3629-v1 |
Loss and Residual Radiation at MI400 for 2010 Shutdown Preparation |
Bruce C. Brown |
Beam Instrumentation
Beam Loss Monitors (BLM)
Operations
Collimation
|
27 May 2020 |
3857-v1 |
Main Injector Counterwave Properties and MI300 Collimator Motion Limits |
Bruce C. Brown |
Lattice
Transfer Lines
Collimation
Console Applications
Transfer Lines
|
27 May 2020 |
2618-v1 |
First Results from MI8 Collimator Use |
Phil Adamson et al. |
Studies
Transfer Lines
Collimation
ES&H
|
22 May 2020 |
1926-v2 |
Reducing Losses in Main Injector by MI8 Line Scraping |
Bruce C. Brown et al. |
Studies
Transfer Lines
Collimation
Electron Cooling
|
18 May 2020 |
469-v3 |
Notes for MI/RR Group Meeting of 24 Feb 2003 |
Bruce C. Brown |
Transfer Lines
Vacuum
MI-RR-Group
Studies
|
23 Apr 2020 |
468-v4 |
Notes for MI/RR Group Meeting of 19 Feb 2003 |
Bruce C. Brown |
RF
Beam Instrumentation
Transfer Lines
Beam Dynamics
MI-RR-Group
Studies
|
23 Apr 2020 |
367-v3 |
Determining the Radius and Energy of the Recycler Ring |
Ioanis Kourbanis |
RF
Beam Instrumentation
Studies
BPM
|
03 Oct 2019 |
6631-v1 |
Longitudinal Scans of Residual Radiation in MI Collimators C307 and C308 |
Bruce C. Brown |
Energy Deposition
Collimation
|
22 Aug 2018 |
5301-v4 |
Achievable Aperture Improvements for the Recycler |
Bruce C. Brown et al. |
Magnets
Lattice
|
30 Dec 2016 |
4982-v2 |
Aperture Implications for Recycler Assuming Full Coupling and Nominal Vertical Apertures |
Bruce C. Brown |
Collimation
Collimation
Lattice
|
12 May 2016 |
3993-v1 |
Booster Alignment & Magnet Moves |
Kiyomi Seiya |
Alignment
PIP
|
09 Nov 2011 |
3959-v1 |
Stability of Non-Linear Integrable Accelerator |
Ivan Batalov et al. |
Adv. Accelerator R&D
|
30 Sep 2011 |
1944-v1 |
Fermilab Booster Dynamic Aperture Simulation with New Injection/Extraction Systems |
Alexandr Drozhdin |
Beam Dynamics
|
02 Jun 2008 |
2287-v1 |
Mechanical Design of MI8 Collimators |
Bruce C. Brown et al. |
Transfer Lines
Collimation
|
22 Apr 2008 |
2769-v1 |
Results of pre-WQB installation Lambertson Scans |
David E. Johnson et al. |
Lattice
Transfer Lines
Alignment
|
04 May 2007 |
2479-v2 |
Operational Aspects of the MI Large Aperture Quadrupole (WQB) |
Weiren Chou |
Proton Plan
Magnets
|
14 Nov 2006 |
2091-v1 |
BEAM BASED ALIGNMENT OF THE DEBUNCHER INJECTION SEPTUM |
Dave McGinnis |
Transfer Lines
Debuncher
|
08 Jan 2006 |
1478-v2 |
Some Notes on Tevatron Beam Lifetimes and Longitudinal Emittances |
Michael J. Syphers |
RF
Longitudinal Dynamics
Emittance
|
01 Dec 2004 |
1013-v1 |
Report of the Review of the BTeV Interaction Point - October 7, 2003 |
Michael J. Syphers |
CZero IR Development
|
11 Feb 2004 |
941-v2 |
Proposal for B0 IR Quadrupole Moves |
Vladimir Shiltsev et al. |
Alignment
|
12 Dec 2003 |
33-v1 |
Dynamic Aperture with gamma_t Jump |
Rodney E. Gerig |
Beam Dynamics
|
14 Aug 2003 |
169-v1 |
Recycler Pbar Transfer Lines |
David E. Johnson |
Transfer Lines
|
01 Aug 2003 |
45-v1 |
Physical Aperture and Beamline Matching Criteria for the Main Injector |
Stephen D. Holmes et al. |
Lattice
Beam Dynamics
|
30 Jun 2003 |
71-v1 |
Simulation of the Dynamical Performance of the Main Injector at 8.9 GeV |
Fady A. Harfoush et al. |
Studies
Lattice
|
12 Jun 2003 |
42-v1 |
Main Injector Quadrupoles: Magnetic Design Issues |
Jean-Francois Ostiguy |
Magnets
|
10 Jun 2003 |
643-v1 |
Simulations of Octupole Compensation of head-tail instability at the Tevatron |
MeiQin Xiao |
General
Transverse Dynamics
|
02 Jun 2003 |
391-v1 |
Notes for MI/RR Group Meeting of 09 Dec 2002 |
Bruce C. Brown |
MI-RR-Group
Commissioning
|
14 Jan 2003 |
390-v1 |
Notes for MI/RR Group Meeting of 04 Dec 2002 |
Bruce C. Brown |
MI-RR-Group
Commissioning
|
14 Jan 2003 |
389-v1 |
Notes for MI/RR Group Meeting of 27 Nov 2002 |
Bruce C. Brown |
MI-RR-Group
Studies
|
14 Jan 2003 |
377-v1 |
Transverse Beam Profile with Scraper Scans |
Daniel R. Broemmelsiek et al. |
Beam Instrumentation
Beam Dynamics
|
11 Oct 2002 |
371-v1 |
Recycler Admittance Measurements |
Daniel R. Broemmelsiek et al. |
Beam Dynamics
|
29 Jul 2002 |
366-v2 |
Recycler Ring Aperture Scan: Summary of Results |
Saeed Assadi et al. |
Studies
|
31 Dec 2000 |
338-v1 |
Recycler Quadrupole Magnetic Designs |
George W. Foster |
Magnets
Magnets
|
24 Sep 1998 |
297-v1 |
Dynamic Aperture for the Recycler Lattices RRv16 and RRv17 |
Norman M. Gelfand |
Beam Dynamics
Lattice
|
18 Jul 1997 |
233-v2 |
Effect of the Measured Sextupole Moment of the Recycler Magnets on the Chromaticity and the Dynamic Aperture |
Norman M. Gelfand |
Magnets
Magnets
|
11 Dec 1996 |
232-v1 |
Characteristics of the RRv9 Lattice as Determined from Tracking and Calculations of the Effects of the High Order Multiple Moments Listed in MI-0170 |
Norman M. Gelfand |
Magnets
Lattice
|
05 Dec 1996 |
171-v2 |
MI-10 Injection Layout |
David E. Johnson |
Transfer Lines
Civil
|
17 May 1996 |
103-v1 |
BPM Alignment Tolerance Considerations |
Philip S. Martin |
Beam Instrumentation
Alignment
|
07 Jan 1994 |
131-v1 |
Specifications for the Main Injector Horizontal Correction Elements |
David E. Johnson |
Design Properties
Magnets
Magnets
|
03 Sep 1993 |
89-v1 |
Study of the Fermilab Main Injector Lattice |
Fady A. Harfoush et al. |
Studies
Lattice
|
25 Aug 1993 |
85-v1 |
Transparencies from 150 GeV Line Status Review |
Management of Main Injector Project |
Beam Instrumentation
Transfer Lines
Beam Dynamics
|
21 Jul 1993 |
75-v1 |
Beamline Errors and Corrector Strengths |
David E. Johnson |
Beam Dynamics
Magnets
|
14 Aug 1992 |
60-v1 |
Design and Multiparticle Simulation of the Half Integer Slow Extraction System for the Main Injector |
Michael Harrison et al. |
Extraction
|
06 May 1991 |
61-v1 |
Examination of the Stability of the Advanced Imaginary gamma_t Lattice |
S. Y. Lee et al. |
Studies
Lattice
Beam Dynamics
|
06 May 1991 |
53-v1 |
2D Magnetostatic Field Representations on a Rectangular Region |
Jean-Francois Ostiguy |
Magnets
Magnets
|
22 Feb 1991 |
26-v2 |
MI_15 Kicker Specifications |
David E. Johnson |
Extraction
Transfer Lines
Magnets
|
17 Apr 1990 |