8859-v1 |
Particle Scattering in the Residual Gas |
Valeri A Lebedev |
Transverse Dynamics
Beam Physics
|
17 Nov 2020 |
3523-v1 |
Residual Radiation Monitoring in the Main Injector with the ROTEM RAM DA3-2000 Radiation Survey Meter |
Bruce C. Brown |
Other
|
27 May 2020 |
3629-v1 |
Loss and Residual Radiation at MI400 for 2010 Shutdown Preparation |
Bruce C. Brown |
Beam Instrumentation
Beam Loss Monitors (BLM)
Operations
Collimation
|
27 May 2020 |
4519-v1 |
Studies of MI Beam Intensity, Loss and Activation Patterns |
Bruce C. Brown |
Beam Instrumentation
ES&H
DCCTs
|
27 May 2020 |
2618-v1 |
First Results from MI8 Collimator Use |
Phil Adamson et al. |
Studies
ES&H
Transfer Lines
Collimation
|
22 May 2020 |
1977-v1 |
MI8 Beamline Collimation Design |
Bruce C. Brown |
Transfer Lines
Collimation
|
18 May 2020 |
4867-v3 |
Calibration of BLM Response to Proton Loss |
Bruce C. Brown |
Beam Instrumentation
Beam Loss Monitors (BLM)
ES&H
Collimation
|
10 Mar 2020 |
12-v1 |
MI-Transition Crossing ESME Simulation |
S. Alex Bogacz |
RF
Beam Dynamics
|
07 Feb 2020 |
372-v2 |
Calibration of the Recycler Transverse Schottky Detectors |
Martin J. Hu |
ACNET
Schottky
Beam Instrumentation
|
26 Sep 2019 |
7540-v1 |
Radiation Studies for Main Injector Activation Using MARS in a `Toy Model' |
Phil Adamson et al. |
Beam Physics
Main Injector
|
09 Aug 2019 |
4046-v3 |
Activation of Steel and Copper Samples in the Main Injector Collimator Region |
Bruce C. Brown |
ES&H
Energy Deposition
Collimation
|
01 Jun 2017 |
5040-v2 |
Magnetic Control of Fermilab Switchyard Beam Splits |
Adam Watts |
External Beams
Transverse Dynamics
SY120
|
24 Feb 2016 |
4692-v1 |
Loss History in Main Injector: LI619A-LI621 and LI101C-LI107 |
Bruce C. Brown |
Beam Loss Monitors (BLM)
BPM
Operations
|
28 Oct 2014 |
2201-v4 |
Beam collimation in the transfer line from 8~GeV linac to the Main Injector |
Alexandr Drozhdin |
Project
Proton Plan
Collimation
|
27 Jan 2012 |
3780-v1 |
Interfacing to the Booster BLM Upgrade Integrator/Digitizer VME Module |
Craig C Drennan |
Beam Instrumentation
|
17 Feb 2011 |
3295-v1 |
Improved Measurement of Main Injector Collimation Efficiency for Uncaptured Beam |
Bruce C. Brown |
Beam Loss Monitors (BLM)
Proton Plan
Collimation
|
02 Feb 2009 |
2330-v1 |
Beam collimation in the Main Injector at Slip-Stacking Injection |
Bruce C. Brown et al. |
Project
Collimation
|
09 Jan 2009 |
2329-v1 |
Beam Loss Simulation in the Main Injector at Slip-Stacking Injection |
Bruce C. Brown et al. |
Project
Collimation
|
09 Jan 2009 |
3219-v1 |
Analysis of Some Crude Main Injector Radiation Cool-down Data |
Bruce C. Brown |
ES&H
Operations
|
03 Oct 2008 |
3127-v1 |
Beam Loss in the Superconducting Quadrupoles of Extraction Line for 14 mrad Crossing Angle |
Alexandr Drozhdin et al. |
ILCTA
|
20 Jun 2008 |
1223-v1 |
Commissioning of the Beam Collimation System at the Fermilab Booster. |
Alexandr Drozhdin et al. |
Beam Dynamics
|
02 Jun 2008 |
1233-v1 |
NUMERICAL SIMULATIONS AND ANALYSES OF BEAM-INDUCED DAMAGE TO THE TEVATRON COLLIMATORS |
Alexandr Drozhdin et al. |
Collimators
|
02 Jun 2008 |
1234-v2 |
Tevatron Run-II Beam Collimation System Performance |
Alexandr Drozhdin et al. |
Collimators
|
02 Jun 2008 |
1235-v1 |
NUMERICAL SIMULATIONS AND ANALYSES OF BEAM-INDUCED DAMAGE TO THE TEVATRON COLLIMATORS |
Alexandr Drozhdin et al. |
Collimators
|
02 Jun 2008 |
1231-v2 |
MODELING OF BEAM LOSS IN TEVATRON AND BACKGROUNDS IN THE BTEV DETECTOR |
Alexandr Drozhdin et al. |
CZero IR Development
|
02 Jun 2008 |
1232-v3 |
The GTeV Forward Spectrometer Acceptance Studies |
Alexandr Drozhdin et al. |
DZero Forward Proton Detector
|
02 Jun 2008 |
2198-v1 |
Beam collimation in the Main Injector |
Bruce C. Brown et al. |
Project
Collimation
|
02 Jun 2008 |
2199-v1 |
Painting injection at 8~GeV to the Main Injector |
Alexandr Drozhdin |
Project
Beam Dynamics
|
02 Jun 2008 |
1944-v1 |
Fermilab Booster Dynamic Aperture Simulation with New Injection/Extraction Systems |
Alexandr Drozhdin |
Beam Dynamics
|
02 Jun 2008 |
2332-v1 |
Beam Loss in the ILC Extraction Line for 14 mrad Crossing Angle |
Alexandr Drozhdin et al. |
Future Accelerators
|
02 Jun 2008 |
2333-v1 |
Beam Loss in the ILC Extraction Line for 2 mrad Crossing Angle |
Alexandr Drozhdin et al. |
Future Accelerators
|
02 Jun 2008 |
1930-v1 |
Un-suppressing MI30 dispersion function for momentum scraping |
David E. Johnson et al. |
Lattice
Operations
Collimation
|
22 Apr 2008 |
1960-v1 |
Potential MI Collimation Scheme with MI30 Dynamic Dispersion Insert |
David E. Johnson |
Lattice
Collimation
|
22 Apr 2008 |
2261-v2 |
Potential Collimation Scheme using a Dynamic Dispersin Bump In MI30 Straight |
David E. Johnson |
Lattice
Collimation
|
22 Apr 2008 |
2316-v1 |
Thoughts on Collimation |
David E. Johnson |
Other
Collimation
|
22 Apr 2008 |
2315-v3 |
Dynamic Dispersion for Main Injector Collimation |
David E. Johnson |
Lattice
Collimation
|
22 Apr 2008 |
2388-v2 |
Thermal Calculation for MI8 Collimators |
Bruce C. Brown et al. |
Transfer Lines
Collimation
|
22 Apr 2008 |
2803-v1 |
Measurement of Booster Beam Halo using the C836A and C838A Collimators in the MI8 Beamline |
Bruce C. Brown |
Beam Loss Monitors (BLM)
Proton Plan
Other
Transfer Lines
Collimation
|
22 Apr 2008 |
336-v1 |
Shielding Assessment of the Main Injector Complex |
Chandrashekhara M. Bhat et al. |
Studies
|
19 Nov 2007 |
2564-v1 |
BEAM-INDUCED DAMAGE TO THE TEVATRON COMPONENTS AND WHAT HAS BEEN DONE ABOUT IT |
Paul PCC Czarapata et al. |
Collimators
Energy Deposition
|
23 May 2007 |
2740-v1 |
H- Stripping Equations and Application to the High Intensity Neutrino Source. |
Jean-Paul Carneiro |
Proton Driver
Adv. Accelerator R&D
|
11 Apr 2007 |
2674-v1 |
Main Injector stray beam clearing options |
Ming-jen Yang |
Operations
|
05 Mar 2007 |
2172-v1 |
Recycler and MI Momentum Aperture |
David E. Johnson |
Studies
SNuMi
Studies
|
24 Feb 2006 |
1940-v3 |
Mask at MI Q301 |
David E. Johnson |
Operations
|
02 Sep 2005 |
1938-v1 |
Impact of beam loss in MI 30 Straight Section on ECOOL |
David E. Johnson |
Operations
|
23 Aug 2005 |
1382-v2 |
Residual Radiation Hints for Aperture and Alignment Issues in the Main Injector |
Bruce C. Brown |
Alignment
ES&H
Vacuum
|
18 Jan 2005 |
1277-v1 |
Booster Cogging: Synchronization with the Main Injector for NuMI & Slip-Stacking |
Robert M Zwaska |
LLRF
Commissioning
LLRF
Commissioning
|
29 Jul 2004 |
1150-v3 |
Recycler transverse instability |
Sergei Nagaitsev |
Beam Dynamics
|
07 May 2004 |
1036-v1 |
Beam to NuMI |
Peter Kasper |
Primary Proton Beam
|
24 Feb 2004 |
976-v1 |
Meeting on Tev abort gap losses and CDF |
Jean Slaughter et al. |
Meetings
Instrumentation
|
14 Jan 2004 |
63-v2 |
Transition Crossing with Positive Chromaticity - A Proposed Main Ring Measurement of alpha_1 vs Chromaticity |
S. Alex Bogacz et al. |
Lattice
|
14 Aug 2003 |
43-v1 |
Comments on the Behavior of alpha_1 in Main Injector gamma_t Jump Schemes |
S. Alex Bogacz et al. |
Beam Dynamics
|
14 Aug 2003 |
105-v1 |
Radiation Levels in the 8 GeV Beamline Arising from the Tevatron Beam Losses |
Chandrashekhara M. Bhat et al. |
ES&H
|
24 Jun 2003 |
77-v1 |
Instrumentation Requirements for the Fermilab Main Injector |
David E. Johnson |
Beam Instrumentation
Beam Dynamics
|
23 Jun 2003 |
70-v1 |
Glow Discharge Cleaning for the Main Injector |
Shuxiu Zhang |
Vacuum
Vacuum
|
12 Jun 2003 |
506-v2 |
Booster Dogleg Studies (Run II Meeting) |
Eric J Prebys |
Studies
Run II
|
13 Mar 2003 |
361-v1 |
Notes for MI/RR Group Meeting of 18 Sep 2002 |
Bruce C. Brown |
Operations
MI-RR-Group
Transfer Lines
|
13 Jan 2003 |
362-v1 |
Pbar Acceleration in the Main Injector RR/AR - MI - Tevatron - Simulations and Tune up Studies Using Protons |
Chandrashekhara M. Bhat |
RF
Beam Instrumentation
Studies
|
20 Nov 2000 |
356-v1 |
Analysis of the Beam Loss Observed During the October 12, 2000 Main Injector Deceleration Studies |
Gerald P. Jackson |
Studies
Beam Dynamics
|
23 Oct 2000 |
342-v1 |
Radiation Dose Rate Measurement at Tevatron Wave Guide Penetrations at F0 Service Building due to 8 GeV Proton Beam Loss |
Anthony F. Leveling |
ES&H
|
05 Feb 1999 |
330-v1 |
Committed Effective Dose Equivalent Calculation for Personnel Exposure to Airborne Radioactivity Produced by Main Injector Beam Loss |
Anthony F. Leveling |
Studies
ES&H
|
07 Jul 1998 |
305-v2 |
A Preliminary Analysis of Ground-Water and Surface-Water Radioactivity Around the Main Injector Extraction and Injection Regions |
Chandrashekhara M. Bhat et al. |
Studies
ES&H
|
01 Nov 1997 |
308-v1 |
Main Injector Intensity Limitations at Transition |
Chandrashekhara M. Bhat |
Beam Dynamics
Meetings
Tevatron Group
|
29 Sep 1997 |
306-v1 |
Can Magnetic Fields Assist in Radiation Shielding for 8 GeV Proton Beams |
Bruce C. Brown |
ES&H
Energy Deposition
ES&H
|
15 Aug 1997 |
292-v1 |
Beam Line Beam Loss Monitors |
Marv Olson |
Beam Instrumentation
Beam Loss Monitors (BLM)
Transfer Lines
Design Properties
|
12 Mar 1997 |
146-v2 |
Radiation Level in the Intersection Region of AP2 and 8 GeV Beam-line due to Beam Loss in the AP2 Beam-line |
Chandrashekhara M. Bhat et al. |
Beam Dynamics
ES&H
|
23 Aug 1995 |
100-v1 |
Radiation Levels in the MI-60 Enclosure from Tevatron Beam Losses |
Chandrashekhara M. Bhat |
Beam Dynamics
ES&H
Civil
|
08 Nov 1993 |
82-v1 |
Summary of the Existing MR Beam Diagnostics for Use in Main Injector |
Chandrashekhara M. Bhat et al. |
Beam Instrumentation
Beam Dynamics
|
01 Mar 1993 |
34-v1 |
Transition Crossing in the Main Injector-ESME Simulation |
S. Alex Bogacz |
Beam Dynamics
|
01 Aug 1990 |
25-v1 |
Fermilab Fixed Target Beams from the Main Injector |
Samuel R. Childress |
Extraction
Transfer Lines
|
01 May 1989 |