1453-v2 |
Measuring and Adjusting Accumulator Tunes |
Brian E. Drendel |
Accumulator
Operations
Instrumentation
Lattice
Beam Dynamics
|
30 Apr 2020 |
3220-v2 |
Preparation of Accelerator Complex for Muon Physics Experiments at Fermilab |
Chuck Ankenbrandt et al. |
Antiproton Source
|
28 Oct 2008 |
3236-v0 |
Accelerator Division Impact Statement for the Mu2e Proposal |
Michael J. Syphers |
External Beams
Antiproton Source
|
27 Oct 2008 |
2825-v4 |
Correcting the Accumulator Extraction Energy and Phase |
Steve Werkema |
RF
LLRF
|
28 Jul 2008 |
2824-v1 |
Stacktail Beam Transfer Function Measurement Procedure |
Steve Werkema |
Stochastic Cooling
|
26 Jun 2007 |
2787-v1 |
More Rebunching Options for the mu2e Conversion Experiments |
David V Neuffer |
Longitudinal Dynamics
Debuncher
|
21 May 2007 |
2783-v1 |
Recent Lattice Developments in the Antiproton Source |
Vladimir Nagaslaev |
Lattice
|
17 May 2007 |
2415-v1 |
Correct the Accumulator Extraction Energy |
Steve Werkema |
Accumulator
|
25 Aug 2006 |
2245-v1 |
Antiproton Source Studies and Stacking |
Keith E Gollwitzer |
Studies/Commissioning
Accumulator
Stochastic Cooling
Instrumentation
Accelerator Seminar
Transfer Lines
Debuncher
Lattice
|
18 Apr 2006 |
2173-v2 |
Innovative Beam Physics for High Luminosity at Hadron Colliders |
Chandrashekhara M. Bhat |
Longitudinal Dynamics
Beam Studies
Accumulator
Beam Dynamics
Beam Dynamics
|
26 Feb 2006 |
2009-v5 |
Optimizing Pbar Kicker Timing While Stacking |
Brian E. Drendel |
Accumulator
Operations
Magnets
Debuncher
|
07 Nov 2005 |
1782-v7 |
A 2 MegaWatt Multi-Stage Proton Accumulator |
Dave McGinnis |
Future Accelerators
|
03 Nov 2005 |
1988-v3 |
Align Debuncher and Accumulator Bend Fields |
Brian E. Drendel |
Accumulator
Training Docs
Debuncher
|
20 Oct 2005 |
1992-v1 |
Proton Intensity Improvements for MINOS |
Dave McGinnis |
Accumulator
Stochastic Cooling
Alignment
Upgrades
|
14 Oct 2005 |
1948-v1 |
Model of Antiproton Stack Size Versus Rapid Transfer Time |
Dave McGinnis |
Accumulator
Operations
|
05 Sep 2005 |
1942-v1 |
Stacking Monitor and the 4-8 GHz Stacking Thermostat |
Dave McGinnis |
Accumulator
Training Docs
Instrumentation
|
30 Aug 2005 |
1429-v2 |
Stacking and SY120 Pulses |
Dave McGinnis |
Accumulator
SY120
|
04 Nov 2004 |
1395-v4 |
Schemes for Producing High Intensity Low-longitudinal Emittance Proton Bunches for the Tevatron Collider |
Chandrashekhara M. Bhat |
Beam Dynamics
|
09 Oct 2004 |
1157-v1 |
Redefining MI 8 GeV Energy, a Proposal |
David E. Johnson |
Operations
|
04 May 2004 |
1140-v1 |
Redefining MI 8 GeV Energy to Maximize Pbar Production |
David E. Johnson |
Operations
Operations
|
23 Apr 2004 |
571-v1 |
Equalizers for Accumulator Core Cooling Upgrade |
Ding Sun |
RF
|
29 Apr 2003 |
744-v1 |
Simulation of Pbar Stacking and Un-Stacking in the Recycler Ring |
Chandrashekhara M. Bhat |
RF
Beam Instrumentation
Studies
Beam Dynamics
|
01 Sep 2002 |
362-v1 |
Pbar Acceleration in the Main Injector RR/AR - MI - Tevatron - Simulations and Tune up Studies Using Protons |
Chandrashekhara M. Bhat |
RF
Beam Instrumentation
Studies
|
20 Nov 2000 |
354-v1 |
Pbar Acceleration in the Main Injector for Run II: ESME Simulations |
Chandrashekhara M. Bhat et al. |
RF
Beam Instrumentation
Studies
|
26 Jul 2000 |
175-v1 |
Filter Momentum Cooling for the Recycler |
John P. Marriner |
Beam Dynamics
Stochastic Cooling
|
05 Apr 1996 |
172-v1 |
Stochastic Cooling of the Recycler Antiproton Stack Momentum Spread Including Intrabeam Scattering and Barrier Buckets |
Gerald P. Jackson |
Stochastic Cooling
|
29 Mar 1996 |
26-v2 |
MI_15 Kicker Specifications |
David E. Johnson |
Extraction
Transfer Lines
Magnets
|
17 Apr 1990 |