8536-v2 |
Longitudinal Dynamics at Injection in Booster |
Chandrashekhara M. Bhat |
Booster
Beam Dynamics
LLRF
Beam Instrumentation
|
10 Jul 2020 |
909-v1 |
Booster LLRF VCO DSP Program Info |
Bob Webber |
LLRF
LLRF
|
24 Apr 2020 |
7103-v1 |
Booster LLRF Transfer Function Modeling |
Edward W. Cullerton |
Booster
LLRF
|
20 Mar 2019 |
7106-v1 |
Fermilab LLRF SOC-MFC Test DAQ System |
Edward W. Cullerton et al. |
LLRF
Front-end Systems
|
20 Mar 2019 |
7109-v1 |
LCLS-II Fermilab CMTS Cavity Field Calculation Errors |
Edward W. Cullerton et al. |
LLRF
CMTF
CMTS-1
|
20 Mar 2019 |
7112-v1 |
Using Altera Tools for SoC Design |
Edward W. Cullerton |
LLRF
Front-end Systems
Embedded
Front-end Documentation
|
20 Mar 2019 |
7115-v1 |
LCLS-II CMTS Cavity Probe Calibrations |
Edward W. Cullerton et al. |
LLRF
CMTF
CMTS-1
|
20 Mar 2019 |
7130-v1 |
Building a VXI LLRF Front-end from Scratch |
Edward W. Cullerton |
LLRF
Front-end Systems
Front-end Documentation
|
20 Mar 2019 |
3806-v2 |
1.3 GHz Phase Averaging Reference Line for Fermilab's NML ASTA Program |
Edward W. Cullerton et al. |
LLRF
ASTA
|
19 Mar 2019 |
6237-v1 |
2nd harmonic RF perpendicular biased cavity HLRF and LLRF (23 Mar 2018) |
Rene Padilla et al. |
PIP
|
23 Mar 2018 |
6085-v1 |
2nd harmonic RF perpendicular biased cavity HLRF and LLRF (07 Feb 2018) |
Cheng-Yang Tan |
PIP
|
07 Feb 2018 |
5804-v2 |
LLRF Controls Settings |
Craig C Drennan |
LLRF
|
30 Nov 2017 |
3891-v15 |
VME-DDS Frequency and Phase Control Module |
Craig C Drennan |
LLRF
|
30 Nov 2017 |
5307-v4 |
New Booster LLRF DDS -- ACNET Parameters and Curve Application Notes |
Craig C Drennan et al. |
LLRF
|
13 Nov 2017 |
5334-v1 |
Collection of Booster Synchronization Documents |
Craig C Drennan |
LLRF
|
03 Mar 2017 |
5273-v1 |
Booster Acceleration Phase Lock Controller |
Craig C Drennan |
LLRF
Operations
|
15 Nov 2016 |
4411-v7 |
Booster LLRF System Block Diagram |
Craig C Drennan |
LLRF
|
14 Nov 2016 |
4964-v2 |
Cogging Test Switch |
Craig C Drennan |
LLRF
|
23 Jun 2016 |
5166-v1 |
VME DDS Frequency Curves |
Craig C Drennan |
LLRF
|
25 May 2016 |
5150-v1 |
Phase Changes to A RF and B RF at Transition |
Craig C Drennan |
LLRF
|
04 May 2016 |
1271-v13 |
RF & Instrumentation Front-end Software Development Tools |
Duane C Voy |
Front-end Documentation
|
19 Apr 2016 |
4459-v2 |
Booster Paraphase Curve Generator VXI Module |
Craig C Drennan |
LLRF
|
17 Feb 2016 |
4781-v2 |
Booster to Main Injector Phase-Lock Controller |
Craig C Drennan |
LLRF
|
16 Nov 2015 |
4936-v1 |
Early Injection studies -- Frequency Trigger OR'ing Module |
Craig C Drennan |
LLRF
|
28 Aug 2015 |
4935-v1 |
Acceleration Gate Module |
Craig C Drennan |
LLRF
|
28 Aug 2015 |
4817-v1 |
NML Master Oscillator System |
Julien Branlard |
ASTA
|
28 Apr 2015 |
4816-v1 |
Superconducting Cavity Model and Simulation for NML ASTA |
Edward W. Cullerton |
ASTA
|
28 Apr 2015 |
4815-v1 |
1.3 GHz 8-Channel Receiver for NML ASTA LLRF |
Edward W. Cullerton |
ASTA
|
28 Apr 2015 |
4414-v5 |
Booster Longitudinal Damper System Block Diagram -- Draft for Review |
Craig C Drennan |
Beam Dynamics
LLRF
|
03 Mar 2014 |
4413-v1 |
Booster LLRF VXI DSP Module 2013 |
Craig C Drennan |
LLRF
|
15 Jul 2013 |
4153-v5 |
Booster Main Injector Phase Lock Divide-By-32 Phase Error Trajectory Method |
Craig C Drennan |
LLRF
|
18 Jun 2013 |
4198-v1 |
Booster Cogging Teststand Progress -- PIP Presentation |
Craig C Drennan et al. |
Upgrades
PIP
LLRF
|
20 Aug 2012 |
3367-v1 |
Characterization of the Fast Phase Detector in the Booster LLRF System |
Craig C Drennan |
LLRF
Operations
Controls
|
24 Jul 2012 |
3922-v2 |
Booster Dual Phase Detector Module for MI Phase Lock Control |
Craig C Drennan |
LLRF
|
17 Jul 2012 |
4103-v1 |
PIP Presentation on Booster Main Injector Phase Lock |
Craig C Drennan |
PIP
LLRF
|
28 Mar 2012 |
3794-v2 |
SIMCAV FLASH ACC6 and ACC7 simulator |
Julien Branlard |
ILCTA
|
24 Mar 2011 |
3796-v1 |
Note on solving QL for flat gradients at FLASH ACC6 and ACC7 |
Julien Branlard |
LLRF
ILCTA
|
17 Mar 2011 |
3678-v1 |
MFC DSP Software Outline |
Philip Varghese |
LLRF
LLRF
LLRF
ILCTA
|
23 Sep 2010 |
3676-v1 |
Multi‐cavity Field Control (MFC) Module Description |
Philip Varghese |
LLRF
LLRF
NML
LLRF
|
23 Sep 2010 |
3674-v1 |
NML Master Oscillator |
Julien Branlard |
ILCTA
|
23 Sep 2010 |
3643-v1 |
Examination of BGA and LGA Connections on the Booster LLRF DDS Module Prototype |
Craig C Drennan |
LLRF
|
21 Jul 2010 |
3634-v1 |
Study on Microphonics for the Master Oscillator Design at NML |
Julien Branlard |
LLRF
ILCTA
|
30 Jun 2010 |
3604-v1 |
Configuring the Booster LLRF System for Testing New Frequency and Phase Control Components |
Craig C Drennan |
LLRF
|
04 May 2010 |
3520-v1 |
Coupling adjustment considerations |
Julien Branlard |
ILCTA
|
08 Dec 2009 |
3494-v3 |
LLRF notes |
Julien Branlard |
ILCTA
|
13 Nov 2009 |
3473-v1 |
Microphonics considerations on the generator power for Project X |
Julien Branlard |
LLRF
Project X
|
14 Oct 2009 |
3456-v1 |
HINS - LLRF |
Julien Branlard |
LLRF
Project X
|
23 Sep 2009 |
3444-v1 |
9mA beam current study at FLASH - DESY |
Julien Branlard et al. |
LLRF
|
01 Sep 2009 |
3428-v1 |
Fermilab Low Energy Linac Low Level RF Upgrade Engineering Notes and Operational Guide |
Edward W. Cullerton et al. |
LLRF
LLRF
|
13 Aug 2009 |
3425-v1 |
Booster LLRF Electronics Upgrade -- Electronic Design Efforts, April 2009 |
Craig C Drennan |
LLRF
|
21 Jul 2009 |
2974-v2 |
Mathematical Description of the Booster LLRF Controls |
Craig C Drennan |
LLRF
Controls
|
15 Apr 2009 |
2828-v4 |
Requirements for the Booster LLRF DDS Module |
Craig C Drennan et al. |
Hardware
LLRF
|
15 Apr 2009 |
3042-v1 |
Linac 805 MHz LLRF manual |
Ralph Pasquinelli |
LLRF
|
22 Feb 2008 |
745-v1 |
Gated Current Integrator for the Beam in the RR Barrier Bucket |
Chandrashekhara M. Bhat et al. |
LLRF
RF
Beam Instrumentation
LLRF
Beam Dynamics
|
13 Dec 2005 |
2045-v1 |
Booster Cogging |
Robert M Zwaska |
LLRF
Extraction Lattice
|
08 Dec 2005 |
1847-v2 |
Booster Cogging at PAC 05 |
Sacha E. Kopp et al. |
LLRF
|
27 May 2005 |
1277-v1 |
Booster Cogging: Synchronization with the Main Injector for NuMI & Slip-Stacking |
Robert M Zwaska |
LLRF
Commissioning
LLRF
Commissioning
|
29 Jul 2004 |
1241-v1 |
Synchronization of the Fermilab Booster and Main Injector for Multiple |
Sacha E. Kopp et al. |
LLRF
Projects
LLRF
|
01 Jul 2004 |
859-v1 |
Booster cogging for multiple batch operation of the Main Injector |
William A Pellico et al. |
Commissioning
Project
Projects
LLRF
Studies
Primary Proton Beam
|
02 Oct 2003 |
742-v1 |
Proton Deceleration from 150 GeV to 8.9 GeV in the Main Injector: Simulations and Beam Tests |
Chandrashekhara M. Bhat |
Beam Instrumentation
Studies
LLRF
Beam Dynamics
|
25 Jul 2003 |
748-v1 |
Emittance measurement and acceleration Revision of MI-0294 |
Kiyomi Seiya |
Beam Instrumentation
Studies
LLRF
Beam Dynamics
|
10 Apr 2003 |
743-v1 |
Pbar Acceleration in the MI using 2.5 MHz Coalescing RF system: Tune-up Study Scheme with proton beams and Operational Implementation |
Chandrashekhara M. Bhat et al. |
RF
Beam Instrumentation
LLRF
LLRF
|
14 Feb 2001 |
329-v1 |
Recycler Commissioning Plan |
Gerald P. Jackson |
Studies
Commissioning
|
11 Nov 1998 |
223-v1 |
MI Instrumentation: Layouts and Rack Layouts |
Gregory L. Vogel |
Beam Instrumentation
Schottky
Controls
BPM
|
21 Oct 1996 |