8560-v3 |
Beam Losses for the PIP-III Linac to Recycler/Main Injector |
David V Neuffer |
Main Injector
Recycler
Upgrades
|
01 Sep 2020 |
3299-v2 |
Some Console Applications for Displaying Main Injector BLM Measurements |
Bruce C. Brown et al. |
Beam Loss Monitors (BLM)
Operations
Console Applications
Beam Instrumentation
Collimation
|
27 May 2020 |
3523-v1 |
Residual Radiation Monitoring in the Main Injector with the ROTEM RAM DA3-2000 Radiation Survey Meter |
Bruce C. Brown |
Other
|
27 May 2020 |
3857-v1 |
Main Injector Counterwave Properties and MI300 Collimator Motion Limits |
Bruce C. Brown |
Console Applications
Lattice
Transfer Lines
Collimation
Transfer Lines
|
27 May 2020 |
4457-v1 |
Replacement Primary Collimator for Main Injector |
Bruce C. Brown et al. |
Collimation
|
27 May 2020 |
4460-v1 |
A Collimation Mask at MI308 to Protect RR to MI Injection Kickers |
Bruce C. Brown |
Collimation
|
27 May 2020 |
2834-v1 |
Main Injector Residual Radiation Data 2004 - 2007 |
Bruce C. Brown |
ES&H
|
22 May 2020 |
2618-v1 |
First Results from MI8 Collimator Use |
Phil Adamson et al. |
ES&H
Studies
Transfer Lines
Collimation
|
22 May 2020 |
1926-v2 |
Reducing Losses in Main Injector by MI8 Line Scraping |
Bruce C. Brown et al. |
Electron Cooling
Studies
Transfer Lines
Collimation
|
18 May 2020 |
6811-v6 |
AD/Instrumentation Status Meeting Minutes and Slides |
Craig C Drennan |
Monitoring Instrumentation
Beam Instrumentation
Beam Instrumentation
IOTA
Beamline
Beam Instrumentation
PXIE
FAST
Beam Instrumentation
Instrumentation
|
04 May 2020 |
925-v1 |
Notes on Transferring MI-Notes to the Beams Document Database |
Bruce C. Brown |
Other
|
28 Apr 2020 |
531-v1 |
Notes for MI/RR Group Meeting of 24 March 2003 |
Daniel R. Broemmelsiek et al. |
MI-RR-Group
Studies
Dampers
|
23 Apr 2020 |
528-v1 |
Notes for MI/RR Group Meeting of 10 March 2003 |
Bruce C. Brown |
Extraction
MI-RR-Group
Beam Instrumentation
Vacuum
RF
|
23 Apr 2020 |
484-v1 |
Notes for MI/RR Group Meeting of 26 Feb 2003 |
Chandrashekhara M. Bhat et al. |
MI-RR-Group
BPM
RF
RF
Beam Instrumentation
|
23 Apr 2020 |
468-v4 |
Notes for MI/RR Group Meeting of 19 Feb 2003 |
Bruce C. Brown |
Beam Dynamics
MI-RR-Group
Beam Instrumentation
Studies
RF
Transfer Lines
|
23 Apr 2020 |
433-v1 |
Notes for MI/RR Group Meeting of 29 Jan 2003 |
Bruce C. Brown |
MI-RR-Group
BPM
Beam Line Tuner (BLT)
Beam Instrumentation
|
23 Apr 2020 |
416-v1 |
Notes for MI/RR Group Meeting of 22 Jan 2003 |
Bruce C. Brown |
RR2003Winter
MI-RR-Group
Other
Beam Instrumentation
Beam Instrumentation
MI2003Winter
|
23 Apr 2020 |
8164-v1 |
Notes on Main Injector Quadrupole Reliability |
Sherry F Baketz et al. |
Magnets
Magnets
Magnets
|
30 Mar 2020 |
4867-v3 |
Calibration of BLM Response to Proton Loss |
Bruce C. Brown |
Beam Loss Monitors (BLM)
ES&H
Beam Instrumentation
Collimation
|
10 Mar 2020 |
307-v2 |
Shielding Assessment of F0 to Switchyard Beam Line Enclosure for MI 120 GeV Beam Transport |
Chandrashekhara M. Bhat |
Beam Dynamics
ES&H
Transfer Lines
|
28 Feb 2020 |
283-v5 |
Notes for MI/RR Group Meeting of 18 Dec 2002 |
Daniel R. Broemmelsiek et al. |
Operations
MI-RR-Group
Studies
|
28 Feb 2020 |
117-v1 |
Initial Determination of Main Injector Quadrupole Steel Lengths |
David J. Harding |
Magnets
Design Properties
Magnets
|
28 Feb 2020 |
106-v2 |
An Air-Cooled FMI Abort Dump? |
Chandrashekhara M. Bhat et al. |
Design Properties
Water
|
28 Feb 2020 |
80-v1 |
Kicker Operating Margins |
David E. Johnson |
Magnets
Magnets
|
28 Feb 2020 |
79-v1 |
Beamline Power Supply Ripple and Regulation Specifications |
David E. Johnson |
Power Supplies
Transfer Lines
|
28 Feb 2020 |
50-v2 |
Estimates of Skew Quad Strengths and Locations for the Main Injector |
Peter Bagley et al. |
Beam Dynamics
Magnets
Lattice
Transverse Dynamics
Alignment
|
12 Feb 2020 |
39-v2 |
The Definition of alpha_1: Circumference, Johnsen, or ESME? |
James A. MacLachlan et al. |
Longitudinal Dynamics
Lattice
|
12 Feb 2020 |
11-v1 |
MI-14 Beamlines Solutions for TeV Injection, Slow Extraction, Pbar Production, and Pbar Injection |
David E. Johnson |
Extraction
Beam Transfer
Transfer Lines
|
07 Feb 2020 |
8-v1 |
A 150 GeV MI_11 to Tevatron Beamline Solution |
David E. Johnson |
Transfer Lines
|
07 Feb 2020 |
5-v1 |
Main Injector Dipole: Conductor Optimization |
Stephen D. Holmes |
Magnets
Design Properties
|
07 Feb 2020 |
1-v2 |
A Dispersion Mismatch Criterion for the Main Injector to Tevatron Transfer Line |
Rodney E. Gerig |
Transfer Lines
|
06 Feb 2020 |
290-v1 |
PAC97 Abstract List |
Management of Main Injector Project |
None
|
26 Sep 2019 |
340-v2 |
SWIC and Multiwire Timing |
James L. Crisp et al. |
Controls
Beam Instrumentation
Transfer Lines
|
26 Sep 2019 |
339-v2 |
Stripline Detectors for Fermilab Main Injector |
James L. Crisp et al. |
Beam Dynamics
Beam Instrumentation
|
26 Sep 2019 |
309-v2 |
Ground Water, Air-Borne and Soil Activation from the Operation of the MI-40 Beam Absorber During the FMI Era |
Chandrashekhara M. Bhat |
ES&H
|
26 Sep 2019 |
350-v2 |
GFSDA Tune Measurement in the Main Injector |
David A. Herrup |
Beam Instrumentation
Tune Measurement
|
26 Sep 2019 |
7573-v2 |
Design Considerations and Operational Features of the Collimators for the Fermilab Main Injector and Recycler |
Bruce C. Brown |
ES&H
Beam Physics
Main Injector
Collimation
Energy Deposition
Recycler
Transfer Lines
Collimation
Transfer Lines
|
30 Aug 2019 |
7540-v1 |
Radiation Studies for Main Injector Activation Using MARS in a `Toy Model' |
Phil Adamson et al. |
Beam Physics
Main Injector
|
09 Aug 2019 |
7400-v1 |
Fermilab Main Injector: Promises Kept and More |
Bruce C. Brown |
Main Injector
Project
Recycler
|
19 Jun 2019 |
6631-v1 |
Longitudinal Scans of Residual Radiation in MI Collimators C307 and C308 |
Bruce C. Brown |
Energy Deposition
Collimation
|
22 Aug 2018 |
6270-v2 |
Al Tag Radiation Studies for Instrumentation in the Main Injector |
Bruce C. Brown et al. |
Photographs
ES&H
Beam Instrumentation
Main Injector
Recycler
Beam Instrumentation
Instrumentation
|
13 Apr 2018 |
4046-v3 |
Activation of Steel and Copper Samples in the Main Injector Collimator Region |
Bruce C. Brown |
ES&H
Energy Deposition
Collimation
|
01 Jun 2017 |
5247-v1 |
MI8 line Beam emittance measurement |
Ming-jen Yang |
Booster
Main Injector
Recycler
|
06 Oct 2016 |
4896-v2 |
Collimation Design using Reduced Courant-Snyder Coordinates |
Bruce C. Brown |
Lattice
Energy Deposition
Collimation
|
27 May 2016 |
4827-v5 |
XFR Modification to Resetting Beam Sync (AA) and Offset Beam Sync (OAA) |
Craig C Drennan |
Operations
LLRF
RF
LLRF
RF
LLRF
|
05 Jun 2015 |
4775-v1 |
Performing Vacuum Calculations Using ANSYS |
Kris A Anderson |
Vacuum
Vacuum
Vacuum
Vacuum
Vacuum
Vacuum/Water/Utilities
Vacuum
|
27 Feb 2015 |
4153-v5 |
Booster Main Injector Phase Lock Divide-By-32 Phase Error Trajectory Method |
Craig C Drennan |
LLRF
|
18 Jun 2013 |
4294-v1 |
The Fermilab Main Injector Technical Design Handbook |
Management of Main Injector Project |
Design Properties
Main Injector
Project
|
15 Feb 2013 |
4190-v1 |
MI injector machine octupole content measurement |
Denton K Morris et al. |
Magnets
|
30 Jul 2012 |
4185-v1 |
MI8 line Emittance Monitor upgrade simulation |
Ming-jen Yang |
Lattice
NOvA
|
27 Jul 2012 |
4184-v1 |
MI8 line at Recycler Energy |
Ming-jen Yang |
Beamline
Transfer Lines
Transfer Lines
|
27 Jul 2012 |
3922-v2 |
Booster Dual Phase Detector Module for MI Phase Lock Control |
Craig C Drennan |
LLRF
|
17 Jul 2012 |
3980-v2 |
Analysis Procedures for Al Activation Studies |
Bruce C. Brown |
Beam Loss Monitors (BLM)
ES&H
Energy Deposition
Beam Instrumentation
Collimation
|
09 Apr 2012 |
3898-v1 |
BLM Upgrade Project Abort Card Specification |
Michael J. Utes |
Instrumentation
Beam Instrumentation
|
06 Jul 2011 |
3717-v1 |
Comparison of Short Term Cooldown Data for MI Collimator C307 Near Beam and Beside Marble Shielding |
Amir Jaehoon Safavi |
ES&H
|
17 Nov 2010 |
3669-v1 |
Bunch coalescing study at low energy |
Anna Yagodnitsyna |
RF
|
10 Sep 2010 |
3649-v2 |
8-GeV Pbar Horizontal instability in Main Injector |
Ming-jen Yang et al. |
Instabilities
Main Injector
|
10 Aug 2010 |
1410-v10 |
BLM Upgrade Users' Guide |
Alan Baumbaugh et al. |
Beam Loss Monitors (BLM)
TeV ABORT
Instrumentation
Beam Instrumentation
Beam Instrumentation
|
21 Jun 2010 |
147-v2 |
Thermal Tests of an Insulated Coil |
Philip S. Martin et al. |
Magnets
Studies
|
23 Apr 2010 |
3568-v1 |
Predicting Residual Radiation using Beam Loss Data - Early Results |
Bruce C. Brown |
Beam Loss Monitors (BLM)
ES&H
Operations
MI-Dept
Beam Instrumentation
|
11 Mar 2010 |
3458-v1 |
Some Initial ECloud Measurements |
Robert M Zwaska |
Instabilities
Beam Dynamics
|
25 Sep 2009 |
3295-v1 |
Improved Measurement of Main Injector Collimation Efficiency for Uncaptured Beam |
Bruce C. Brown |
Beam Loss Monitors (BLM)
Proton Plan
Collimation
|
02 Feb 2009 |
3281-v1 |
Microwave Electron Cloud Measurements in the Main Injector |
James L. Crisp et al. |
Beam Instrumentation
Project X
|
13 Jan 2009 |
3208-v1 |
Main Injector ECloud measurements: conditioning |
Robert M Zwaska |
Instabilities
|
16 Sep 2008 |
3191-v2 |
Sextupole Feed-down effect due to counter-waves in Main Injector and Recycler |
Ming-jen Yang |
Lattice
Lattice
|
29 Aug 2008 |
2299-v1 |
Alignment Check for MI8 Collimators |
Bruce C. Brown |
Alignment
Transfer Lines
Collimation
|
22 Apr 2008 |
2881-v2 |
Main Injector Collimation System Hardware |
Bruce C. Brown |
Proton Plan
ES&H
Operations
Collimation
|
22 Apr 2008 |
336-v1 |
Shielding Assessment of the Main Injector Complex |
Chandrashekhara M. Bhat et al. |
Studies
|
19 Nov 2007 |
2732-v4 |
Main Injector BPM Project Closeout Report |
Bakul Banerjee et al. |
BPM
BPM
|
31 Aug 2007 |
2751-v1 |
Main Injector Average Quadrupole Strengths |
David J. Harding |
Magnets
|
23 Apr 2007 |
2674-v1 |
Main Injector stray beam clearing options |
Ming-jen Yang |
Operations
|
05 Mar 2007 |
2579-v1 |
Electron Cloud Instabilities |
Robert M Zwaska |
Instabilities
Beam Dynamics
SNuMi
Proton Driver
|
06 Dec 2006 |
2578-v1 |
MI BPM Upgrade Crate Specification |
Bob Forster |
BPM
BPM
|
06 Dec 2006 |
2563-v1 |
Application of MI BPM data for beam study |
Ming-jen Yang |
BPM
|
21 Nov 2006 |
1526-v6 |
MI BPM Meeting Notes and Minutes |
Steve Wolbers |
BPM
BPM
|
08 Nov 2006 |
2301-v3 |
Proposed MI BPM 2.5MHz Transition Board Gains |
Bob Webber |
BPM
BPM
Beam Instrumentation
|
03 Oct 2006 |
2469-v1 |
MI BPM Board-by-Board Gain Values |
Marv Olson et al. |
BPM
BPM
Beam Instrumentation
|
22 Sep 2006 |
2453-v2 |
Proposed MI BPM 53 MHz Channel Transition Board Gain Settings |
Robert Dysert et al. |
BPM
BPM
Beam Instrumentation
|
15 Sep 2006 |
2317-v4 |
Main Injector HLRF Anode Limit Program & Cavity Tuner RF Voltage Limit |
Tim G. Berenc et al. |
Proton Plan
RF
HLRF
|
14 Sep 2006 |
2450-v2 |
MI BPM Meeting |
Bob Webber et al. |
BPM
|
13 Sep 2006 |
1951-v1 |
Monthly Report of the MI BPM Upgrade Project |
Bakul Banerjee et al. |
BPM
BPM
|
11 Sep 2006 |
2428-v1 |
MI BPM alarms |
David P Capista |
BPM
|
30 Aug 2006 |
2422-v1 |
Main Injector BPM signoff forms |
David P Capista |
BPM
BPM
|
29 Aug 2006 |
2391-v1 |
Timing Comparison of Pbars in Main Injector to Recycler and to Tevatron |
Steve Foulkes et al. |
BPM
BPM
Beam Instrumentation
|
15 Aug 2006 |
2382-v1 |
Using MathCad to Generate a Polynomial for Computation of Beam Position from MI Extra-Wide Aperture BPM |
Milton Smith |
BPM
BPM
Beam Instrumentation
|
08 Aug 2006 |
2086-v1 |
Note on Position Sensitivity of the Sum Signal from a Main Injector BPM |
Bob Webber |
BPM
BPM
Beam Instrumentation
|
01 Aug 2006 |
2371-v1 |
Note on Position Sensitivity of the Sum Signal from a Main Injector Extra-Wide Aperture BPM |
Bob Webber |
BPM
BPM
BPM
Intensity Measurements
Beam Instrumentation
|
01 Aug 2006 |
2348-v1 |
Model of RF Leakage Effect on MI Beam Position Measurement |
Bob Webber |
BPM
BPM
BPM
Beam Instrumentation
|
14 Jul 2006 |
2331-v1 |
Main Injector HLRF Measurements for Proton Plan |
Tim G. Berenc |
Proton Plan
RF
HLRF
|
07 Jul 2006 |
2311-v2 |
Main Injector RF Power Calculations for the Proton Plan |
Tim G. Berenc et al. |
Proton Plan
RF
HLRF
|
30 Jun 2006 |
2280-v1 |
MI Extra Wide Aperture BPM Scaling in Difference-Over-Sum BPM System |
Bob Webber |
BPM
BPM
BPM
Beam Instrumentation
|
05 Jun 2006 |
2288-v1 |
MIBPM Cable Measurements |
Bob Webber |
BPM
BPM
Beam Instrumentation
|
05 Jun 2006 |
2273-v3 |
MI Extra Wide Aperture BPM Scaling in AM-PM BPM System |
Bob Webber |
BPM
BPM
BPM
Beam Instrumentation
|
26 May 2006 |
2278-v1 |
Electron Cloud Measurements in the Fermilab Main Injector |
Robert M Zwaska |
Instabilities
Beam Dynamics
|
25 May 2006 |
2276-v1 |
MI BPM Commissioning Phase I |
Robert Dysert |
BPM
BPM
|
23 May 2006 |
1822-v4 |
MI Service Building Survey (BPM electronics space) |
Marv Olson |
BPM
BPM
|
23 May 2006 |
2274-v1 |
Analog Signal Pre-Processing For The Fermilab Main Injector BPM Upgrade |
Stefano M Rapisarda et al. |
BPM
BPM
|
22 May 2006 |
2243-v3 |
MI BPM Upgrade Topics |
Steve Wolbers |
BPM
BPM
|
16 May 2006 |
2252-v6 |
The Main Injector Beam Position Monitor Front-End Software |
Luciano Piccoli |
BPM
BPM
|
08 May 2006 |
2250-v9 |
Fermilab Main Injector BPM Upgrade |
Steve Wolbers |
BPM
BPM
|
03 May 2006 |
2251-v9 |
Fermilab Main Injector Beam Position Monitor Upgrade (poster) |
Steve Wolbers |
BPM
BPM
|
02 May 2006 |
1949-v9 |
Main Injector Beam Position Monitor Upgrade Software Specifications for Data Acquisition |
Steve Foulkes et al. |
BPM
BPM
|
07 Apr 2006 |
2178-v2 |
First Report of the Proton Study Group |
Sergei Nagaitsev et al. |
Operations
Other
General
Upgrades
SY120
|
03 Apr 2006 |
2163-v1 |
MI BPM TBT resolution data |
Peter Prieto |
BPM
|
22 Feb 2006 |
2140-v1 |
Proton Driver Beam Parameters as Presented to Main Injector |
Bob Webber |
Future Accelerators
SNuMi
|
08 Feb 2006 |
2125-v5 |
MI BPM Offset Table Log |
Marv Olson |
BPM
Beam Instrumentation
|
01 Feb 2006 |
2101-v2 |
MI BPM EchoTek/GrayChip Bandwidths |
Bob Webber |
BPM
BPM
Beam Instrumentation
|
16 Jan 2006 |
2099-v1 |
MI BPM Installation Requirements |
David P Capista |
BPM
|
11 Jan 2006 |
2043-v1 |
Assessment of MI BPM turn-by-turn measurements |
Bob Webber |
BPM
BPM
Beam Instrumentation
|
07 Dec 2005 |
1782-v7 |
A 2 MegaWatt Multi-Stage Proton Accumulator |
Dave McGinnis |
Future Accelerators
|
03 Nov 2005 |
2000-v1 |
BLM System Control Bus Testing |
Kelly L Knickerbocker |
Beam Loss Monitors (BLM)
Instrumentation
Beam Instrumentation
Beam Instrumentation
|
31 Oct 2005 |
1994-v1 |
BLM VME J2 Backplane Impedance |
Kelly L Knickerbocker |
Beam Loss Monitors (BLM)
Instrumentation
Beam Instrumentation
Beam Instrumentation
|
31 Oct 2005 |
1786-v7 |
Requirements for the Main Injector BPM upgrade |
David P Capista et al. |
BPM
|
24 Oct 2005 |
2002-v1 |
MIBPM Electronics review Report |
Vince Pavlicek et al. |
BPM
|
24 Oct 2005 |
1985-v1 |
MIBPM front-end software release schedule |
Luciano Piccoli |
BPM
|
11 Oct 2005 |
1978-v2 |
Memo on Preliminary Values for MI BPM Polynomial Coefficients |
Bob Webber |
Monitoring Instrumentation
BPM
BPM
BPM
Extraction from Main Injector
Beam Instrumentation
|
03 Oct 2005 |
1322-v2 |
Main Injector/NuMI BPM Scaling - Analysis of Main Injector HP602 and HP604 BPM Data from Traditional Main Injector and NuMI BPM Systems |
Bob Webber |
Commissioning
Monitoring Instrumentation
BPM
BPM
General
Beam Instrumentation
|
03 Oct 2005 |
1958-v2 |
Antiproton Beam Position Measurements with Prototype Equipment at MI-30 |
Charles Briegel et al. |
BPM
BPM
Beam Instrumentation
|
19 Sep 2005 |
1956-v1 |
Qualification of the Haynes 10/7 Digitizer Clock Signal |
Peter Prieto et al. |
BPM
BPM
Beam Instrumentation
|
12 Sep 2005 |
1955-v1 |
MIBPM Front-End Software Memory Requirements Review |
Luciano Piccoli |
BPM
BPM
|
09 Sep 2005 |
1937-v2 |
Main Injector BPM Review Committee Report of July 25, 2005 |
Alan Baumbaugh et al. |
BPM
BPM
|
22 Aug 2005 |
1908-v3 |
MI BPM Upgrade Review -- Overview Talk |
Bob Webber |
BPM
BPM
|
25 Jul 2005 |
1834-v9 |
BPM Buffers |
David P Capista et al. |
BPM
BPM
|
30 Jun 2005 |
1874-v1 |
MI States and BPMs |
Brian E. Chase |
BPM
BPM
|
17 Jun 2005 |
1865-v1 |
Combiner Board Slides from MI BPM 6/7/05 Meeting |
Bob Webber et al. |
BPM
|
09 Jun 2005 |
1845-v1 |
Beam Sync Clocks |
Gregory L. Vogel |
BPM
BPM
|
25 May 2005 |
1810-v1 |
TeV BPM Timing Generator Fanout (TGF) Features |
Bill Haynes |
BPM
BPM
|
13 May 2005 |
1806-v1 |
MI States and Clock Events |
David P Capista |
BPM
|
03 May 2005 |
1780-v1 |
Proton and PBar Beam Measurements in the Main Injector |
Peter Prieto et al. |
BPM
BPM
|
13 Apr 2005 |
1736-v1 |
BLM VME J2 Backplane Crosstalk Evaluation |
Kelly L Knickerbocker |
Beam Loss Monitors (BLM)
Instrumentation
Beam Instrumentation
Beam Instrumentation
|
16 Mar 2005 |
1550-v1 |
MI BPM Upgrade (Talk given at CD Accelerator Activities Coord. Mtg 1/25/05) |
Steve Wolbers |
BPM
BPM
|
28 Jan 2005 |
1382-v2 |
Residual Radiation Hints for Aperture and Alignment Issues in the Main Injector |
Bruce C. Brown |
ES&H
Alignment
Vacuum
|
18 Jan 2005 |
1524-v1 |
MI BPM Upgrade |
Steve Wolbers |
BPM
|
11 Jan 2005 |
1394-v1 |
MI8 line measurement, March 2004 |
Ming-jen Yang |
Optics
MI-Dept
Lattice
Studies
Transfer Lines
|
05 Oct 2004 |
1344-v1 |
Main Injector bpm scale factors |
James L. Crisp |
BPM
Beam Instrumentation
|
14 Sep 2004 |
1323-v3 |
MI beam orbit verifier specifications for the NuMI Beam Permit System |
Andrew Godley |
Monitoring Instrumentation
BPM
Primary Proton Beam
Controls
Extraction from Main Injector
Beam Instrumentation
|
07 Sep 2004 |
1321-v1 |
Study of Main Injector BLT |
Nicole Michelotti |
Beam Line Tuner (BLT)
|
30 Aug 2004 |
1277-v1 |
Booster Cogging: Synchronization with the Main Injector for NuMI & Slip-Stacking |
Robert M Zwaska |
Commissioning
Commissioning
LLRF
LLRF
|
29 Jul 2004 |
1241-v1 |
Synchronization of the Fermilab Booster and Main Injector for Multiple |
Sacha E. Kopp et al. |
LLRF
Projects
LLRF
|
01 Jul 2004 |
1222-v1 |
MI BLT Operating Modes (Struck System) |
Eugene Lorman et al. |
Beam Line Tuner (BLT)
Beam Instrumentation
|
25 Jun 2004 |
1054-v2 |
BLT Roadmap in Excel |
Vic Scarpine |
Beam Line Tuner (BLT)
|
27 Apr 2004 |
1053-v1 |
BLT Roadmap |
Eugene Lorman et al. |
Beam Line Tuner (BLT)
|
01 Mar 2004 |
1042-v1 |
Analysis of Tevatron Complex Reliability |
Elliott S McCrory |
None
|
25 Feb 2004 |
1036-v1 |
Beam to NuMI |
Peter Kasper |
Primary Proton Beam
|
24 Feb 2004 |
762-v8 |
Simulation of Main Injector 2.5 MHz Pbar Acceleration with Space Charge and Beam Loading Effects |
Vincent Wu |
Beam Dynamics
|
15 Dec 2003 |
918-v1 |
Talks given at NBI2003 in KEK by Bob Zwaska |
Robert M Zwaska |
Commissioning
Monitoring Instrumentation
Commissioning
Primary Proton Beam
Upgrades
Extraction from Main Injector
Dampers
|
18 Nov 2003 |
859-v1 |
Booster cogging for multiple batch operation of the Main Injector |
William A Pellico et al. |
Commissioning
Studies
Primary Proton Beam
Project
Projects
LLRF
|
02 Oct 2003 |
107-v1 |
gamma_t Jump Design Considerations for the Fermilab Main Injector |
Stephen D. Holmes |
Beam Dynamics
Design Properties
|
14 Aug 2003 |
63-v2 |
Transition Crossing with Positive Chromaticity - A Proposed Main Ring Measurement of alpha_1 vs Chromaticity |
S. Alex Bogacz et al. |
Lattice
|
14 Aug 2003 |
43-v1 |
Comments on the Behavior of alpha_1 in Main Injector gamma_t Jump Schemes |
S. Alex Bogacz et al. |
Beam Dynamics
|
14 Aug 2003 |
33-v1 |
Dynamic Aperture with gamma_t Jump |
Rodney E. Gerig |
Beam Dynamics
|
14 Aug 2003 |
20-v2 |
A Lattice Structure for the MI with an Imaginary gamma_t |
Dejan Trbojevic |
Lattice
|
14 Aug 2003 |
742-v1 |
Proton Deceleration from 150 GeV to 8.9 GeV in the Main Injector: Simulations and Beam Tests |
Chandrashekhara M. Bhat |
Beam Dynamics
LLRF
Beam Instrumentation
Studies
|
25 Jul 2003 |
195-v3 |
Beta Function Distortions from Systematic and Random Gradient Errors in Combined Function and Quadrupole Magnets for Lattice RRV7 |
Stephen D. Holmes |
Lattice
Magnets
|
24 Jul 2003 |
322-v1 |
Recycler Lambertson Magnet Configurations Main Injector -- Recycler Transfer Lines |
David J. Harding |
Magnets
Magnets
Magnets
|
16 Jul 2003 |
148-v2 |
AP4 Beam Dump and Allowed Beam Intensity Limit During the Construction Phase of theMI-8 GeV Beam-line |
Chandrashekhara M. Bhat |
Beam Dynamics
ES&H
|
10 Jul 2003 |
213-v1 |
Main Injector and Beamline Naming Conventions |
David E. Johnson et al. |
Controls
Civil
Lattice
|
08 Jul 2003 |
94-v1 |
Geodesy and Alignment Concepts for the Fermi Main Injector |
Virgil Bocean |
Alignment
Alignment
|
03 Jul 2003 |
91-v1 |
Resonant Charging and Pulse Sharpening for the Proton Injection Kicker: Test Results from MKS-90 Main Ring System |
Chris Jensen et al. |
Power Supplies
Design Properties
|
03 Jul 2003 |
151-v1 |
Results of Off-Center Harmonic Measurements and Analysis |
C. Shekhar Mishra |
Magnets
Studies
|
02 Jul 2003 |
144-v1 |
1995 Electron Cooling Spring Study Bibliography |
Frederick E Mills |
Electron Cooling
|
01 Jul 2003 |
142-v1 |
Vacuum System Design and Performance Calculations for Phase 1 of the 5 MeV Electron Cooling Test Beam Facility |
Gerald P. Jackson |
Design Properties
Vacuum
Vacuum
Studies
|
01 Jul 2003 |
45-v1 |
Physical Aperture and Beamline Matching Criteria for the Main Injector |
Stephen D. Holmes et al. |
Beam Dynamics
Lattice
|
30 Jun 2003 |
84-v1 |
List of Abstracts/Papers Submitted to PAC93, Washington DC, May 17-20, 1993 |
Management of Main Injector Project |
None
|
30 Jun 2003 |
10-v1 |
Transition Crossing Time Shifts |
Stephen G. Peggs |
Beam Dynamics
|
26 Jun 2003 |
121-v1 |
Data Analysis & Quality Control of the Fermilab Main Injector Dipoles Using the Flatcoil Measurements |
C. Shekhar Mishra |
Magnets
Studies
|
25 Jun 2003 |
125-v1 |
Main Injector Dipole Magnet Acceptance Criteria |
C. Shekhar Mishra |
Magnets
|
25 Jun 2003 |
119-v1 |
Main Injector Vacuum System Design Analysis |
Dennis Stoller |
Design Properties
Vacuum
|
25 Jun 2003 |
105-v1 |
Radiation Levels in the 8 GeV Beamline Arising from the Tevatron Beam Losses |
Chandrashekhara M. Bhat et al. |
ES&H
|
24 Jun 2003 |
97-v1 |
Preliminary Design of the Beam Position Detectors for the Fermilab Main Injector |
Ed Barsotti, Jr. |
Design Properties
Beam Instrumentation
|
24 Jun 2003 |
77-v1 |
Instrumentation Requirements for the Fermilab Main Injector |
David E. Johnson |
Beam Dynamics
Beam Instrumentation
|
23 Jun 2003 |
70-v1 |
Glow Discharge Cleaning for the Main Injector |
Shuxiu Zhang |
Vacuum
Vacuum
|
12 Jun 2003 |
73-v1 |
Effective Length of the Main Injector Dipole and its Effect on Main Injector |
Henry D. Glass et al. |
Magnets
|
12 Jun 2003 |
71-v1 |
Simulation of the Dynamical Performance of the Main Injector at 8.9 GeV |
Fady A. Harfoush et al. |
Lattice
Studies
|
12 Jun 2003 |
42-v1 |
Main Injector Quadrupoles: Magnetic Design Issues |
Jean-Francois Ostiguy |
Magnets
|
10 Jun 2003 |
605-v1 |
MI/RR Damper |
George W. Foster et al. |
Dampers
Run II
Dampers
|
16 May 2003 |
591-v1 |
BEAM BASED MEASUREMENTS OF HYSTERESIS EFFECTS IN FERMILAB MAIN INJECTOR MAGNETS |
Bruce C. Brown et al. |
Magnets
Power Supplies
|
07 May 2003 |
748-v1 |
Emittance measurement and acceleration Revision of MI-0294 |
Kiyomi Seiya |
Beam Dynamics
LLRF
Beam Instrumentation
Studies
|
10 Apr 2003 |
544-v1 |
Tevatron C0 and F0 Lambertson Beam Impedance |
James L. Crisp et al. |
Instabilities
Magnets
Magnets
Magnets
|
04 Apr 2003 |
530-v1 |
Longitudinal Dampers for the Main Injector |
George W. Foster et al. |
Dampers
Beam Instrumentation
|
25 Mar 2003 |
518-v1 |
SBD algorithms |
Nickolai Kouropatkine |
Sampled Bunch Display (SBD)
Instrumentation
Beam Instrumentation
|
20 Mar 2003 |
509-v1 |
Main Injector BPM Review Committee Report of the meeting on March 4, 2003 |
Keith E Gollwitzer et al. |
BPM
BPM
Beam Instrumentation
|
18 Mar 2003 |
472-v2 |
REQUIREMENTS FOR THE MAIN INJECTOR & ASSOCIATED TRANSFER LINES BPMs INCLUDING THE NuMI BEAM LINE |
Brajesh Choudhary |
BPM
Beam Instrumentation
|
04 Mar 2003 |
471-v1 |
MAIN INJECTOR BPM SYSTEM UPGRADE + NUMI BEAMLINE BPM REQUIREMENTS |
Brajesh Choudhary |
BPM
Beam Instrumentation
|
03 Mar 2003 |
747-v1 |
Slip Stacking at Low Intensity Status of the Beam Studies |
Kiyomi Seiya |
Beam Dynamics
LLRF
RF
Beam Instrumentation
Studies
|
03 Feb 2003 |
17-v1 |
RF Considerations in the Main Injector |
Philip S. Martin |
RF
|
17 Jan 2003 |
383-v1 |
Notes for MI/RR Group Meeting of 7 Oct 2002 |
Bruce C. Brown |
MI-RR-Group
BPM
Beam Instrumentation
Studies
Controls
|
14 Jan 2003 |
284-v4 |
Notes for MI/RR Group Meeting of 23 Dec 2002 |
Bruce C. Brown et al. |
Beam Dynamics
MI-RR-Group
RF
Studies
Beam Dynamics
|
07 Jan 2003 |
7-v1 |
Magnetic Design of the Main Injector Dipole |
Stan C. Snowdon |
Magnets
Design Properties
Magnets
|
31 Dec 2002 |
6-v1 |
A Magnetic Design for a Dipole with Copper on the Medial Plane |
Stan C. Snowdon |
Magnets
Magnets
|
31 Dec 2002 |
698-v1 |
Proton longitudinal emittance vs proton intensity during MI $2B cycle |
Ioanis Kourbanis et al. |
Beam Dynamics
|
04 Jan 2002 |
352-v1 |
Preparing the Proton Bunches in 2.5 MHz Buckets for MI Tune-up |
Chandrashekhara M. Bhat |
Beam Dynamics
RF
Beam Instrumentation
|
01 Jun 2001 |
743-v1 |
Pbar Acceleration in the MI using 2.5 MHz Coalescing RF system: Tune-up Study Scheme with proton beams and Operational Implementation |
Chandrashekhara M. Bhat et al. |
LLRF
LLRF
RF
Beam Instrumentation
|
14 Feb 2001 |
362-v1 |
Pbar Acceleration in the Main Injector RR/AR - MI - Tevatron - Simulations and Tune up Studies Using Protons |
Chandrashekhara M. Bhat |
RF
Beam Instrumentation
Studies
|
20 Nov 2000 |
356-v1 |
Analysis of the Beam Loss Observed During the October 12, 2000 Main Injector Deceleration Studies |
Gerald P. Jackson |
Beam Dynamics
Studies
|
23 Oct 2000 |
351-v1 |
Strength Measurements of B3 (ODM) Dipoles |
Bruce C. Brown |
Magnets
Transfer Lines
Magnets
|
07 Sep 2000 |
354-v1 |
Pbar Acceleration in the Main Injector for Run II: ESME Simulations |
Chandrashekhara M. Bhat et al. |
RF
Beam Instrumentation
Studies
|
26 Jul 2000 |
353-v1 |
Slow Deceleration of Anti-Proton Beam in the MI: RF Specifications |
Chandrashekhara M. Bhat |
RF
Beam Instrumentation
|
12 Jun 2000 |
788-v1 |
MI8 Transfer Line Lattice Function Measurement |
Saeed Assadi et al. |
BPM
Lattice
|
01 May 2000 |
349-v1 |
Anti-Proton Beam Acceleration in the MI and RF Specifications |
Chandrashekhara M. Bhat |
RF
Beam Instrumentation
|
26 Jan 2000 |
347-v1 |
Single Turn Extraction Design for NuMI |
David E. Johnson |
Extraction
Design Properties
Civil
Civil Construction
Extraction from Main Injector
|
06 Jan 2000 |
346-v1 |
Status and Issues for Main Injector Momentum and Tune Control |
Bruce C. Brown |
Magnets
Controls
Power Supplies
|
02 Jun 1999 |
344-v1 |
Preliminary Measurement of Airborne Radioactvity in the MI40 Absorber Room and at MI40 Abort Lambertsons |
Anthony F. Leveling |
ES&H
Studies
|
07 Apr 1999 |
58-v1 |
Chromaticity Compensation - Main Injector Sextupole Strength |
S. Alex Bogacz et al. |
Magnets
Lattice
|
01 Apr 1999 |
343-v1 |
Microbiologically Influenced Corrosion in the Main Injector Magnet Low Conductivity Water |
Patrick G. Hurh |
Civil
Water
Studies
|
04 Mar 1999 |
341-v3 |
The Main Injector SBD for Studiers |
Willem Blokland et al. |
LabVIEW
Sampled Bunch Display (SBD)
Acnet
Console Applications
Beam Instrumentation
Data Acquisition
|
15 Feb 1999 |
334-v1 |
Some Additional Information for Dipole and Quadrupole Power Supply Control |
Bruce C. Brown |
Magnets
Controls
Power Supplies
|
04 Sep 1998 |
333-v2 |
Main Injector Commissioning Plan |
C. Shekhar Mishra |
Commissioning
Operations
Beam Instrumentation
|
22 Jul 1998 |
331-v2 |
Effect of FO Crossover Shielding Field Change |
Anthony F. Leveling |
ES&H
Civil
|
21 Jul 1998 |
335-v1 |
Main Injector DCCT Measurements |
Gregory L. Vogel |
Beam Instrumentation
|
14 Jul 1998 |
330-v1 |
Committed Effective Dose Equivalent Calculation for Personnel Exposure to Airborne Radioactivity Produced by Main Injector Beam Loss |
Anthony F. Leveling |
ES&H
Studies
|
07 Jul 1998 |
315-v1 |
Main Injector and Recycler Ring Shielding Assessment |
Chandrashekhara M. Bhat et al. |
ES&H
Studies
|
01 Jul 1998 |
317-v1 |
Addendum to MI-0226 |
Gregory L. Vogel |
BPM
RF
Beam Instrumentation
|
24 Jun 1998 |
316-v1 |
MI BPM RF Module Test Results |
Gregory L. Vogel |
BPM
RF
|
16 Jan 1998 |
305-v2 |
A Preliminary Analysis of Ground-Water and Surface-Water Radioactivity Around the Main Injector Extraction and Injection Regions |
Chandrashekhara M. Bhat et al. |
ES&H
Studies
|
01 Nov 1997 |
308-v1 |
Main Injector Intensity Limitations at Transition |
Chandrashekhara M. Bhat |
Beam Dynamics
Tevatron Group
Meetings
|
29 Sep 1997 |
295-v1 |
MI Power Supply Control Issues for Magnets with Hysteresis |
Bruce C. Brown |
Magnets
Power Supplies
|
26 Jun 1997 |
226-v1 |
Timing Requirements for the 8 GeV Proton Injector Kicker |
David E. Johnson |
Controls
|
02 Jun 1997 |
294-v1 |
Magnet Orientations in Beamlines |
David E. Johnson |
Magnets
Civil
Alignment
Alignment
Transfer Lines
|
30 May 1997 |
292-v1 |
Beam Line Beam Loss Monitors |
Marv Olson |
Beam Loss Monitors (BLM)
Design Properties
Beam Instrumentation
Transfer Lines
|
12 Mar 1997 |
289-v1 |
Main Injector 8 GeV Beam Line Shielding Assessment |
Chandrashekhara M. Bhat et al. |
ES&H
Magnets
|
17 Feb 1997 |
286-v1 |
The Effect of Quadrupole Magnetic Fields on Main Injector BPM Measurements |
James L. Crisp et al. |
BPM
BPM
Beam Instrumentation
|
31 Jan 1997 |
235-v1 |
Groundwater, Air-Borne and Soil Activation from the Operation of the Temporary Beam Absorber in the MI-8 GeV Beam Line |
Chandrashekhara M. Bhat et al. |
ES&H
Civil
|
25 Jan 1997 |
227-v1 |
Rogowski Coil Measurements of PQP003 and PQP004 |
Bruce C. Brown et al. |
Magnets
Magnets
Transfer Lines
|
25 Nov 1996 |
224-v1 |
8 GeV Line Instrumentation: Locations and Rack Layouts |
Gregory L. Vogel |
Civil
Beam Instrumentation
|
29 Oct 1996 |
214-v1 |
MI Device and ACNET Names |
David E. Johnson et al. |
Controls
|
29 Oct 1996 |
223-v1 |
MI Instrumentation: Layouts and Rack Layouts |
Gregory L. Vogel |
Controls
BPM
Schottky
Beam Instrumentation
|
21 Oct 1996 |
231-v1 |
Accelerator Physics Issues |
C. Shekhar Mishra |
Magnets
Magnets
Lattice
|
17 Sep 1996 |
212-v2 |
Short Summary of my Visit to Fermilab |
Charles Steinbach |
Extraction
HLRF
Project
|
10 Sep 1996 |
211-v2 |
Ground-water Activation from the Operation of MI40 Beam Absorber |
Chandrashekhara M. Bhat et al. |
Design Properties
ES&H
|
28 Aug 1996 |
197-v1 |
8 GeV Beam Absorber for Beam Line Commissioning |
Chandrashekhara M. Bhat et al. |
Design Properties
Commissioning
ES&H
|
31 Jul 1996 |
194-v1 |
Permanent Magnet Stability: Addendum |
Jean-Francois Ostiguy |
Magnets
Magnets
|
19 Jul 1996 |
202-v1 |
Main Injector Quad Length Ratios and Current vs Tune Parameters |
David E. Johnson |
Magnets
Magnets
Lattice
|
08 Jul 1996 |
171-v2 |
MI-10 Injection Layout |
David E. Johnson |
Civil
Transfer Lines
|
17 May 1996 |
183-v1 |
Simple Technique for Bumping Permanent Magnets to a Desired Strength |
David Anderson |
Magnets
|
01 May 1996 |
170-v1 |
Closed Orbit Effects Due to Longitudinal Bend Center Displacement |
Bruce C. Brown |
Alignment
Transfer Lines
Transfer Lines
|
02 Apr 1996 |
157-v1 |
RF Power Limitation on Main Injector Beam Current |
James E. Griffin |
RF
Beam Instrumentation
|
03 Feb 1996 |
118-v1 |
Main Injector Era Backfeed Recommendations |
Cezary A. Jach |
Civil
AC Power
Power Supplies
|
09 Jan 1996 |
152-v1 |
Main Injector Dipole Magnets Placement in MI62 and MI10 |
C. Shekhar Mishra |
Magnets
Civil
|
20 Dec 1995 |
149-v2 |
Thoughts on FMI Application Programming, CHEP95 and the Main Injector |
C. Shekhar Mishra |
Controls
Other
Project
|
05 Oct 1995 |
146-v2 |
Radiation Level in the Intersection Region of AP2 and 8 GeV Beam-line due to Beam Loss in the AP2 Beam-line |
Chandrashekhara M. Bhat et al. |
Beam Dynamics
ES&H
|
23 Aug 1995 |
145-v2 |
Outline of the 5 MeV Electron Test Beam Project |
Gerald P. Jackson |
Electron Cooling
Electron Cooling
|
21 Aug 1995 |
136-v2 |
µ-Dose Level in the Vicinity of the Intersection of the 8 GeV and the AP2-Beamlines |
Chandrashekhara M. Bhat |
Beam Dynamics
ES&H
|
28 Jun 1995 |
124-v1 |
Beam Heating of Vacuum Windows |
John A. Johnstone |
Vacuum
|
05 Jun 1995 |
135-v1 |
Influence of Process Parameters on the Magnetic Properties of LTV-Processed Steel |
Edward W. Collings |
Magnets
Magnets
|
03 May 1995 |
134-v2 |
List of papers submitted to the 95 PAC, Dallas, TX, May 1-5, 1995. |
Management of Main Injector Project |
Other
|
01 May 1995 |
128-v2 |
Electrical Modeling of Main Injector Dipole Magnets |
Si Fang |
Magnets
|
17 Mar 1995 |
123-v1 |
Cyclic, High-Power Tests of Main Injector Dipoles at E4-R |
Philip S. Martin |
Magnets
Studies
|
06 Mar 1995 |
129-v2 |
Electrical Modeling of Main Injector Quadrupole Magnets |
Si Fang |
Magnets
Design Properties
Magnets
|
03 Mar 1995 |
132-v2 |
High Beta Insert for MI-like Ring |
David E. Johnson |
Optics
Lattice
|
22 Feb 1995 |
122-v1 |
Comparing LTV & ARMCO Magnetic Steel |
Jean-Francois Ostiguy |
Magnets
|
22 Feb 1995 |
113-v1 |
Dipole Strength Dispersion |
Rachid Baiod |
Magnets
|
10 Feb 1995 |
130-v2 |
Electrical Modeling of Main Injector Sextupole Magnets |
Si Fang |
Magnets
|
01 Feb 1995 |
150-v2 |
Data Analysis and Quality Control of the Fermilab Main Injector Dipoles Using the Flatcoil Measurements |
C. Shekhar Mishra |
Magnets
Magnets
Studies
|
16 Jan 1995 |
114-v1 |
Evaluation of Beam Coupling Due to the Dipole Current Loop |
Rachid Baiod |
Beam Dynamics
Magnets
|
28 Oct 1994 |
120-v1 |
X-Y Coupling of Betatron Motion from MI Dipole Bus Current |
James A. MacLachlan |
Beam Dynamics
Magnets
Design Properties
Beam Instrumentation
|
25 Oct 1994 |
127-v1 |
FE Thermal Stress Analysis of the Main Injector Dipole Coil |
Eric Haggard |
Magnets
Design Properties
Magnets
Studies
|
22 Sep 1994 |
115-v1 |
Eddy Currents in the Main Injector Dipole Magnet Coils |
Jean-Francois Ostiguy |
Magnets
|
22 Jul 1994 |
111-v1 |
Study of the Long and Short Quadrupoles Strength Match |
C. Shekhar Mishra |
Magnets
Magnets
Studies
|
30 Jun 1994 |
126-v2 |
Summary Report on the MIR 20.0 Ft. Dipole Magnet Performance/Thermal Test |
Arie Lipski |
Magnets
|
24 Jun 1994 |
112-v1 |
Measurement of Main Ring Quads for Main Injector BPM Dimensions |
James A. Fitzgerald |
Magnets
Design Properties
Beam Instrumentation
|
15 Jun 1994 |
110-v1 |
Study of the Alignment Tolerance and Corrector Strength in the Fermilab Main Injector Lattice |
C. Shekhar Mishra |
Lattice
Alignment
Studies
|
25 May 1994 |
108-v1 |
Low-Dispersion gt Jump Scheme for the Main Injector |
S. Alex Bogacz et al. |
Beam Dynamics
|
02 May 1994 |
109-v1 |
Study of the Main Injector Quadrupole Measurement Precision |
C. Shekhar Mishra |
Magnets
Studies
|
14 Apr 1994 |
104-v1 |
Impedance and Instability Threshold Estimates in the Main Injector I |
Michael A. Martens et al. |
Instabilities
Beam Dynamics
|
01 Mar 1994 |
102-v1 |
MIDB Users and Uses |
Rachid Baiod et al. |
Magnets
Project
|
24 Jan 1994 |
103-v1 |
BPM Alignment Tolerance Considerations |
Philip S. Martin |
Alignment
Beam Instrumentation
|
07 Jan 1994 |
101-v1 |
Main Injector Sextupole Strength - Reassessment |
S. Alex Bogacz |
Magnets
|
01 Dec 1993 |
100-v1 |
Radiation Levels in the MI-60 Enclosure from Tevatron Beam Losses |
Chandrashekhara M. Bhat |
Beam Dynamics
ES&H
Civil
|
08 Nov 1993 |
99-v1 |
Beam Loading Effects for a Partially Filled MI Ring |
S. Alex Bogacz |
Beam Dynamics
|
05 Nov 1993 |
98-v1 |
FMI PCS Self Assessment Report |
Management of Main Injector Project |
Project
|
29 Oct 1993 |
96-v1 |
A Numerical Simulation of Resonant Extraction |
John A. Johnstone |
Lattice
Studies
|
08 Oct 1993 |
92-v2 |
A Simplified Analysis of Resonant Extraction at the Main Injector |
John A. Johnstone |
Extraction
Beam Dynamics
|
03 Sep 1993 |
131-v1 |
Specifications for the Main Injector Horizontal Correction Elements |
David E. Johnson |
Magnets
Design Properties
Magnets
|
03 Sep 1993 |
95-v1 |
Radioactivity of the Closed Loop Cooling Water of the Main Injector Beam Abort Dump |
Chandrashekhara M. Bhat |
Design Properties
ES&H
|
01 Sep 1993 |
90-v1 |
How the Tevatron was Aligned (1980-83) |
C. Thornton Murphy |
Alignment
Alignment
Alignment
|
27 Aug 1993 |
89-v1 |
Study of the Fermilab Main Injector Lattice |
Fady A. Harfoush et al. |
Lattice
Studies
|
25 Aug 1993 |
88-v3 |
Radiation Shieldings for MI Culverts |
Chandrashekhara M. Bhat |
Design Properties
ES&H
Civil
|
01 Aug 1993 |
87-v2 |
A Design Study of the MI40 Beam-Abort Dump |
Chandrashekhara M. Bhat |
Design Properties
ES&H
|
29 Jul 1993 |
86-v1 |
New Configuration of the MI Skew Quads - Local and Global Decoupling Efficacies |
S. Alex Bogacz |
Magnets
|
23 Jul 1993 |
85-v1 |
Transparencies from 150 GeV Line Status Review |
Management of Main Injector Project |
Beam Dynamics
Beam Instrumentation
Transfer Lines
|
21 Jul 1993 |
83-v1 |
Location of Tevatron RF in the Main Injector Era and Clarification of the Tevatron F0 Geometry |
David E. Johnson |
HLRF
RF
|
14 May 1993 |
81-v1 |
Response to Recommendation from September 1992 DOE Review, Main Injector Ring Vacuum - WBS 1.1.2.1 |
James A. MacLachlan |
Beam Dynamics
Vacuum
Vacuum
|
10 Mar 1993 |
82-v1 |
Summary of the Existing MR Beam Diagnostics for Use in Main Injector |
Chandrashekhara M. Bhat et al. |
Beam Dynamics
Beam Instrumentation
|
01 Mar 1993 |
76-v1 |
Calculating Orbit Errors in Main Injector Using Two or One BPM/Cell Correction Scheme |
Fady A. Harfoush |
Beam Dynamics
Lattice
|
03 Dec 1992 |
78-v1 |
On the Calculation of Sextupole Correctors Strength in Main Injector Using TPOT |
Fady A. Harfoush |
Magnets
Lattice
|
02 Dec 1992 |
75-v1 |
Beamline Errors and Corrector Strengths |
David E. Johnson |
Beam Dynamics
Magnets
|
14 Aug 1992 |
74-v1 |
How Long is a 'Foot'? |
Allison D. Russell |
Civil
Alignment
|
30 Jun 1992 |
72-v1 |
Main Injector Correctors Workshop, Friday, May 8, 1992, Fermilab |
Management of Main Injector Project |
Magnets
MI-Dept
|
08 May 1992 |
68-v1 |
Conceptual Design Report of Vacuum Pumping System for Main Injector |
Shuxiu Zhang |
Vacuum
Vacuum
|
30 Dec 1991 |
67-v1 |
Systematic and Random Errors for Main Injector Tracking |
Fady A. Harfoush et al. |
Magnets
|
31 Oct 1991 |
69-v1 |
Estimation of the Effective Pumping Speed for Two Installation Geometries |
Shuxiu Zhang |
Vacuum
Civil
Vacuum
|
27 Sep 1991 |
66-v1 |
Siberian Snakes in the Main Injector |
Uli Wienands |
Lattice
|
01 Sep 1991 |
704-v1 |
Proton Single Coalesced-Bunch Intensities in the Main Injector |
Gerry Dugan |
Beam Dynamics
RF
|
06 Aug 1991 |
65-v1 |
Main Injector Sextupole Strength - Supplement |
S. Alex Bogacz |
Magnets
|
01 Aug 1991 |
64-v1 |
Proposal for Experimental Test of RF Harmonic Transition Crossing in the Main Ring |
Chandrashekhara M. Bhat et al. |
Lattice
|
28 Jun 1991 |
62-v1 |
Minutes from the First Main Injector 'Review' Meeting May 29, 1991 |
Philip S. Martin |
Extraction
Lattice
Transfer Lines
|
29 May 1991 |
59-v1 |
A Transitionless Lattice for the Fermilab Main Injector |
S. Y. Lee et al. |
Design Properties
|
06 May 1991 |
60-v1 |
Design and Multiparticle Simulation of the Half Integer Slow Extraction System for the Main Injector |
Michael Harrison et al. |
Extraction
|
06 May 1991 |
61-v1 |
Examination of the Stability of the Advanced Imaginary gamma_t Lattice |
S. Y. Lee et al. |
Beam Dynamics
Lattice
Studies
|
06 May 1991 |
56-v1 |
Change in Nomenclature for the Main Injector |
Philip S. Martin |
Civil
Lattice
|
12 Apr 1991 |
55-v1 |
Desirable Tevatron F0 Straight Optics for 150 GeV Injection |
David E. Johnson et al. |
Transfer Lines
|
03 Apr 1991 |
57-v1 |
Synchrotron Phase Transition Crossing Using an RF Harmonic |
James E. Griffin |
Beam Dynamics
RF
|
01 Mar 1991 |
53-v1 |
2D Magnetostatic Field Representations on a Rectangular Region |
Jean-Francois Ostiguy |
Magnets
Magnets
|
22 Feb 1991 |
52-v1 |
Chromaticity Compensation Sextupole Strengths |
S. Alex Bogacz |
Beam Dynamics
Magnets
Lattice
|
20 Feb 1991 |
49-v2 |
alpha_1 Dismay |
James A. MacLachlan |
Beam Dynamics
|
12 Feb 1991 |
48-v1 |
Location of Main Injector Relative to Tevatron |
Stephen G. Peggs |
Civil
Beam Transfer
|
05 Feb 1991 |
41-v1 |
Main Ring Remnant Configuration |
Steven L. Hays et al. |
Magnets
Transfer Lines
|
06 Dec 1990 |
29-v1 |
150 GeV and Revised 120 GeV Ramps |
Philip S. Martin |
Power Supplies
|
06 Dec 1990 |
46-v1 |
Microwave Instability at Transition - Stability Diagram Approach |
S. Alex Bogacz |
Beam Dynamics
|
01 Dec 1990 |
37-v2 |
Main Injector Dipole Magnet: 2d Field Computations |
Jean-Francois Ostiguy |
Magnets
Magnets
|
24 Oct 1990 |
40-v1 |
Main Injector Dipole Magnet: Lorentz Forces |
Jean-Francois Ostiguy |
Magnets
|
09 Oct 1990 |
38-v1 |
Eddy Current Induced Multipoles in the Main Injector |
Jean-Francois Ostiguy |
Magnets
|
04 Oct 1990 |
44-v1 |
MI Beam Tube Analysis |
James Kerby |
Magnets
Design Properties
Vacuum
|
11 Sep 1990 |
30-v1 |
Main Injector Corrector Strength Analysis |
Rodney E. Gerig |
Magnets
Power Supplies
|
14 Aug 1990 |
34-v1 |
Transition Crossing in the Main Injector-ESME Simulation |
S. Alex Bogacz |
Beam Dynamics
|
01 Aug 1990 |
27-v2 |
Main Injector Sextupole Requirements |
Rodney E. Gerig |
Magnets
Magnets
Lattice
|
25 Jul 1990 |
700-v1 |
Sloping the Main Injector |
Philip S. Martin |
Design Properties
Civil
|
22 Jun 1990 |
28-v1 |
Standard Ramps |
Philip S. Martin |
RF
Power Supplies
|
14 Jun 1990 |
36-v1 |
Burning up the Beampipe |
John A. Johnstone |
Magnets
Design Properties
|
10 Jun 1990 |
35-v1 |
Proposal for MI Injection and Extraction Kickers |
John A. Dinkel |
Magnets
|
10 Jun 1990 |
31-v1 |
Main Injector RF Cycle and Z/N Limit |
Kingyuen B. Ng |
Beam Dynamics
RF
|
10 Jun 1990 |
32-v1 |
Some Estimation Concerning Crossing Transition of the Main Injector |
Kingyuen B. Ng |
Beam Dynamics
|
01 Jun 1990 |
26-v2 |
MI_15 Kicker Specifications |
David E. Johnson |
Extraction
Magnets
Transfer Lines
|
17 Apr 1990 |
14-v2 |
Eddy Current Effects in the Main Injector Beam Tube |
Stephen D. Holmes |
Beam Dynamics
Magnets
|
10 Apr 1990 |
16-v1 |
The Effect of Various Steels on B0/D0 Dipoles |
Stanley M. Pruss |
Magnets
Magnets
|
04 Apr 1990 |
4-v1 |
A New Lattice for the Main Injector |
Rodney E. Gerig |
Design Properties
Lattice
|
31 Oct 1989 |
3-v1 |
A Dynamic Lattice Insertion for Main Injector Extraction |
Rodney E. Gerig |
Extraction
Beam Dynamics
Lattice
|
31 Oct 1989 |
18-v2 |
Magnets |
Thomas L. Collins |
Magnets
Design Properties
Magnets
|
10 Oct 1989 |
24-v1 |
Extraction Losses from the Main Injector |
Samuel R. Childress et al. |
Extraction
|
27 Sep 1989 |
15-v2 |
Longitudinal Emittance Growth at Transition in the Main Injector |
Stanley M. Pruss et al. |
Beam Dynamics
|
11 Sep 1989 |
19-v2 |
RF Intensity Limitations in the Main Injector |
James E. Griffin |
RF
HLRF
|
18 Aug 1989 |
25-v1 |
Fermilab Fixed Target Beams from the Main Injector |
Samuel R. Childress |
Extraction
Transfer Lines
|
01 May 1989 |