3523-v1 |
Residual Radiation Monitoring in the Main Injector with the ROTEM RAM DA3-2000 Radiation Survey Meter |
Bruce C. Brown |
Other
|
27 May 2020 |
4519-v1 |
Studies of MI Beam Intensity, Loss and Activation Patterns |
Bruce C. Brown |
Beam Instrumentation
ES&H
DCCTs
|
27 May 2020 |
2834-v1 |
Main Injector Residual Radiation Data 2004 - 2007 |
Bruce C. Brown |
ES&H
|
22 May 2020 |
1977-v1 |
MI8 Beamline Collimation Design |
Bruce C. Brown |
Transfer Lines
Collimation
|
18 May 2020 |
1926-v2 |
Reducing Losses in Main Injector by MI8 Line Scraping |
Bruce C. Brown et al. |
Studies
Electron Cooling
Transfer Lines
Collimation
|
18 May 2020 |
307-v2 |
Shielding Assessment of F0 to Switchyard Beam Line Enclosure for MI 120 GeV Beam Transport |
Chandrashekhara M. Bhat |
Beam Dynamics
ES&H
Transfer Lines
|
28 Feb 2020 |
309-v2 |
Ground Water, Air-Borne and Soil Activation from the Operation of the MI-40 Beam Absorber During the FMI Era |
Chandrashekhara M. Bhat |
ES&H
|
26 Sep 2019 |
7540-v1 |
Radiation Studies for Main Injector Activation Using MARS in a `Toy Model' |
Phil Adamson et al. |
Beam Physics
Main Injector
|
09 Aug 2019 |
5101-v1 |
A historical comparison of Booster radiation activations surveys |
William A Pellico |
Booster
|
16 Mar 2016 |
4733-v1 |
Impact of Laser Notcher on Radiation in MEBT |
David E. Johnson |
Projects
ES&H
|
22 Dec 2014 |
4679-v1 |
Total Loss Monitor Radiation Safety System |
Anthony F. Leveling |
Muon
Accelerator Seminar
Booster
|
08 Oct 2014 |
4493-v1 |
Ultra High Input Impedance Electrometer/Pulse Train Converter For the Measurement of Beam Losses |
Dan Schoo |
Mu2e
|
04 Dec 2013 |
4332-v1 |
ASTA Low Energy Enclosure Shielding Drawings |
Mike Church |
NML
|
02 Apr 2013 |
3980-v2 |
Analysis Procedures for Al Activation Studies |
Bruce C. Brown |
Beam Instrumentation
Beam Loss Monitors (BLM)
ES&H
Energy Deposition
Collimation
|
09 Apr 2012 |
4026-v1 |
Muon Task Force |
Valeri A Lebedev |
Mu2e
|
20 Dec 2011 |
3964-v1 |
Project X Based Muon Factory |
Valeri A Lebedev |
Mu2e
|
06 Oct 2011 |
3732-v1 |
Linac and Booster Radiation Shielding Status, Plans and Constraints |
John E Anderson |
Linac
Booster
ES&H
ES&H
|
08 Dec 2010 |
3717-v1 |
Comparison of Short Term Cooldown Data for MI Collimator C307 Near Beam and Beside Marble Shielding |
Amir Jaehoon Safavi |
ES&H
|
17 Nov 2010 |
3576-v2 |
Radiation Shielding Tests for Laser Power Supply |
David E. Johnson |
Project X
Beam Instrumentation
|
18 Mar 2010 |
3502-v1 |
HINS Shielding/Dose Calculation with Shielding Cracks |
Nikolai Mokhov |
Project X
Proton Driver
Energy Deposition
|
19 Nov 2009 |
3219-v1 |
Analysis of Some Crude Main Injector Radiation Cool-down Data |
Bruce C. Brown |
ES&H
Operations
|
03 Oct 2008 |
2287-v1 |
Mechanical Design of MI8 Collimators |
Bruce C. Brown et al. |
Transfer Lines
Collimation
|
22 Apr 2008 |
2388-v2 |
Thermal Calculation for MI8 Collimators |
Bruce C. Brown et al. |
Transfer Lines
Collimation
|
22 Apr 2008 |
2426-v2 |
MARS15 Calculations for MI8 Collimator Design |
Bruce C. Brown et al. |
Proton Plan
ES&H
Transfer Lines
Collimation
|
22 Apr 2008 |
3023-v1 |
Advanced Accelerator R&D at the A0 Photoinjector |
Raymond P Fliller |
Diagnostics
Experiments
Photoinjector
|
06 Feb 2008 |
1975-v2 |
Optical Imaging of the Tevatron Beam using Synchrotron Radiation |
Randy M Thurman-Keup |
Emittance
SyncLite (SL)
Instrumentation
|
29 Jan 2008 |
336-v1 |
Shielding Assessment of the Main Injector Complex |
Chandrashekhara M. Bhat et al. |
Studies
|
19 Nov 2007 |
2595-v2 |
Proceedings of the miniworkshop on Possible Advanced Accelerator R&D Directions at the ILC Test Accelerator (NML) at Fermilab |
Philippe R.-G. Piot |
Beam Dynamics
Optics
Adv. Accelerator R&D
|
28 Dec 2006 |
2489-v1 |
OTR Measurements and Modeling of the Electron Beam Parameters at the E-cooling Facility |
Arden A. Warner |
Electron Cooling
OTR
|
29 Sep 2006 |
2322-v1 |
High energy H- ion transport and stripping |
Weiren Chou |
Future Accelerators
|
05 Jul 2006 |
2321-v2 |
8 GeV H- ions: transport and injection |
Weiren Chou |
Future Accelerators
|
05 Jul 2006 |
2220-v1 |
Losses at AP50 During Stacking |
Steve Werkema |
Debuncher
Run II Upgrades
|
30 Mar 2006 |
1382-v2 |
Residual Radiation Hints for Aperture and Alignment Issues in the Main Injector |
Bruce C. Brown |
Alignment
ES&H
Vacuum
|
18 Jan 2005 |
1430-v2 |
Booster Corrector System Specification |
David J. Harding et al. |
Upgrades
Projects
Controls
|
05 Nov 2004 |
1346-v1 |
Optical set-up for the digital camera system at FNPL |
Philippe R.-G. Piot et al. |
Diagnostics
OTR
|
15 Sep 2004 |
1336-v1 |
Radiation tests of the Texas Instruments TLK2501 in the Tevatron Tunnel |
Andreas Jansson |
Ion Profile Monitor
Instrumentation
|
08 Sep 2004 |
1036-v1 |
Beam to NuMI |
Peter Kasper |
Primary Proton Beam
|
24 Feb 2004 |
1013-v1 |
Report of the Review of the BTeV Interaction Point - October 7, 2003 |
Michael J. Syphers |
CZero IR Development
|
11 Feb 2004 |
846-v2 |
First Tests of an Optical Transition Radiation Detector for High-Intensity Proton Beams at FNAL |
Vic Scarpine |
OTR
|
25 Sep 2003 |
148-v2 |
AP4 Beam Dump and Allowed Beam Intensity Limit During the Construction Phase of theMI-8 GeV Beam-line |
Chandrashekhara M. Bhat |
Beam Dynamics
ES&H
|
10 Jul 2003 |
105-v1 |
Radiation Levels in the 8 GeV Beamline Arising from the Tevatron Beam Losses |
Chandrashekhara M. Bhat et al. |
ES&H
|
24 Jun 2003 |
515-v1 |
Proton Economics |
Elliott S McCrory |
Operations
Operations
|
20 Mar 2003 |
344-v1 |
Preliminary Measurement of Airborne Radioactvity in the MI40 Absorber Room and at MI40 Abort Lambertsons |
Anthony F. Leveling |
Studies
ES&H
|
07 Apr 1999 |
342-v1 |
Radiation Dose Rate Measurement at Tevatron Wave Guide Penetrations at F0 Service Building due to 8 GeV Proton Beam Loss |
Anthony F. Leveling |
ES&H
|
05 Feb 1999 |
332-v1 |
Determination of Interlock Gate Locations at E35, F47, and A25 |
Anthony F. Leveling |
Studies
ES&H
Civil
|
15 Sep 1998 |
330-v1 |
Committed Effective Dose Equivalent Calculation for Personnel Exposure to Airborne Radioactivity Produced by Main Injector Beam Loss |
Anthony F. Leveling |
Studies
ES&H
|
07 Jul 1998 |
315-v1 |
Main Injector and Recycler Ring Shielding Assessment |
Chandrashekhara M. Bhat et al. |
Studies
ES&H
|
01 Jul 1998 |
305-v2 |
A Preliminary Analysis of Ground-Water and Surface-Water Radioactivity Around the Main Injector Extraction and Injection Regions |
Chandrashekhara M. Bhat et al. |
Studies
ES&H
|
01 Nov 1997 |
289-v1 |
Main Injector 8 GeV Beam Line Shielding Assessment |
Chandrashekhara M. Bhat et al. |
ES&H
Magnets
|
17 Feb 1997 |
235-v1 |
Groundwater, Air-Borne and Soil Activation from the Operation of the Temporary Beam Absorber in the MI-8 GeV Beam Line |
Chandrashekhara M. Bhat et al. |
ES&H
Civil
|
25 Jan 1997 |
211-v2 |
Ground-water Activation from the Operation of MI40 Beam Absorber |
Chandrashekhara M. Bhat et al. |
ES&H
Design Properties
|
28 Aug 1996 |
197-v1 |
8 GeV Beam Absorber for Beam Line Commissioning |
Chandrashekhara M. Bhat et al. |
ES&H
Design Properties
Commissioning
|
31 Jul 1996 |
146-v2 |
Radiation Level in the Intersection Region of AP2 and 8 GeV Beam-line due to Beam Loss in the AP2 Beam-line |
Chandrashekhara M. Bhat et al. |
Beam Dynamics
ES&H
|
23 Aug 1995 |
136-v2 |
µ-Dose Level in the Vicinity of the Intersection of the 8 GeV and the AP2-Beamlines |
Chandrashekhara M. Bhat |
Beam Dynamics
ES&H
|
28 Jun 1995 |
100-v1 |
Radiation Levels in the MI-60 Enclosure from Tevatron Beam Losses |
Chandrashekhara M. Bhat |
Beam Dynamics
ES&H
Civil
|
08 Nov 1993 |
95-v1 |
Radioactivity of the Closed Loop Cooling Water of the Main Injector Beam Abort Dump |
Chandrashekhara M. Bhat |
ES&H
Design Properties
|
01 Sep 1993 |
88-v3 |
Radiation Shieldings for MI Culverts |
Chandrashekhara M. Bhat |
ES&H
Design Properties
Civil
|
01 Aug 1993 |
87-v2 |
A Design Study of the MI40 Beam-Abort Dump |
Chandrashekhara M. Bhat |
ES&H
Design Properties
|
29 Jul 1993 |
68-v1 |
Conceptual Design Report of Vacuum Pumping System for Main Injector |
Shuxiu Zhang |
Vacuum
Vacuum
|
30 Dec 1991 |