8690-v2 |
Implementation of BLonD for Booster Simulations |
Paul Derwent |
Booster
Beam Dynamics
Longitudinal Dynamics
|
22 Jan 2021 |
8935-v1 |
Analysis of IPM Data for Booster Half-Integer Study. |
Jeffrey Eldred |
Booster
Beam Dynamics
Studies
Transverse Dynamics
Ion Profile Monitor
|
10 Jan 2021 |
8910-v1 |
Preliminary Double-Notch Booster Ecloud Study |
Jeffrey Eldred |
Instabilities
Booster
Beam Dynamics
Studies
Beam Physics
|
17 Dec 2020 |
8904-v1 |
RF system for Booster Accumulator Ring (BAR) |
Chandrashekhara M. Bhat |
Booster
|
15 Dec 2020 |
8874-v3 |
Comment on the PIP-III RCS Location |
David V Neuffer |
Booster
Main Injector
|
24 Nov 2020 |
8735-v1 |
Booster Transition Crossing Study Plan |
Chandrashekhara M. Bhat |
Booster
|
24 Oct 2020 |
8708-v2 |
Booster Physics/Operations Group Telework Report-20200930 |
Chandrashekhara M. Bhat et al. |
Booster
|
01 Oct 2020 |
8705-v2 |
Booster Physics/Operations Group Telework Report-20200806 |
Chandrashekhara M. Bhat et al. |
Collimation
Booster
Beam Dynamics
Studies
Other
Extraction Lattice
Beam Instrumentation
|
01 Oct 2020 |
8621-v1 |
Booster Physics/Operations Group Telework Report-20200806 |
Chandrashekhara M. Bhat et al. |
Booster
|
13 Aug 2020 |
8576-v1 |
Longitudinal Beam Dynamics during Transition Crossing in Booster |
Chandrashekhara M. Bhat et al. |
Booster
Beam Dynamics
Studies
|
16 Jul 2020 |
8536-v2 |
Longitudinal Dynamics at Injection in Booster |
Chandrashekhara M. Bhat |
Booster
Beam Dynamics
LLRF
Beam Instrumentation
|
10 Jul 2020 |
8545-v1 |
Booster Physics/Operations Group Telework Report-20200702 |
Chandrashekhara M. Bhat et al. |
Collimation
Booster
Beam Dynamics
Operations
Studies
Other
Extraction Lattice
Upgrades
Beam Instrumentation
|
06 Jul 2020 |
8503-v1 |
The Curse of Transition Crossing in Synchrotrons |
Chandrashekhara M. Bhat et al. |
Booster
Beam Dynamics
Beam Physics
Main Injector
|
24 Jun 2020 |
4790-v1 |
Early Beam Injection in the Fermilab Booster & its Implementation Plan |
Chandrashekhara M. Bhat |
Beam Dynamics
Operations
Studies
Upgrades
HLRF
LLRF
|
04 May 2020 |
909-v1 |
Booster LLRF VCO DSP Program Info |
Bob Webber |
LLRF
LLRF
|
24 Apr 2020 |
651-v1 |
Booster Monitor User Instructions and Design |
Gerald M Guglielmo |
Operations
|
23 Apr 2020 |
8100-v2 |
Booster Half-Integer Correction Studies (for US-Japan Collaboration) |
Jeffrey Eldred |
Beam Dynamics
Studies
Transverse Dynamics
|
10 Mar 2020 |
7763-v2 |
Proton Source 8-hr Studies (January-June, 2019) |
Chandrashekhara M. Bhat et al. |
Beam Dynamics
Operations
Studies
Power Supplies
Upgrades
HLRF
LLRF
Beam Instrumentation
|
22 Oct 2019 |
7522-v3 |
2019 Booster Studies Capstone Event |
Jeffrey Eldred |
Instabilities
Booster
Beam Dynamics
Studies
Beam Physics
Power Supplies
Transverse Dynamics
|
21 Oct 2019 |
2523-v1 |
Booster Beam Loss Monitor Upgrade Specification |
Craig C Drennan |
Front-end Systems
Beam Instrumentation
|
16 Oct 2019 |
7417-v1 |
Lattice reconstruction using TBT data with Kalman filters |
Cheng-Yang Tan |
Proton Source Physics
|
13 Sep 2019 |
7631-v1 |
Foil Scattering Model for Fermilab Booster |
Chandrashekhara M. Bhat et al. |
Studies
|
12 Sep 2019 |
7622-v2 |
Beam Energy Spread in Booster at Injection |
Chandrashekhara M. Bhat |
Operations
Studies
Beam Physics
|
12 Sep 2019 |
7625-v1 |
Characterization of Transverse Beam Motion in Booster |
Valeri A Lebedev |
Studies
|
12 Sep 2019 |
7610-v1 |
NAPAC 2019: Physics Studies for High Intensity Proton Beams at the Fermilab Booster |
Jeffrey Eldred |
Instabilities
Booster
Studies
Transverse Dynamics
|
05 Sep 2019 |
7601-v1 |
A gram of protons - PIP and Beyound |
William A Pellico |
Booster
Beam Physics
Operations
|
30 Aug 2019 |
7592-v1 |
Booster Fast Loss Monitoring |
Rick Tesarek |
Collimation
Booster
Beam Instrumentation
|
29 Aug 2019 |
7498-v1 |
Challenges and Studies for PIP-II Booster |
Jeffrey Eldred |
Instabilities
Booster
Studies
PIP-Iplus
Beam Physics
Transverse Dynamics
|
24 Jul 2019 |
7480-v1 |
PIPII to Booster Meetings (18 Feb 2019 to 11 Jul 2019) |
Curtis Baffes et al. |
Proton Source Planning
|
12 Jul 2019 |
7453-v1 |
Compilation of Measured Beam Emittance of the Booster from 2015-2019 |
Chandrashekhara M. Bhat |
Booster
Beam Dynamics
Studies
Other
|
04 Jul 2019 |
7376-v6 |
Recent Performance and Future Plans for the Fermilab Accelerator Complex |
Chandrashekhara M. Bhat |
Upgrades
|
23 Jun 2019 |
7103-v1 |
Booster LLRF Transfer Function Modeling |
Edward W. Cullerton |
Booster
LLRF
|
20 Mar 2019 |
7091-v2 |
Booster RF Cavities for PIP-I+ and PIP-II (Functional Requirements Specification) |
Chandrashekhara M. Bhat |
Booster
PIP-Iplus
Projects
|
18 Mar 2019 |
7088-v2 |
Booster Wide Aperture D-Magnets for PIP-I+ and PIP-II (Functional Requirements Specification) |
Chandrashekhara M. Bhat |
Booster
PIP-Iplus
Projects
|
18 Mar 2019 |
7085-v2 |
Booster Intensity AIP for PIP-I+ (Functional Requirements Specification) |
Chandrashekhara M. Bhat |
Booster
PIP-Iplus
Upgrades
|
18 Mar 2019 |
6967-v4 |
Booster DC studies: Adiabatic Beam Capture |
Chandrashekhara M. Bhat et al. |
Booster
Beam Dynamics
Studies
HLRF
LLRF
|
08 Feb 2019 |
5930-v1 |
Booster Collimation Upgrade Plans |
Valery Kapin |
Collimation
Booster
PIP-Iplus
|
21 Aug 2018 |
6017-v2 |
Pre-Review: PIP-I+ Booster Collimator |
Chandrashekhara M. Bhat |
Collimation
Booster
PIP-Iplus
|
21 Aug 2018 |
6619-v1 |
Booster adiabatic capture meeting |
Chandrashekhara M. Bhat et al. |
PIP
|
17 Aug 2018 |
6306-v6 |
Booster Upgrades to Achieve ~MW Beam in the Fermilab Complex |
Chandrashekhara M. Bhat |
Booster
|
10 May 2018 |
6330-v1 |
Fermilab Workshop on Megawatt Rings & IOTA/FAST Collaboration Meeting (Day 1) |
Chandrashekhara M. Bhat et al. |
PIP
|
09 May 2018 |
6180-v1 |
Booster RF capture meeting |
Victor Grzelak et al. |
PIP
|
07 Mar 2018 |
5942-v2 |
Booster D magnet for PIP 2 girder requirements |
William A Pellico |
Magnets
Upgrades
|
19 Feb 2018 |
5350-v5 |
Y567b Power Amplifier Tests at 76 and 106 MHz |
Robyn L Madrak et al. |
Upgrades
PIP
HLRF
|
09 Feb 2018 |
5822-v1 |
Parallel-Biased Booster Replacement Cavity |
Mohamed H Hassan |
Booster
PIP
|
01 Dec 2017 |
5804-v2 |
LLRF Controls Settings |
Craig C Drennan |
LLRF
|
30 Nov 2017 |
3891-v15 |
VME-DDS Frequency and Phase Control Module |
Craig C Drennan |
LLRF
|
30 Nov 2017 |
4568-v4 |
Longitudinal Beam Dynamics of the Booster Beam from Injection to Extraction Beam Studies and Simulations |
Chandrashekhara M. Bhat |
Booster
Beam Dynamics
Operations
Beam Physics
Upgrades
|
15 Nov 2017 |
5307-v4 |
New Booster LLRF DDS -- ACNET Parameters and Curve Application Notes |
Craig C Drennan et al. |
LLRF
|
13 Nov 2017 |
5864-v1 |
Booster BPM Upgrade 2014 to 2017 |
Craig C Drennan |
Beam Instrumentation
|
24 Oct 2017 |
5774-v1 |
PIP: Booster Lattice Studies |
Cheng-Yang Tan |
PIP
|
09 Aug 2017 |
5762-v1 |
Beam based RF voltage measurements and Longitudinal beam tomography at the Fermilab Booster for Intensity Upgrade |
Chandrashekhara M. Bhat |
Studies
|
04 Aug 2017 |
5717-v1 |
2nd Harmonic RF for the Bunch Rotation in the Fermilab Booster |
Chandrashekhara M. Bhat |
Beam Physics
HLRF
|
24 Jul 2017 |
5663-v2 |
2nd harmonic RF perpendicular biased cavity update (20 Jul 2017) |
Kevin Duel et al. |
PIP
|
21 Jul 2017 |
5606-v2 |
Booster lattice meeting (12 Jul 2017) |
Cheng-Yang Tan |
PIP
|
13 Jul 2017 |
5573-v1 |
Booster lattice meeting (28 Jun 2017) |
Yuri Alexahin et al. |
PIP
|
28 Jun 2017 |
5531-v1 |
Booster lattice meeting (14 Jun 2017) |
Yuri Alexahin et al. |
PIP
|
15 Jun 2017 |
5519-v1 |
Study of Two-Stage Collimation System in Fermilab Booster |
Valery Kapin |
PIP
|
12 Jun 2017 |
5477-v2 |
Booster lattice meeting (31 May 2017) |
Cheng-Yang Tan |
PIP
|
31 May 2017 |
5438-v1 |
Booster lattice meeting (17 May 2017) |
Yuri Alexahin et al. |
PIP
|
23 May 2017 |
5400-v2 |
Booster lattice meeting (03 May 2017) |
Yuri Alexahin et al. |
PIP
|
03 May 2017 |
5365-v2 |
Booster lattice meeting (12 Apr 2017) |
Yuri Alexahin et al. |
PIP
|
12 Apr 2017 |
5366-v1 |
Intensity Dependence of Transition Crossing in the Booster |
Chandrashekhara M. Bhat |
Studies
Beam Physics
|
12 Apr 2017 |
5362-v2 |
Booster RF Voltage by Synchrotron Frequency Measurements at Extraction |
Chandrashekhara M. Bhat et al. |
Booster
Studies
Beam Physics
HLRF
|
12 Apr 2017 |
5361-v1 |
PIP1+: Booster lattice measurements |
Kiyomi Seiya et al. |
PIP
|
03 Apr 2017 |
5351-v1 |
Booster lattice meeting (22 Mar 2017) |
Yuri Alexahin et al. |
PIP
|
22 Mar 2017 |
5344-v6 |
Booster Vrf by fsy Measurements at Injection Energy (400 MeV on a DC-Mode) |
Chandrashekhara M. Bhat |
HLRF
Beam Physics
LLRF
|
22 Mar 2017 |
5343-v1 |
Booster lattice meeting (08 Mar 2017) |
Alexandru Macridin et al. |
PIP
|
08 Mar 2017 |
5334-v1 |
Collection of Booster Synchronization Documents |
Craig C Drennan |
LLRF
|
03 Mar 2017 |
5340-v1 |
A proposal for upgrade of Booster collimation system |
Valery Kapin |
PIP
|
22 Feb 2017 |
5339-v1 |
Booster lattice meeting (22 Feb 2017) |
Alexandru Macridin et al. |
PIP
|
22 Feb 2017 |
5338-v1 |
PIP: Booster Lattice Measurements |
Cheng-Yang Tan |
PIP
|
22 Feb 2017 |
5295-v1 |
Proton Beam Intensity Upgrades for the Neutrino Program at Fermilab |
Chandrashekhara M. Bhat |
Booster
Other
Longitudinal Dynamics
Beam Physics
|
15 Dec 2016 |
5288-v1 |
Criteria for proceeding with replacement Booster cavity (PIP) |
William A Pellico |
Booster
PIP
|
05 Dec 2016 |
5273-v1 |
Booster Acceleration Phase Lock Controller |
Craig C Drennan |
Operations
LLRF
|
15 Nov 2016 |
4411-v7 |
Booster LLRF System Block Diagram |
Craig C Drennan |
LLRF
|
14 Nov 2016 |
5247-v1 |
MI8 line Beam emittance measurement |
Ming-jen Yang |
Booster
Main Injector
Recycler
|
06 Oct 2016 |
5208-v1 |
Proton Beam Intensity Upgrades for the Neutrino Program at Fermilab |
Chandrashekhara M. Bhat |
Booster
Beam Physics
|
11 Aug 2016 |
5205-v1 |
R&D on Beam Injection and Bunching Scheme in the Fermilab Booster |
Chandrashekhara M. Bhat |
Booster
|
09 Aug 2016 |
4964-v2 |
Cogging Test Switch |
Craig C Drennan |
LLRF
|
23 Jun 2016 |
5150-v1 |
Phase Changes to A RF and B RF at Transition |
Craig C Drennan |
LLRF
|
04 May 2016 |
5142-v1 |
PIP: LOCO update |
Ken Domann et al. |
PIP
|
20 Apr 2016 |
5101-v1 |
A historical comparison of Booster radiation activations surveys |
William A Pellico |
Booster
|
16 Mar 2016 |
5097-v2 |
Laser Notcher Status |
David E. Johnson |
Projects
Projects
PIP
|
02 Mar 2016 |
4459-v2 |
Booster Paraphase Curve Generator VXI Module |
Craig C Drennan |
LLRF
|
17 Feb 2016 |
5058-v3 |
An Update on Early Injection Capture in the Booster |
Chandrashekhara M. Bhat |
Operations
PIP
|
01 Feb 2016 |
4610-v18 |
PIP RF Cavity and Tuners Refurbishement Progress & Projections |
Keith E Gollwitzer |
Upgrades
PIP
|
11 Jan 2016 |
4566-v3 |
Optics corrections in Booster |
Cheng-Yang Tan |
PIP
|
21 Dec 2015 |
5027-v1 |
PIP: Improving and fixing the Booster MADX model |
Cheng-Yang Tan |
PIP
|
16 Dec 2015 |
5013-v2 |
Workshop on Booster Performance and Enhancements 23 Nov - 24 Nov |
Chandrashekhara M. Bhat et al. |
PIP
|
09 Dec 2015 |
5014-v1 |
Beam Injection and Capture |
Chandrashekhara M. Bhat |
Booster
Beam Dynamics
Upgrades
|
25 Nov 2015 |
4864-v2 |
Simplified Modeling of Space Charge Losses in Booster at Injection |
Alexander A. Valishev |
Beam Dynamics
PIP
|
23 Nov 2015 |
4781-v2 |
Booster to Main Injector Phase-Lock Controller |
Craig C Drennan |
LLRF
|
16 Nov 2015 |
4932-v3 |
An ACNET Application Program to Measure the Energy Spread of Multi-turn Beam in the Booster at Injection |
Chandrashekhara M. Bhat et al. |
Studies
|
16 Sep 2015 |
4936-v1 |
Early Injection studies -- Frequency Trigger OR'ing Module |
Craig C Drennan |
LLRF
|
28 Aug 2015 |
4935-v1 |
Acceleration Gate Module |
Craig C Drennan |
LLRF
|
28 Aug 2015 |
4928-v1 |
Early Beam Injection Scheme for the Fermilab Booster: A Path for Intensity Upgrade |
Chandrashekhara M. Bhat |
Upgrades
|
18 Aug 2015 |
4827-v5 |
XFR Modification to Resetting Beam Sync (AA) and Offset Beam Sync (OAA) |
Craig C Drennan |
Operations
LLRF
RF
LLRF
RF
LLRF
|
05 Jun 2015 |
4779-v1 |
PIP Status Report Meeting |
Ryan Crawford et al. |
Booster
PIP
|
09 Mar 2015 |
4778-v1 |
PIP: LOCO update |
Cheng-Yang Tan |
PIP
|
04 Mar 2015 |
4777-v1 |
Booster 20 Hz tests |
George E. Krafczyk |
Booster
|
02 Mar 2015 |
4763-v1 |
PIP Status Report Meeting |
Tom N Kubicki et al. |
Booster
PIP
HLRF
|
13 Feb 2015 |
4753-v1 |
PIP Status Report Meeting |
Ken Domann et al. |
Booster
PIP
|
02 Feb 2015 |
4700-v2 |
Preparing for PIP II - What are the issues and plans for Booster |
William A Pellico |
Accelerator Seminar
Booster
PIP
|
18 Nov 2014 |
4701-v1 |
A 1-shot sequence for Booster studies |
Chandrashekhara M. Bhat et al. |
Studies
Controls
|
12 Nov 2014 |
4684-v1 |
PIP General Meeting Status Update |
Keith E Gollwitzer |
Booster
PIP
Linac
Regular Meetings
|
16 Oct 2014 |
4683-v3 |
Booster Injection in PIP-II Era An Update |
David E. Johnson |
Upgrades
|
14 Oct 2014 |
4676-v1 |
Head-Tail Modes for FNAL Booster |
Timofey Zolkin |
Accelerator Seminar
Booster
Beam Dynamics
|
30 Sep 2014 |
4647-v1 |
A Proposal for Booster Lattice Modification |
Milorad B. Popovic |
Booster
Upgrades
|
03 Aug 2014 |
4598-v4 |
Approximate Current Changes Needed In Booster Quadrupoles For A Given Tune Change |
Cheng-Yang Tan |
Other
|
16 May 2014 |
4587-v1 |
PIP Status Report Meeting |
Nathan Eddy et al. |
Booster
PIP
|
30 Apr 2014 |
3696-v2 |
Installation, Timing and Gating Details for BPMs In the Booster and 400 MeV Line |
Craig C Drennan |
Beam Instrumentation
|
22 Apr 2014 |
4414-v5 |
Booster Longitudinal Damper System Block Diagram -- Draft for Review |
Craig C Drennan |
Beam Dynamics
LLRF
|
03 Mar 2014 |
4546-v2 |
Beam Energy Spread in the Booster at Injection |
Chandrashekhara M. Bhat et al. |
Beam Dynamics
Operations
Upgrades
Projects
|
19 Feb 2014 |
4536-v1 |
PIP: LOCO for Booster |
Cheng-Yang Tan |
PIP
|
11 Feb 2014 |
3781-v2 |
Proton Source Improvement Plan 2011 |
Valeri A Lebedev et al. |
Booster
Linac
|
03 Feb 2014 |
4443-v1 |
Booster Cavity: Parametric Study |
Mohamed H Hassan et al. |
Booster
PIP
HLRF
|
16 Sep 2013 |
4431-v1 |
Booster Aperture and Alignment |
Kiyomi Seiya |
Booster
PIP
|
22 Aug 2013 |
4413-v1 |
Booster LLRF VXI DSP Module 2013 |
Craig C Drennan |
LLRF
|
15 Jul 2013 |
4306-v1 |
Linac Laser Notcher Status |
David E. Johnson |
Projects
PIP
|
28 Jun 2013 |
4153-v5 |
Booster Main Injector Phase Lock Divide-By-32 Phase Error Trajectory Method |
Craig C Drennan |
LLRF
|
18 Jun 2013 |
4367-v1 |
Booster Cogging Teststand Notes |
Craig C Drennan et al. |
Operations
|
10 May 2013 |
4363-v2 |
Plans for Booster & Linac Transformer Installation |
Ryan Crawford |
Booster
Upgrades
PIP
Linac
Upgrades
|
08 May 2013 |
3723-v13 |
Booster Beam Loss Monitor Integrator and Data Acquisition Upgrade |
Craig C Drennan |
Operations
Front-end Services
Beam Instrumentation
|
17 Apr 2013 |
4335-v1 |
Booster Transition Crossing |
Yuri Alexahin |
Booster
Beam Dynamics
PIP
|
03 Apr 2013 |
2757-v3 |
Updating Calibration Values in the Booster BPM System |
Craig C Drennan |
BPM
Upgrades
|
02 Apr 2013 |
4126-v2 |
A 1-GeV Accumulator Ring in the Booster Tunnel |
Chuck Ankenbrandt et al. |
Booster
Project X
Linac
|
13 Mar 2013 |
4313-v1 |
Plans for Booster Optics Correction |
Eliana Gianfelice-Wendt |
Booster
Beam Dynamics
|
13 Mar 2013 |
4312-v1 |
Booster Ferrite Bias Supply Upgrade |
Patrick G. Sheahan |
Booster
Upgrades
PIP
HLRF
|
13 Mar 2013 |
4304-v1 |
Update of Booster Alignment & Magnet Moves |
Kiyomi Seiya |
Booster
Beam Dynamics
PIP
|
25 Feb 2013 |
4301-v1 |
Booster Beam Notching Installation Update |
Salah Chaurize |
Booster
Beam Dynamics
Upgrades
PIP
|
25 Feb 2013 |
4282-v1 |
Design of Booster Transverse Damper |
Timofey Zolkin |
Booster
Beam Dynamics
Upgrades
PIP
|
30 Jan 2013 |
4274-v1 |
Simulation of Booster Transverse Instabilities |
Alexandru Macridin |
Booster
Beam Dynamics
PIP
|
16 Jan 2013 |
4267-v2 |
BOOSTER NOTCH ABSORBER ASSEMBLY |
Vladimir Sidorov |
Booster
PIP
|
10 Jan 2013 |
4268-v1 |
Final Update - 2012 Booster LCW Improvement Plan |
David Hixson |
Upgrades
PIP
|
09 Jan 2013 |
4266-v1 |
Refurbished Booster RF |
John S Reid |
Booster
Upgrades
PIP
HLRF
|
21 Dec 2012 |
4246-v1 |
Project Status Update |
Ken Domann et al. |
Projects
Projects
PIP
|
09 Nov 2012 |
4243-v2 |
Compensating for injection slewing with Booster corrector magnets in the Project X era |
Eric J Prebys |
Upgrades
|
25 Oct 2012 |
4237-v2 |
Linac Laser Notcher Status |
David E. Johnson et al. |
PIP
|
08 Oct 2012 |
4235-v1 |
Booster 150 KW Power Amplifier - Status Update |
Steve Kotz |
HLRF
|
03 Oct 2012 |
4229-v2 |
Progress Update - 2012 Booster LCW Improvement Plan |
David Hixson |
Operations
Upgrades
PIP
|
26 Sep 2012 |
4228-v1 |
Linac MCC/Transformer, Hatch, Booster Transformers, Anode Supply |
Ryan Crawford |
Booster
Upgrades
PIP
Linac
Upgrades
|
25 Sep 2012 |
4221-v1 |
Booster Notch Absorber Update |
Vladimir Sidorov |
Booster
PIP
|
19 Sep 2012 |
4209-v1 |
BoosterL12/Noker-L13/Absorber Update |
Salah Chaurize |
Booster
Upgrades
PIP
|
30 Aug 2012 |
4203-v1 |
PIP Booster RF Mudulators Status Update |
Rene Padilla |
HLRF
|
22 Aug 2012 |
4199-v1 |
Booster Turbo Manifold Design Analysis |
David Augustine |
Booster
Upgrades
PIP
Vacuum
|
21 Aug 2012 |
4198-v1 |
Booster Cogging Teststand Progress -- PIP Presentation |
Craig C Drennan et al. |
Upgrades
PIP
LLRF
|
20 Aug 2012 |
4195-v1 |
Linac Substation L1 & Booster Substation Y-BE2 --- Update #3 |
Ryan Crawford |
Booster
Upgrades
PIP
Linac
Upgrades
|
15 Aug 2012 |
4183-v1 |
PIP - General Info |
William A Pellico |
PIP
|
26 Jul 2012 |
3367-v1 |
Characterization of the Fast Phase Detector in the Booster LLRF System |
Craig C Drennan |
Operations
Controls
LLRF
|
24 Jul 2012 |
3889-v3 |
Linac Beam Velocity Measurement |
Craig C Drennan |
Operations
Controls
Beam Instrumentation
Front-end Systems
Operations
Beam Instrumentation
|
24 Jul 2012 |
4182-v1 |
PIP - General Info |
William A Pellico et al. |
Upgrades
PIP
|
19 Jul 2012 |
4181-v1 |
PIP - General Info |
William A Pellico |
PIP
|
18 Jul 2012 |
4180-v1 |
Second Refurbished Booster RF Cavity for 15Hz |
John S Reid |
PIP
HLRF
|
18 Jul 2012 |
4179-v1 |
Booster Bias Supply & Test Stand |
Patrick G. Sheahan |
Power Supplies
PIP
HLRF
|
18 Jul 2012 |
3922-v2 |
Booster Dual Phase Detector Module for MI Phase Lock Control |
Craig C Drennan |
LLRF
|
17 Jul 2012 |
4165-v1 |
If You Build It, They Will Come , 8GeV CW Linac: A Staged Approach |
Milorad B. Popovic |
Accelerator Seminar
Booster
Project X
Linac
|
27 Jun 2012 |
4140-v1 |
PIP - General Info and Shutdown 2012 Activities Status Report |
William A Pellico et al. |
PIP
|
30 May 2012 |
4108-v1 |
A Concept: 8 GeV CW Linac, Staged Approach |
Milorad B. Popovic |
Booster
Project X
Linac
|
10 Apr 2012 |
4106-v1 |
L13 Notched Beam Absorber Update |
Salah Chaurize |
Booster
Operations
Upgrades
PIP
|
05 Apr 2012 |
4103-v1 |
PIP Presentation on Booster Main Injector Phase Lock |
Craig C Drennan |
PIP
LLRF
|
28 Mar 2012 |
4081-v4 |
Booster Nocthing and Absorber Review |
Salah Chaurize et al. |
Booster
PIP
|
21 Mar 2012 |
4089-v1 |
Calibration of Booster BPMs using IPM, and measurement of quad center relative to BPMs |
Meghan J McAteer |
Booster
PIP
Alignment
|
14 Mar 2012 |
4084-v1 |
First Refurbished Booster RF Cavity for 15Hz |
John S Reid |
Booster
PIP
HLRF
|
07 Mar 2012 |
4083-v1 |
PIP - General Info |
William A Pellico et al. |
Booster
PIP
Linac
|
07 Mar 2012 |
4082-v1 |
PIP - Booster RF Tuner and cavity Refurbishment |
Matt Slabaugh |
Booster
PIP
HLRF
|
07 Mar 2012 |
4068-v1 |
Booster SS Driver Upgrade Update |
Tom N Kubicki |
Booster
Upgrades
PIP
|
09 Feb 2012 |
4060-v2 |
Booster 150 KW Power Amplifier |
Steve Kotz |
Booster
PIP
HLRF
|
01 Feb 2012 |
4050-v1 |
Progress in the RF/Thermal Modeling Effort of the Booster Cavity |
Mohamed H Hassan |
PIP
HLRF
|
18 Jan 2012 |
4049-v1 |
Booster Bias Supply Upgrade |
Patrick G. Sheahan |
PIP
HLRF
|
18 Jan 2012 |
4038-v1 |
Fermilab Booster Model Calibration |
Alexey Petrenko |
Booster
PIP
|
10 Jan 2012 |
4023-v1 |
Booster BPM, Daughter Trigger Generator Adjustments |
Craig C Drennan |
Beam Instrumentation
|
14 Dec 2011 |
4016-v1 |
Booster Bias Supply Upgrade |
Patrick G. Sheahan |
PIP
|
07 Dec 2011 |
4006-v1 |
Orbit response matrix measurements and model calibration for the Fermilab Booster |
Alexey Petrenko |
Booster
PIP
|
23 Nov 2011 |
3770-v2 |
Meeting Minutes: Linac and 400 MeV Beam Position Monitor Upgrade |
Craig C Drennan et al. |
Beam Instrumentation
|
23 Nov 2011 |
3999-v1 |
Booster Bias Supply and Cavity Upgrade |
Patrick G. Sheahan |
PIP
|
17 Nov 2011 |
3997-v1 |
Booster Cogging Upgrades |
Kiyomi Seiya |
Upgrades
|
16 Nov 2011 |
3996-v2 |
Booster Laser Notcher Proposal |
David E. Johnson et al. |
PIP
|
16 Nov 2011 |
3992-v1 |
Optice Measurements in the Booster |
Meghan J McAteer |
Beam Dynamics
PIP
|
09 Nov 2011 |
3989-v2 |
Booster Linear Coupling Measurement and comparison with MAD8 |
Yuri Alexahin et al. |
Studies
PIP
|
09 Nov 2011 |
3950-v4 |
Booster BLM Upgrade -- Presentation Slides |
Craig C Drennan |
Front-end Systems
ACNET
Beam Instrumentation
|
07 Nov 2011 |
3900-v3 |
A Muon Storage/Decay Ring at Fermilab, A Concept |
Milorad B. Popovic |
Booster
Recycler
Project X
Antiproton Source
|
01 Nov 2011 |
3974-v2 |
Concept: mu2e with Slow Spill from the Recycler Milorad Popovic |
Milorad B. Popovic |
Booster
Recycler
Upgrades
Project X
|
27 Oct 2011 |
3952-v1 |
Spare cavity status and tuner update |
Matt Slabaugh |
Booster
PIP
|
28 Sep 2011 |
3947-v1 |
Booster Laser Notcher Options |
David E. Johnson |
Upgrades
PIP
|
20 Sep 2011 |
3946-v1 |
Laser Notcher for Booster |
David E. Johnson |
PIP
|
19 Sep 2011 |
3801-v4 |
Beam Position Monitor Requirements in the Linac and 400 MeV Line |
Craig C Drennan |
Beam Instrumentation
Upgrades
|
12 Sep 2011 |
3935-v2 |
Proton Source Vacuum Plan |
David Augustine |
Booster
PIP
Vacuum
Linac
Vacuum
|
02 Sep 2011 |
3931-v1 |
Status Report on the Installation of Solid State Conversions for Booster Stations 1 & 2 |
Steve Kotz |
Booster
PIP
HLRF
|
31 Aug 2011 |
3930-v1 |
2012 Booster LCW Improvement Plan Overview |
David Hixson |
Booster
Operations
Upgrades
Projects
PIP
|
29 Aug 2011 |
3926-v1 |
Proton Improvement Plan -- Preliminary Overview of FY12 |
Bob Webber |
Booster
PIP
Linac
|
24 Aug 2011 |
3921-v1 |
Initial Simulations of Performance Limitations of the Booster RF Cavity |
Mohamed H Hassan |
Booster
HLRF
PIP
Electromagnetic Calculations
LLRF
|
10 Aug 2011 |
3920-v1 |
PIP- Booster RF -- Spare Cavity Status |
Matt Slabaugh |
Booster
PIP
HLRF
|
10 Aug 2011 |
3911-v1 |
TD Cost Estimate for Booster Tuners |
Thomas J Gardner |
Booster
PIP
HLRF
|
02 Aug 2011 |
3912-v1 |
Booster Modulator Upgrades |
Rene Padilla |
Booster
PIP
HLRF
|
02 Aug 2011 |
3913-v1 |
Booster Solid State Driver Upgrade |
Tom N Kubicki |
Booster
PIP
HLRF
|
02 Aug 2011 |
3903-v1 |
Proton Source Improvement Plan Overview |
Bob Webber |
Booster
Linac
|
13 Jul 2011 |
3890-v1 |
Booster BLM and BPM upgrade Meeting Minutes, Fall 2010 |
Craig C Drennan |
Front-end Systems
Beam Instrumentation
|
29 Jun 2011 |
3878-v1 |
Proton Source Improvement Plan to DOE in March 2011 |
Stuart Henderson |
Booster
Linac
|
03 Jun 2011 |
3795-v1 |
Booster BLM Tests on BLMS06 |
Craig C Drennan |
Beam Instrumentation
|
17 Mar 2011 |
3780-v1 |
Interfacing to the Booster BLM Upgrade Integrator/Digitizer VME Module |
Craig C Drennan |
Beam Instrumentation
|
17 Feb 2011 |
3768-v1 |
Booster RF Uptime and Performance |
Eric J Prebys |
HLRF
|
07 Jan 2011 |
3751-v1 |
Summary of the Tuesday Afternoon Session of the Proton Source Workshop |
Elliott S McCrory |
Beam Dynamics
|
22 Dec 2010 |
3732-v1 |
Linac and Booster Radiation Shielding Status, Plans and Constraints |
John E Anderson |
Booster
ES&H
ES&H
Linac
|
08 Dec 2010 |
3737-v1 |
Booster Operations |
Todd Sullivan |
Operations
|
08 Dec 2010 |
3730-v3 |
Linac and Booster Beam Diagnostics |
Craig C Drennan |
Beam Instrumentation
Beam Instrumentation
|
07 Dec 2010 |
3739-v1 |
Objectives of the Proton Improvement Plan |
Stuart Henderson |
Booster
Linac
|
07 Dec 2010 |
3719-v6 |
Proton Source December 2010 Workshop Agenda |
Bob Webber |
Booster
Linac
|
06 Dec 2010 |
3733-v1 |
Linac-Booster Beam Interface |
Valeri A Lebedev |
Beam Dynamics
Beam Dynamics
|
06 Dec 2010 |
3693-v1 |
Talk at all exp. meeting on Booster correctors |
William A Pellico |
Operations
|
12 Oct 2010 |
3660-v4 |
Proton Source Task Force Report |
William A Pellico |
Booster
Linac
|
26 Aug 2010 |
3644-v1 |
Microsoft Project for Booster LLRF Upgrade Schedule and Effort |
Craig C Drennan |
LLRF
|
21 Jul 2010 |
1410-v10 |
BLM Upgrade Users' Guide |
Alan Baumbaugh et al. |
Beam Loss Monitors (BLM)
TeV ABORT
Instrumentation
Beam Instrumentation
Beam Instrumentation
|
21 Jun 2010 |
3604-v1 |
Configuring the Booster LLRF System for Testing New Frequency and Phase Control Components |
Craig C Drennan |
LLRF
|
04 May 2010 |
3486-v6 |
Installation Planning for BPM-HRM Booster DAQ Extension |
Craig C Drennan |
Beam Instrumentation
|
14 Dec 2009 |
3013-v2 |
Booster BPM Documentation |
Sharon L. Lackey |
Controls
BPM
Front-end Systems
Hardware
Front-end Documentation
Beam Instrumentation
|
26 Oct 2009 |
3214-v2 |
Booster Bunch Length Monitor |
Craig C Drennan |
Beam Instrumentation
|
26 Oct 2009 |
3368-v7 |
Booster Corrector Installation Data -- Shutdown 2009 |
Craig C Drennan |
Controls
Power Supplies
|
10 Sep 2009 |
3425-v1 |
Booster LLRF Electronics Upgrade -- Electronic Design Efforts, April 2009 |
Craig C Drennan |
LLRF
|
21 Jul 2009 |
2762-v5 |
Penetrations for Corrector Cables |
Craig C Drennan |
Power Supplies
|
29 Apr 2009 |
3376-v1 |
Booster BPM Info and Measurement Summary |
James A. Fitzgerald |
Beam Instrumentation
|
27 Apr 2009 |
2974-v2 |
Mathematical Description of the Booster LLRF Controls |
Craig C Drennan |
Controls
LLRF
|
15 Apr 2009 |
2828-v4 |
Requirements for the Booster LLRF DDS Module |
Craig C Drennan et al. |
Hardware
LLRF
|
15 Apr 2009 |
3366-v1 |
Collection of Published Papers for the Booster Corrector Upgrade |
Craig C Drennan |
Booster
|
13 Apr 2009 |
3347-v1 |
Booster Collimation Revisited: A Beam Whacker as Primary Collimator |
Chuck Ankenbrandt et al. |
Booster
|
30 Mar 2009 |
3316-v1 |
The Booster Beam-Whacker |
Milorad B. Popovic |
Booster
Instrumentation
|
25 Feb 2009 |
3315-v2 |
Choices for Instrumenting Booster Corrector RTD's |
Craig C Drennan |
Operations
Controls
|
24 Feb 2009 |
3230-v1 |
Examination of the Booster Short Straight Corrector Prototype Installation |
Craig C Drennan |
Upgrades
|
20 Oct 2008 |
3205-v4 |
Pulse Stretcher Application For Measuring BDot Coils on Booster MP02 Current |
Craig C Drennan |
Booster
Beam Instrumentation
|
29 Sep 2008 |
622-v1 |
FERMILAB BOOSTER BEAM COLLIMATION AND SHIELDING |
Alexandr Drozhdin et al. |
Upgrades
Energy Deposition
|
02 Jun 2008 |
1223-v1 |
Commissioning of the Beam Collimation System at the Fermilab Booster. |
Alexandr Drozhdin et al. |
Beam Dynamics
|
02 Jun 2008 |
1944-v1 |
Fermilab Booster Dynamic Aperture Simulation with New Injection/Extraction Systems |
Alexandr Drozhdin |
Beam Dynamics
|
02 Jun 2008 |
2299-v1 |
Alignment Check for MI8 Collimators |
Bruce C. Brown |
Alignment
Transfer Lines
Collimation
|
22 Apr 2008 |
2803-v1 |
Measurement of Booster Beam Halo using the C836A and C838A Collimators in the MI8 Beamline |
Bruce C. Brown |
Beam Loss Monitors (BLM)
Proton Plan
Other
Transfer Lines
Collimation
|
22 Apr 2008 |
3063-v1 |
Test of New Stripping Foils in the Booster |
Weiren Chou et al. |
Operations
Project X
|
31 Mar 2008 |
2988-v1 |
Impact of Electric Current Fluctuations Arising from Power Supplies on Charged-Particle Beams |
Phil S. Yoon |
Instabilities
Beam Dynamics
Power Supplies
Multiparticle
|
24 Jan 2008 |
2883-v1 |
Booster RF Repetition Rate Limit |
Robert J. Ducar et al. |
Proton Plan
Upgrades
Projects
HLRF
|
26 Sep 2007 |
2859-v11 |
Booster Corrector Installation Data -- Shutdown 2007 |
Craig C Drennan |
Controls
Power Supplies
Upgrades
|
19 Sep 2007 |
1881-v5 |
SPECIFICATION FOR THE BOOSTER CORRECTOR MAGNETS AND POWER SUPPLIES |
Craig C Drennan |
Controls
|
19 Jul 2007 |
2792-v7 |
Minutes of the Booster Corrector Prototype Test Planning Meeting |
Craig C Drennan |
Upgrades
|
05 Jul 2007 |
2804-v1 |
Proton Plan Booster Corrector Upgrade -- Directors Review Aug. 2006 |
Craig C Drennan |
Upgrades
|
11 Jun 2007 |
2632-v3 |
Coordinate System for New Booster Corrector Magnet System |
Craig C Drennan et al. |
Beam Dynamics
Operations
Controls
Upgrades
|
30 May 2007 |
2791-v1 |
System Overview for the Multi-element Corrector Magnets and Controls for the Fermilab Booster. |
Craig C Drennan |
Upgrades
|
29 May 2007 |
1883-v2 |
Booster Floor Plan Markup for New Corrector System |
Craig C Drennan |
Power Supplies
|
14 May 2007 |
2773-v3 |
Booster Corrector Power Cable Installation Details |
Craig C Drennan |
Power Supplies
|
14 May 2007 |
2734-v2 |
Booster Long Straight Corrector Package Installation |
Craig C Drennan |
Upgrades
|
24 Apr 2007 |
2713-v1 |
Web Link to Tech Division for Booster Corrector Thermal Studies |
David J. Harding |
Upgrades
|
22 Mar 2007 |
2712-v1 |
BMA000 Magnetic Measurements -- Excerpts from Oct. 2006 Tech. Review |
Phil Schlabach |
Upgrades
|
22 Mar 2007 |
2711-v1 |
Booster Corrector Prototype BMA000 -- Field Strength Test Results |
Phil Schlabach |
Upgrades
|
22 Mar 2007 |
2707-v1 |
Some Understandings on Radial Motion at Transition in the Fermilab Booster |
Xi Yang |
Booster
Longitudinal Dynamics
|
20 Mar 2007 |
2700-v1 |
Transformer Test Results BMA001 |
Craig C Drennan |
Operations
|
19 Mar 2007 |
2686-v1 |
Proposal of RF manipulation in Booster |
William A Pellico et al. |
Booster
Longitudinal Dynamics
Beam Physics
Upgrades
|
12 Mar 2007 |
2590-v1 |
Booster 3-D simulations |
Alexandr Drozhdin et al. |
Booster
Beam Dynamics
Beam Physics
|
16 Dec 2006 |
2584-v1 |
The Measurements and Analysis of Electromagnetic Interference arising from the Booster GMPS |
Weiren Chou et al. |
Power Supplies
Beam Instrumentation
|
11 Dec 2006 |
2548-v1 |
Report from Booster Corrector Review |
Thomas H Nicol et al. |
Proton Plan
Upgrades
|
08 Nov 2006 |
2520-v3 |
Booster Corrector Magnet -- Measurement of Mutual Inductance |
Craig C Drennan |
Beam Dynamics
|
20 Oct 2006 |
2529-v1 |
Reducing the momentum spread of 8-GeV Booster beams via the excitation of the bunch length oscillation (simulation results) |
Alexandr Drozhdin et al. |
Booster
Longitudinal Dynamics
Technology
|
18 Oct 2006 |
2444-v3 |
Simulation of transition crossing in the Fermilab Booster |
Alexandr Drozhdin et al. |
Accelerator Seminar
Beam Dynamics
Longitudinal Dynamics
|
12 Oct 2006 |
2491-v1 |
The Understanding and Analysis of the Booster Magnet Survey Data |
Peter Kasper et al. |
Alignment
|
02 Oct 2006 |
1882-v4 |
New Booster Corrector Magnet Power Amplifier Controls Specification |
Craig C Drennan |
Power Supplies
|
16 Aug 2006 |
2341-v1 |
Booster 30 Hz/Gamma-t Review |
Eric J Prebys |
Proton Plan
|
11 Jul 2006 |
2339-v1 |
Prospective Gains from Gamma-t Jump and 2nd Harmonic Magnet Ramp in Fermilab Booster |
James A. MacLachlan |
Beam Dynamics
Studies
Proton Plan
Upgrades
Projects
|
11 Jul 2006 |
1783-v3 |
Proton Source Scaling Laws |
Dave McGinnis |
Proton Plan
Projects
SNuMi
|
13 May 2006 |
2240-v1 |
Rep. Rate and Beam Quality Issues for the Booster in the SNuMI Era |
Eric J Prebys |
Upgrades
SNuMi
|
17 Apr 2006 |
2178-v2 |
First Report of the Proton Study Group |
Sergei Nagaitsev et al. |
Operations
Other
General
Upgrades
SY120
|
03 Apr 2006 |
2221-v1 |
Proposed Booster bpm geometry |
James L. Crisp |
BPM
Upgrades
Beam Instrumentation
|
03 Apr 2006 |
2112-v2 |
Optimum Booster ORBUMP Magnet Configuration |
Eric J Prebys |
Upgrades
|
01 Feb 2006 |
2085-v1 |
Calibration of the Booster BPM System |
Bob Webber |
BPM
BPM
Beam Instrumentation
|
28 Dec 2005 |
2045-v1 |
Booster Cogging |
Robert M Zwaska |
Extraction Lattice
LLRF
|
08 Dec 2005 |
2027-v1 |
IPM measurments at the Fermilab Booster |
S. Y. Lee |
Accelerator Seminar
|
18 Nov 2005 |
2000-v1 |
BLM System Control Bus Testing |
Kelly L Knickerbocker |
Beam Loss Monitors (BLM)
Instrumentation
Beam Instrumentation
Beam Instrumentation
|
31 Oct 2005 |
1994-v1 |
BLM VME J2 Backplane Impedance |
Kelly L Knickerbocker |
Beam Loss Monitors (BLM)
Instrumentation
Beam Instrumentation
Beam Instrumentation
|
31 Oct 2005 |
1992-v1 |
Proton Intensity Improvements for MINOS |
Dave McGinnis |
Upgrades
Accumulator
Stochastic Cooling
Alignment
|
14 Oct 2005 |
1900-v1 |
Report to the Fermilab Director by the Proton Committee |
Chuck Ankenbrandt et al. |
Operations
General
Upgrades
MiniBooNE
|
18 Jul 2005 |
1868-v1 |
A Proposed Extraction System for the Fermilab Booster |
Chuck Ankenbrandt et al. |
Extraction Lattice
|
10 Jun 2005 |
1847-v2 |
Booster Cogging at PAC 05 |
Sacha E. Kopp et al. |
LLRF
|
27 May 2005 |
1784-v1 |
A Proposed H- Injection System for the Fermilab Booster |
Milorad B. Popovic |
Other
|
20 Apr 2005 |
1736-v1 |
BLM VME J2 Backplane Crosstalk Evaluation |
Kelly L Knickerbocker |
Beam Loss Monitors (BLM)
Instrumentation
Beam Instrumentation
Beam Instrumentation
|
16 Mar 2005 |
1564-v1 |
Longitudinal Effects in the Fermilab Booster |
Chuck Ankenbrandt et al. |
Studies
|
18 Feb 2005 |
1573-v1 |
Multipole fields in Booster extraction septum MP02 |
Ming-jen Yang |
Extraction Lattice
Transfer Lines
|
11 Feb 2005 |
1455-v1 |
GMPS Current Regulator ACNET Parameters |
Alex Waller et al. |
Power Supplies
Front-end Systems
Power Supplies
|
15 Nov 2004 |
1441-v1 |
The Proton Plan |
Bruce Baller et al. |
Project
Upgrades
Projects
RF
|
11 Nov 2004 |
1439-v1 |
Effect of Longitudinal Translation of a Quadrupole Magnet on the Downstream Amplitude Function |
Michael J. Syphers |
Optics
|
09 Nov 2004 |
1430-v2 |
Booster Corrector System Specification |
David J. Harding et al. |
Controls
Upgrades
Projects
|
05 Nov 2004 |
1295-v1 |
Combined ESME-ORBIT Space-Charge Simulation for the Booster |
Phil S. Yoon |
Beam Dynamics
Beam Dynamics
Longitudinal Dynamics
Transverse Dynamics
|
06 Aug 2004 |
1277-v1 |
Booster Cogging: Synchronization with the Main Injector for NuMI & Slip-Stacking |
Robert M Zwaska |
Commissioning
Commissioning
LLRF
LLRF
|
29 Jul 2004 |
1266-v1 |
GMPS VXI Regulator Documentation |
Bob Webber |
Power Supplies
Power Supplies
|
20 Jul 2004 |
1241-v1 |
Synchronization of the Fermilab Booster and Main Injector for Multiple |
Sacha E. Kopp et al. |
LLRF
Projects
LLRF
|
01 Jul 2004 |
1220-v1 |
Booster Collimator System |
Dean A. Still et al. |
Other
|
29 Jun 2004 |
1042-v1 |
Analysis of Tevatron Complex Reliability |
Elliott S McCrory |
None
|
25 Feb 2004 |
1036-v1 |
Beam to NuMI |
Peter Kasper |
Primary Proton Beam
|
24 Feb 2004 |
1022-v1 |
Booster Rookie Book |
Bruce W Worthel |
Training Docs
|
13 Feb 2004 |
930-v1 |
The Booster Monitor Program at Fermilab: Data Retrieval and Analysis |
Chandra CLJ Jacobs |
Controls
Java Data Acquisition
Beam Instrumentation
|
04 Dec 2003 |
918-v1 |
Talks given at NBI2003 in KEK by Bob Zwaska |
Robert M Zwaska |
Commissioning
Monitoring Instrumentation
Commissioning
Primary Proton Beam
Upgrades
Extraction from Main Injector
Dampers
|
18 Nov 2003 |
879-v1 |
Measurement of the Electron Loss Cross Sections for Negative Hydrogen Ions on Carbon at 200 MeV |
Carlos F Hojvat et al. |
Beam Dynamics
Operations
Other
|
20 Oct 2003 |
859-v1 |
Booster cogging for multiple batch operation of the Main Injector |
William A Pellico et al. |
Commissioning
Studies
Primary Proton Beam
Project
Projects
LLRF
|
02 Oct 2003 |
850-v1 |
Booster Space Charge Modeling/Simulations Review |
Chuck Ankenbrandt |
None
|
26 Sep 2003 |
767-v1 |
LabVIEW VI Upgrades on the IPM Systems at Fermilab |
Thomas Spears |
Beam Instrumentation
Ion Profile Monitor
Beam Instrumentation
Beam Instrumentation
|
08 Aug 2003 |
293-v1 |
Optics and Field Error Compensation in the FNAL Permanent Magnet 8.9 GeV/c Proton Transfer Line |
John A. Johnstone |
Lattice
Magnets
|
17 Jul 2003 |
148-v2 |
AP4 Beam Dump and Allowed Beam Intensity Limit During the Construction Phase of theMI-8 GeV Beam-line |
Chandrashekhara M. Bhat |
Beam Dynamics
ES&H
|
10 Jul 2003 |
667-v1 |
Booster Loss Monitor Data Logger |
Kevin Cahill |
Data Loggers
Java Data Acquisition
|
10 Jun 2003 |
632-v1 |
Fermilab Booster Modeling and Space Charge Study |
Weiren Chou et al. |
Beam Dynamics
Studies
Ion Profile Monitor
Upgrades
Multiparticle
|
28 May 2003 |
619-v1 |
Synergia project review talk part III: FNAL Booster Modeling and Data Comparisons |
James F. Amundson et al. |
Beam Dynamics
|
27 May 2003 |
617-v1 |
Committee Charge and Project Abstract for Booster Simulations Review |
Pushpalatha C. Bhat |
Other
|
27 May 2003 |
495-v2 |
Calibrating the Booster Ionization Profile Monitor: Preliminary Summary |
James F. Amundson et al. |
Beam Instrumentation
|
09 May 2003 |
581-v1 |
Booster beam profiles (IPM) and losses before and after dogleg and ORBUMP changes |
James F. Amundson et al. |
Beam Dynamics
|
30 Apr 2003 |
516-v1 |
Proton Source Department Meeting, March 12, 2003 |
Elliott S McCrory |
Operations
Operations
|
20 Mar 2003 |
515-v1 |
Proton Economics |
Elliott S McCrory |
Operations
Operations
|
20 Mar 2003 |
506-v2 |
Booster Dogleg Studies (Run II Meeting) |
Eric J Prebys |
Studies
Run II
|
13 Mar 2003 |
498-v1 |
Space charge studies and comparison with simulations using the FNAL Booster |
James F. Amundson et al. |
Studies
|
11 Mar 2003 |
497-v1 |
Synergia Update 03/06/03 |
James F. Amundson et al. |
Beam Dynamics
|
11 Mar 2003 |
496-v1 |
Booster tune shift study due to space charge effects, using resonance scans. |
James F. Amundson et al. |
Studies
|
11 Mar 2003 |
470-v1 |
Proton Source Dept Meeting: Using the BD Docs Database |
Elliott S McCrory |
Other
|
25 Feb 2003 |
462-v1 |
Focusing Properties of The Booster Extraction Septa |
Bruce C. Brown et al. |
Magnets
Extraction Lattice
Transfer Lines
|
21 Feb 2003 |
747-v1 |
Slip Stacking at Low Intensity Status of the Beam Studies |
Kiyomi Seiya |
Beam Dynamics
LLRF
RF
Beam Instrumentation
Studies
|
03 Feb 2003 |
408-v1 |
Measured Longitudinal Beam Impedance of Booster Gradient Magnets |
James L. Crisp et al. |
Magnets
|
27 Jan 2003 |
360-v1 |
Notes for MI/RR Group Meeting of 16 Sep 2002 |
Bruce C. Brown |
Beam Dynamics
MI-RR-Group
RF
|
13 Jan 2003 |
333-v2 |
Main Injector Commissioning Plan |
C. Shekhar Mishra |
Commissioning
Operations
Beam Instrumentation
|
22 Jul 1998 |
306-v1 |
Can Magnetic Fields Assist in Radiation Shielding for 8 GeV Proton Beams |
Bruce C. Brown |
ES&H
ES&H
Energy Deposition
|
15 Aug 1997 |
62-v1 |
Minutes from the First Main Injector 'Review' Meeting May 29, 1991 |
Philip S. Martin |
Extraction
Lattice
Transfer Lines
|
29 May 1991 |