3324-v1 |
Instrumentation-Systems-SDA meeting of March 4, 2009 |
Craig R. McClure et al. |
Tevatron
SDA
Instrumentation
Main Injector
|
10 Mar 2009 |
3323-v1 |
Main Injector Proton Emittances before and after proton multibatch operation |
Vaia Papadimitriou |
SDA
|
05 Mar 2009 |
3298-v1 |
Instrumentation-Systems-SDA meeting of February 4, 2009 |
Craig R. McClure et al. |
Tevatron
SDA
Instrumentation
Main Injector
|
09 Feb 2009 |
1389-v1 |
VME Base Addresses |
Eugene Lorman |
Ion Profile Monitor
SyncLite (SL)
Flying Wires
LabVIEW
|
01 Oct 2004 |
1032-v1 |
flying wire tests in lab 3 |
Stephen Pordes |
Flying Wires
|
20 Feb 2004 |
883-v1 |
flying wire pictures |
Jim Zagel |
Flying Wires
|
27 Oct 2003 |
838-v1 |
Update of Snapshot of Tevatron Flying Wire and Synchrotron Light Detector Transverse Emittance Measurements at 980GeV |
Krzysztof Genser |
Emittance
Flying Wires
SyncLite (SL)
Instrumentation
Flying Wires
|
19 Sep 2003 |
656-v1 |
A Snapshot of Tevatron Flying Wire and Synchrotron Light Detector Transverse Emittance Measurements at 980GeV |
Krzysztof Genser |
Emittance
Flying Wires
SyncLite (SL)
Instrumentation
Flying Wires
|
05 Jun 2003 |
564-v1 |
Mi and TeV FW Analysis |
Federico Roncarolo |
Flying Wires
Flying Wires
Flying Wires
|
25 Apr 2003 |
552-v4 |
Tevatron Flying Wire Math |
Stephen Pordes |
Emittance
Flying Wires
Flying Wires
|
24 Apr 2003 |
141-v1 |
Software jobs for RR Flying Wire system |
Alberto Marchionni |
RR2003Winter
Beam Instrumentation
|
10 Dec 2002 |