation
SyncLite (SL)
|
04 Jun 2004 |
1194-v1 |
Abort Gap Synch Light results from 5/28/04 TeV Meeting |
Randy M Thurman-Keup |
Instrumentation
SyncLite (SL)
|
04 Jun 2004 |
1090-v1 |
Picture of Proton SyncLight Box with Light Splitter Installed |
Jim Fast et al. |
Instrumentation
SyncLite (SL)
|
29 Mar 2004 |
418-v2 |
synchlight rates vs particle energy |
Alan A. Hahn |
Emittance
SyncLite (SL)
|
25 Mar 2004 |
1086-v1 |
Sync Light ACNET Parameters |
Willem Blokland et al. |
Instrumentation
SyncLite (SL)
|
25 Mar 2004 |
888-v3 |
Tevatron Lattice Function Fits based on Comparisons of Transverse Emittance Measurements at 150 and 980GeV |
Krzysztof Genser |
Emittance
Transverse Dynamics
SyncLite (SL)
Sampled Bunch Display (SBD)
Flying Wires
Flying Wires
|
01 Mar 2004 |
912-v1 |
Pictures of LBNL Photodiode Light Beam Position Detector in Synclight Box. |
John Byrd et al. |
SyncLite (SL)
|
12 Nov 2003 |
911-v1 |
Pictures of Synclight Shutter installed 11/7/03 |
Stephen Pordes |
SyncLite (SL)
|
12 Nov 2003 |
838-v1 |
Update of Snapshot of Tevatron Flying Wire and Synchrotron Light Detector Transverse Emittance Measurements at 980GeV |
Krzysztof Genser |
Emittance
Instrumentation
SyncLite (SL)
Flying Wires
Flying Wires
|
19 Sep 2003 |
587-v3 |
Performance of a Beam Monitor in the Fermilab Tevatron Using Synchrotron Light |
Harry Cheung et al. |
SyncLite (SL)
|
03 Aug 2003 |
656-v1 |
A Snapshot of Tevatron Flying Wire and Synchrotron Light Detector Transverse Emittance Measurements at 980GeV |
Krzysztof Genser |
Emittance
Instrumentation
SyncLite (SL)
Flying Wires
Flying Wires
|
05 Jun 2003 |
606-v1 |
CERN SPS Emittance Measurements |
Federico Roncarolo |
Ion Profile Monitor
SyncLite (SL)
Flying Wires
|
16 May 2003 |
579-v1 |
Synclite Abort Gap Study II |
Harry Cheung |
Beam Studies
Meeting Minutes
Instrumentation
Tevatron Group
SyncLite (SL)
|
29 Apr 2003 |
561-v1 |
Study of beam in abort gap using the Synclite monitor |
Harry Cheung |
SyncLite (SL)
|
18 Apr 2003 |
459-v1 |
Second Beam Orbit Study to Calibrate the Synclite Scale |
Harry Cheung |
SyncLite (SL)
|
31 Mar 2003 |
534-v1 |
Abort gap synclite study |
Harry Cheung |
Tevatron Group
SyncLite (SL)
|
28 Mar 2003 |
466-v1 |
Studies for the Synclite Scale |
Harry Cheung et al. |
SyncLite (SL)
|
24 Feb 2003 |
455-v1 |
Manuals for Avtech pulser used for Synclite |
Harry Cheung |
SyncLite (SL)
|
17 Feb 2003 |
451-v1 |
Synclite - A Transverse Beam Profile Monitor |
Harry Cheung |
SyncLite (SL)
|
14 Feb 2003 |
417-v1 |
synclight geometry |
Andreas Jansson |
Emittance
SyncLite (SL)
|
28 Jan 2003 |
415-v1 |
synclight box pictures |
Harry Cheung et al. |
Emittance
SyncLite (SL)
Alignment
|
27 Jan 2003 |
215-v1 |
Bumping the orbit to calibrate the SyncLite 2 scale |
Harry Cheung |
Beam Studies
SyncLite (SL)
|
13 Dec 2002 |
238-v1 |
Orbit displacements at synchrotron light and correctors due to local 3-bumps |
Aimin Xiao |
General
SyncLite (SL)
|
13 Dec 2002 |
186-v1 |
Results from a prototype beam monitor in the Tevatron using synchrotron light |
Alan A. Hahn et al. |
SyncLite (SL)
|
12 Dec 2002 |
185-v1 |
Results from an imaging beam monitor in the Tevatron using synchrotron light |
Alan A. Hahn et al. |
SyncLite (SL)
|
12 Dec 2002 |