8560-v3 |
Beam Losses for the PIP-III Linac to Recycler/Main Injector |
David V Neuffer |
Main Injector
Recycler
Upgrades
|
01 Sep 2020 |
3857-v1 |
Main Injector Counterwave Properties and MI300 Collimator Motion Limits |
Bruce C. Brown |
Console Applications
Lattice
Transfer Lines
Collimation
Transfer Lines
|
27 May 2020 |
6811-v6 |
AD/Instrumentation Status Meeting Minutes and Slides |
Craig C Drennan |
Monitoring Instrumentation
Beam Instrumentation
Beam Instrumentation
IOTA
Beamline
Beam Instrumentation
PXIE
FAST
Beam Instrumentation
Instrumentation
|
04 May 2020 |
1178-v1 |
Recycler BPM Calibration Application Users Guide |
Marc W Mengel |
BPM
Beam Instrumentation
|
30 Apr 2020 |
557-v9 |
Design for Recycler BPM Calibration Acnet Page |
Marc W Mengel |
BPM
BPM
Beam Instrumentation
Data Acquisition
|
23 Apr 2020 |
531-v1 |
Notes for MI/RR Group Meeting of 24 March 2003 |
Daniel R. Broemmelsiek et al. |
MI-RR-Group
Studies
Dampers
|
23 Apr 2020 |
529-v1 |
Notes for MI/RR Group Meeting of 19 March 2003 |
Bruce C. Brown |
MI-RR-Group
Schottky
Magnets
Beam Instrumentation
Vacuum
|
23 Apr 2020 |
528-v1 |
Notes for MI/RR Group Meeting of 10 March 2003 |
Bruce C. Brown |
Extraction
MI-RR-Group
Beam Instrumentation
Vacuum
RF
|
23 Apr 2020 |
484-v1 |
Notes for MI/RR Group Meeting of 26 Feb 2003 |
Chandrashekhara M. Bhat et al. |
MI-RR-Group
BPM
RF
RF
Beam Instrumentation
|
23 Apr 2020 |
469-v3 |
Notes for MI/RR Group Meeting of 24 Feb 2003 |
Bruce C. Brown |
MI-RR-Group
Studies
Vacuum
Transfer Lines
|
23 Apr 2020 |
468-v4 |
Notes for MI/RR Group Meeting of 19 Feb 2003 |
Bruce C. Brown |
Beam Dynamics
MI-RR-Group
Beam Instrumentation
Studies
RF
Transfer Lines
|
23 Apr 2020 |
456-v1 |
Notes for MI/RR Group Meeting of 12 Feb 2003 |
Bruce C. Brown |
Operations
MI-RR-Group
Vacuum
Beam Dynamics
|
23 Apr 2020 |
434-v1 |
Notes for MI/RR Group Meeting of 10 Feb 2003 |
Bruce C. Brown et al. |
MI-RR-Group
Magnets
Beam Instrumentation
Studies
|
23 Apr 2020 |
416-v1 |
Notes for MI/RR Group Meeting of 22 Jan 2003 |
Bruce C. Brown |
RR2003Winter
MI-RR-Group
Other
Beam Instrumentation
Beam Instrumentation
MI2003Winter
|
23 Apr 2020 |
392-v1 |
Notes for MI/RR Group Meeting of 08 Jan 2003 |
Bruce C. Brown |
MI-RR-Group
Studies
|
23 Apr 2020 |
283-v5 |
Notes for MI/RR Group Meeting of 18 Dec 2002 |
Daniel R. Broemmelsiek et al. |
Operations
MI-RR-Group
Studies
|
28 Feb 2020 |
367-v3 |
Determining the Radius and Energy of the Recycler Ring |
Ioanis Kourbanis |
BPM
Beam Instrumentation
Studies
RF
|
03 Oct 2019 |
372-v2 |
Calibration of the Recycler Transverse Schottky Detectors |
Martin J. Hu |
Schottky
Beam Instrumentation
ACNET
|
26 Sep 2019 |
314-v1 |
Recycler Dump Magnet Requirements |
David E. Johnson et al. |
Magnets
Magnets
|
26 Sep 2019 |
319-v3 |
Recycler Magnet Alignment Offset |
Consolato Gattuso |
Alignment
Magnets
|
26 Sep 2019 |
7573-v2 |
Design Considerations and Operational Features of the Collimators for the Fermilab Main Injector and Recycler |
Bruce C. Brown |
ES&H
Beam Physics
Main Injector
Collimation
Energy Deposition
Recycler
Transfer Lines
Collimation
Transfer Lines
|
30 Aug 2019 |
7400-v1 |
Fermilab Main Injector: Promises Kept and More |
Bruce C. Brown |
Main Injector
Project
Recycler
|
19 Jun 2019 |
7136-v1 |
Diplexer for Recycler Medium Level Electronics |
Edward W. Cullerton |
RF
|
20 Mar 2019 |
7145-v1 |
Longitudinal Schottky Pickup for the Recycler |
Edward W. Cullerton et al. |
Recycler
|
20 Mar 2019 |
7160-v1 |
Optical Notch Filters for Recycler Stochastic Cooling |
Edward W. Cullerton et al. |
Recycler
|
20 Mar 2019 |
6270-v2 |
Al Tag Radiation Studies for Instrumentation in the Main Injector |
Bruce C. Brown et al. |
Photographs
ES&H
Beam Instrumentation
Main Injector
Recycler
Beam Instrumentation
Instrumentation
|
13 Apr 2018 |
604-v2 |
Increasing the Range of Recycler IBEAM |
James L. Crisp et al. |
Beam Instrumentation
|
22 Aug 2003 |
5301-v4 |
Achievable Aperture Improvements for the Recycler |
Bruce C. Brown et al. |
Lattice
Magnets
|
30 Dec 2016 |
5247-v1 |
MI8 line Beam emittance measurement |
Ming-jen Yang |
Booster
Main Injector
Recycler
|
06 Oct 2016 |
4982-v2 |
Aperture Implications for Recycler Assuming Full Coupling and Nominal Vertical Apertures |
Bruce C. Brown |
Lattice
Collimation
Collimation
|
12 May 2016 |
4880-v1 |
Magnetic Field Calculations for Recycler Magnets |
Bruce C. Brown et al. |
Magnets
Magnets
|
08 Jul 2015 |
4827-v5 |
XFR Modification to Resetting Beam Sync (AA) and Offset Beam Sync (OAA) |
Craig C Drennan |
Operations
LLRF
RF
LLRF
RF
LLRF
|
05 Jun 2015 |
4760-v1 |
Microwave Measurement of Recycler Electron Cloud, 12/19/14 |
Jeffrey Eldred |
Instabilities
Beam Instrumentation
Studies
Beam Dynamics
|
13 May 2015 |
4775-v1 |
Performing Vacuum Calculations Using ANSYS |
Kris A Anderson |
Vacuum
Vacuum
Vacuum
Vacuum
Vacuum
Vacuum/Water/Utilities
Vacuum
|
27 Feb 2015 |
4734-v2 |
E-Cloud Instability in the Recycler |
Alexey Burov |
Instabilities
Beam Dynamics
|
16 Jan 2015 |
4599-v2 |
Cable Mitigation at MI House 10 |
Elliott S McCrory et al. |
BPM
Beam Instrumentation
|
16 May 2014 |
4244-v1 |
Meeting Notes from RR BPM System -- November 1, 2012 |
Phil Adamson et al. |
BPM
BPM
Beam Instrumentation
|
01 Nov 2012 |
3974-v2 |
Concept: mu2e with Slow Spill from the Recycler Milorad Popovic |
Milorad B. Popovic |
Booster
Recycler
Upgrades
Project X
|
27 Oct 2011 |
2530-v2 |
Tune shifts in the Recycler |
Alexander Shemyakin |
Beam Dynamics
|
28 Sep 2011 |
1169-v6 |
Digital Receiver Based Recycler BPM Front-end Software |
Duane C Voy |
BPM
BPM
Beam Instrumentation
|
11 Sep 2009 |
3348-v1 |
Cooling of Hadrons at Relativistic Energies: Performance of FNALs Recycler Electron Cooler |
Lionel R. Prost |
Electron Cooling
|
30 Mar 2009 |
3293-v1 |
Reports on the development of the BETACOOL code for simulating cooling processes in the Recycler ring |
Alexander Smirnov_JINR et al. |
Beam Physics
Electron Cooling
Stochastic Cooling
Beam Dynamics
|
30 Jan 2009 |
3254-v2 |
Permannet Magnet Work at Fermilab 1995 to present |
James T. Volk |
Accelerator Seminar
Magnets
|
05 Dec 2008 |
3220-v2 |
Preparation of Accelerator Complex for Muon Physics Experiments at Fermilab |
Chuck Ankenbrandt et al. |
Antiproton Source
|
28 Oct 2008 |
3191-v2 |
Sextupole Feed-down effect due to counter-waves in Main Injector and Recycler |
Ming-jen Yang |
Lattice
Lattice
|
29 Aug 2008 |
3192-v1 |
RF Requirements for Bunching in the Recycler for Injection Into the g-2 Ring |
Chandrashekhara M. Bhat et al. |
Recycler
Beam Dynamics
|
28 Aug 2008 |
3188-v1 |
Extracting the effective bandwidth of the transverse stochastic cooling systems from standard cooling rate measurements |
Lionel R. Prost et al. |
Studies
Recycler
Stochastic Cooling
|
20 Aug 2008 |
3167-v1 |
Cooling the Hot Momentum Beam after the Tev Shots |
Chandrashekhara M. Bhat et al. |
RF
Studies
Recycler
Beam Dynamics
|
27 Jul 2008 |
3028-v1 |
Recycler batch length effects on R:BEAM as measured with a Bergoz 'New Parametric Current Transformer' |
James L. Crisp |
Beam Instrumentation
Intensity Measurements
DCCTs
|
11 Feb 2008 |
2884-v2 |
Reconstruction of Longitudinal Phase-spaceby Monte Carlo Method |
Chandrashekhara M. Bhat |
RF
Recycler
Beam Dynamics
|
05 Oct 2007 |
2768-v1 |
Compound bucket study |
Chandrashekhara M. Bhat et al. |
Studies
Electron Cooling
Beam Dynamics
|
03 May 2007 |
2675-v1 |
R20 beamline optics study |
Ming-jen Yang |
Transfer Lines
|
05 Mar 2007 |
2672-v1 |
Results of Recycler Optics Fitting Using LOCO |
Alexander A. Valishev |
Lattice
Recycler
|
01 Mar 2007 |
2535-v1 |
Electron cooling at the Recycler: Update |
Lionel R. Prost et al. |
Accelerator Seminar
Electron Cooling
|
18 Dec 2006 |
2558-v1 |
Improvements in Momentum Mining for Tevatron Shots |
Chandrashekhara M. Bhat |
Beam Dynamics
|
15 Nov 2006 |
2355-v1 |
Preventing onset of beam instabilities in the e-cooled |
Chandrashekhara M. Bhat |
Beam Dynamics
|
20 Jul 2006 |
2313-v2 |
Strip-Mining |
Chandrashekhara M. Bhat et al. |
Beam Dynamics
|
29 Jun 2006 |
2226-v1 |
Proton Stacking in the Recycler |
Chandrashekhara M. Bhat |
Beam Dynamics
SNuMi
Beam Dynamics
|
17 Apr 2006 |
2178-v2 |
First Report of the Proton Study Group |
Sergei Nagaitsev et al. |
Operations
Other
General
Upgrades
SY120
|
03 Apr 2006 |
2209-v1 |
APPLICATIONS OF BARRIER BUCKET RF SYSTEMS AT FERMILAB |
Chandrashekhara M. Bhat |
Beam Dynamics
Electromagnetic Calculations
Beam Dynamics
|
15 Mar 2006 |
2208-v1 |
Bunch compression and stretching using barrier rf system |
Chandrashekhara M. Bhat |
Beam Dynamics
Longitudinal Dynamics
Beam Dynamics
|
15 Mar 2006 |
2108-v1 |
Notes about an operation at 600 E10 level |
Alexander Shemyakin |
Operations
|
24 Jan 2006 |
745-v1 |
Gated Current Integrator for the Beam in the RR Barrier Bucket |
Chandrashekhara M. Bhat et al. |
RF
Beam Instrumentation
LLRF
LLRF
Beam Dynamics
|
13 Dec 2005 |
1782-v7 |
A 2 MegaWatt Multi-Stage Proton Accumulator |
Dave McGinnis |
Future Accelerators
|
03 Nov 2005 |
1948-v1 |
Model of Antiproton Stack Size Versus Rapid Transfer Time |
Dave McGinnis |
Operations
Accumulator
|
05 Sep 2005 |
1892-v1 |
Recycler Transverse Damper Status |
James L. Crisp |
Instabilities
BPM
BPM
Dampers
Beam Dynamics
|
06 Jul 2005 |
1886-v1 |
Recylcer Orbit Length Optimization, June 29 Status report |
Paul Lebrun |
Studies
Beam Dynamics
|
29 Jun 2005 |
1851-v1 |
ISO-ADIABATIC MERGING OF PBAR STACKS IN THE FERMILAB RECYCLER |
Chandrashekhara M. Bhat |
Longitudinal Dynamics
Alignment
Beam Dynamics
|
31 May 2005 |
1024-v3 |
OBSOLETE |
Duane C Voy |
Front-end Systems
Beam Instrumentation
Beam Line Tuner (BLT)
|
11 May 2005 |
1812-v1 |
The Recycler Commissioning Plan |
Sergei Nagaitsev |
Commissioning
|
06 May 2005 |
1795-v3 |
Pbar Aggregates for Fast Recycler Shots |
Brian E. Drendel |
Operations
Operations
Accumulator
|
03 May 2005 |
1747-v1 |
Recycler Beam Line Tuner Front-end Operation |
Duane C Voy |
Beam Instrumentation
Beam Line Tuner (BLT)
Weekly SDA meetings
|
22 Mar 2005 |
1746-v1 |
Harmonic analysis of selected Recycler locations using closed 3-bump orbits. |
Ming-jen Yang |
Optics
Magnets
|
22 Mar 2005 |
1601-v2 |
Recycler FW report at Feb 23, 2005 Instrumentation/beam physics meeting |
Martin J. Hu |
Flying Wires
Flying Wires
Instrumentation/beam Physics
|
11 Mar 2005 |
1492-v1 |
BPM measurements in the cooling section |
Alexander Shemyakin |
Electron Cooling
|
08 Dec 2004 |
1468-v1 |
Momentum Mining in the Recycler |
Chandrashekhara M. Bhat |
Longitudinal Dynamics
Beam Dynamics
|
22 Nov 2004 |
1443-v3 |
Operations Model: Incorporating the Recycler |
Elliott S McCrory |
Operations
|
12 Nov 2004 |
1438-v1 |
Barrier Bucket and Bunched Beam Cooling in the Recycler |
David V Neuffer |
Longitudinal Dynamics
Stochastic Cooling
Stochastic Cooling
|
09 Nov 2004 |
1350-v1 |
Electron Cooling Commissioning Plan |
Sergei Nagaitsev |
Electron Cooling
Run II
|
17 Sep 2004 |
1268-v1 |
Preliminary Results from Tevatron Collider Model with Assumptions on Recycler Integration |
Elliott S McCrory |
Operations
|
22 Jul 2004 |
1208-v2 |
Some Thoughts About June 9 Induced Instability at the Recycler Ring |
Kingyuen B. Ng |
Instabilities
Beam Dynamics
|
02 Jul 2004 |
447-v1 |
OBSOLETE |
Duane C Voy |
BPM
Beam Instrumentation
|
18 May 2004 |
446-v1 |
OBSOLETE |
Duane C Voy |
BPM
BPM
Beam Instrumentation
|
18 May 2004 |
801-v1 |
OBSOLETE |
Duane C Voy |
BPM
BPM
Beam Instrumentation
Front-end Documentation
|
18 May 2004 |
800-v2 |
OBSOLETE |
Duane C Voy |
BPM
BPM
Front-end Documentation
Beam Instrumentation
|
18 May 2004 |
445-v1 |
Resonant Log Amplifier Based Recycler BPM Front-end Software Description |
Duane C Voy |
BPM
BPM
Beam Instrumentation
|
18 May 2004 |
1150-v3 |
Recycler transverse instability |
Sergei Nagaitsev |
Beam Dynamics
|
07 May 2004 |
1157-v1 |
Redefining MI 8 GeV Energy, a Proposal |
David E. Johnson |
Operations
|
04 May 2004 |
1140-v1 |
Redefining MI 8 GeV Energy to Maximize Pbar Production |
David E. Johnson |
Operations
Operations
|
23 Apr 2004 |
1136-v1 |
Recycler status (talk at UEC meeting, Apr 2004) |
Sergei Nagaitsev |
Operations
|
21 Apr 2004 |
560-v13 |
RR BPM channel Assignments |
Peter Prieto |
RR2003Spring
BPM
BPM
Beam Instrumentation
|
17 Mar 2004 |
1041-v1 |
Echotek Drivers |
Charles Briegel |
BPM
Beam Instrumentation
Tevatron BPM
BPM
|
24 Feb 2004 |
933-v2 |
Pbar Momentum Mining in the Recycler :simulations and beam studies |
Chandrashekhara M. Bhat |
Operations
RF
Studies
Beam Dynamics
|
28 Jan 2004 |
916-v1 |
RR BPM Calibration Note |
Stephen Pordes |
BPM
Beam Instrumentation
|
18 Nov 2003 |
867-v1 |
Recycler_BPM_Sign_Conventions |
Peter Prieto et al. |
BPM
Beam Instrumentation
|
06 Oct 2003 |
845-v1 |
Recycler vacuum work shutdown plan (Aug 2003) |
Consolato Gattuso |
Vacuum
|
24 Sep 2003 |
844-v1 |
Recycler vacuum review Aug 2003 |
Terry G. Anderson |
Vacuum
|
24 Sep 2003 |
826-v1 |
Recycler IPM Photos |
Jim Zagel |
Beam Instrumentation
Ion Profile Monitor
|
11 Sep 2003 |
817-v1 |
Recycler Vacuum Certification Requirements |
Lucy Nobrega |
Vacuum
|
08 Sep 2003 |
794-v1 |
Recycler Vacuum System Overview |
Sergei Nagaitsev |
Vacuum
|
19 Aug 2003 |
793-v1 |
Recycler Vacuum Review 2003 |
Sergei Nagaitsev |
Studies
Vacuum
Beam Dynamics
|
19 Aug 2003 |
337-v1 |
Another High Dispersion - Low beta Recycler Insert |
John A. Johnstone |
Lattice
Magnets
Beam Instrumentation
Beam Dynamics
|
14 Aug 2003 |
775-v0 |
Recycler and 8 GeV Line Permanent Magnets: Reference Design and Performance Requirements |
George W. Foster |
Magnets
Transfer Lines
|
11 Aug 2003 |
767-v1 |
LabVIEW VI Upgrades on the IPM Systems at Fermilab |
Thomas Spears |
Beam Instrumentation
Ion Profile Monitor
Beam Instrumentation
Beam Instrumentation
|
08 Aug 2003 |
169-v1 |
Recycler Pbar Transfer Lines |
David E. Johnson |
Transfer Lines
|
01 Aug 2003 |
369-v1 |
Longitudinal Schottky Pickup for the Recycler |
Edward W. Cullerton et al. |
Schottky
Beam Instrumentation
|
29 Jul 2003 |
181-v3 |
Chromaticity Adjustment System for the Recycler |
Stephen D. Holmes |
Magnets
Magnets
Beam Instrumentation
|
24 Jul 2003 |
179-v2 |
Magnetic Field Quality Specification for Recycler Ring Combined Function and Quadrupole Magnets |
Norman M. Gelfand et al. |
Magnets
Studies
|
23 Jul 2003 |
293-v1 |
Optics and Field Error Compensation in the FNAL Permanent Magnet 8.9 GeV/c Proton Transfer Line |
John A. Johnstone |
Lattice
Magnets
|
17 Jul 2003 |
322-v1 |
Recycler Lambertson Magnet Configurations Main Injector -- Recycler Transfer Lines |
David J. Harding |
Magnets
Magnets
Magnets
|
16 Jul 2003 |
213-v1 |
Main Injector and Beamline Naming Conventions |
David E. Johnson et al. |
Controls
Civil
Lattice
|
08 Jul 2003 |
198-v2 |
A Phase Trombone for the Recycler Ring |
Alper A Garren et al. |
Lattice
|
08 Jul 2003 |
184-v1 |
A Low ß, High Dispersion Insert for the Recycler Ring |
Norman M. Gelfand |
Lattice
Magnets
|
07 Jul 2003 |
144-v1 |
1995 Electron Cooling Spring Study Bibliography |
Frederick E Mills |
Electron Cooling
|
01 Jul 2003 |
374-v1 |
The Time Evolution of Beam in the Recycler Ring |
Krishnaswamy Gounder et al. |
Vacuum
Beam Dynamics
|
20 Jun 2003 |
368-v1 |
The Effects of Antiproton Beam Ionization: First Glance |
Chandrashekhara M. Bhat et al. |
Beam Dynamics
|
20 Jun 2003 |
378-v1 |
The Recycler Ring Vacuum: A Comprehensive Report |
Terry G. Anderson et al. |
Vacuum
|
20 Jun 2003 |
605-v1 |
MI/RR Damper |
George W. Foster et al. |
Dampers
Run II
Dampers
|
16 May 2003 |
590-v1 |
rrCrates_Modules.xls (aftershtdn) 4-18-03.xls |
John Van Bogaert |
RR2003Winter
Beam Instrumentation
|
07 May 2003 |
589-v1 |
rrCrates_Modules.xls (aftershtdn) 4-18-03.xls |
John Van Bogaert |
RR2003Winter
Beam Instrumentation
|
07 May 2003 |
572-v1 |
Bandpass Filter for Recycler Momentum System. |
Ding Sun |
Beam Instrumentation
Beam Dynamics
|
29 Apr 2003 |
570-v1 |
Design and RF Measurement Results of Schottky Pickup for Recycler and Tevatron |
Ding Sun |
Schottky
Beam Instrumentation
Instrumentation
|
29 Apr 2003 |
569-v1 |
Design and Measurement Results of Microwave Absorbers in Schottky |
Ding Sun |
Schottky
Beam Instrumentation
Instrumentation
|
29 Apr 2003 |
519-v2 |
Recycler Vacuum: Lifetime and Emittance Growth |
Krishnaswamy Gounder |
Vacuum
|
02 Apr 2003 |
525-v1 |
RR and Transport BPM Tech Spec |
Bob Webber |
BPM
BPM
Beam Instrumentation
|
22 Mar 2003 |
520-v1 |
Recycler Ring Beam Lifetime: Beam-gas Interactions |
Krishnaswamy Gounder et al. |
Vacuum
Beam Dynamics
|
20 Mar 2003 |
379-v2 |
RECYCLER BPM SYSTEM UPGRADE |
Ming-jen Yang |
BPM
|
13 Jan 2003 |
489-v1 |
Notes for MI/RR Group Meeting of 5 March 2003 |
Terry G. Anderson et al. |
MI-RR-Group
Vacuum
Vacuum
|
10 Mar 2003 |
488-v1 |
Notes for MI/RR Group Meeting of 3 March 2003 |
Bruce C. Brown |
MI-RR-Group
RF
Vacuum
|
10 Mar 2003 |
457-v2 |
Recycler BPM Front-end 030217 Technical Review |
Duane C Voy |
BPM
BPM
Beam Instrumentation
|
18 Feb 2003 |
453-v1 |
A Matlab Simulation of the Proposed Recycler BPM Signal Processing |
Warren Schappert |
RR2003Winter
BPM
BPM
Beam Instrumentation
Data Acquisition
|
17 Feb 2003 |
452-v1 |
Recycler Upgrade Pre-Amplifier- Transition Module Design |
Peter Prieto |
BPM
BPM
Beam Instrumentation
|
14 Feb 2003 |
435-v1 |
RR pbar Longitudinal Emittance during Beam stacking and Unstacking |
Chandrashekhara M. Bhat |
Beam Dynamics
|
13 Feb 2003 |
443-v1 |
RR BPM Meeting minutes to discuss Software |
Bob Webber |
RR BPM
BPM
BPM
Beam Instrumentation
|
13 Feb 2003 |
442-v1 |
RR BPM Meeting minutes to discuss Calibration System |
Bob Webber |
RR BPM
BPM
BPM
Beam Instrumentation
|
13 Feb 2003 |
441-v1 |
RR BPM Meeting minutes to discuss ECHOTEK DDC Signal Processing |
Bob Webber |
RR BPM
BPM
BPM
Beam Instrumentation
|
13 Feb 2003 |
440-v1 |
RR BPM Meeting minutes on preamps and transition modules/crates |
Bob Webber |
RR BPM
BPM
BPM
Beam Instrumentation
|
13 Feb 2003 |
439-v1 |
RR BPM Meeting on Schedule Development |
Bob Webber |
RR BPM
BPM
BPM
Beam Instrumentation
|
13 Feb 2003 |
438-v1 |
Recycler BPM Proposal - July 10, 2002 |
James L. Crisp et al. |
BPM
BPM
Beam Instrumentation
|
13 Feb 2003 |
425-v1 |
Recycler BPM Requirements Review - Committee Response |
Valeri A Lebedev et al. |
BPM
Beam Instrumentation
|
07 Feb 2003 |
138-v1 |
Requirements for the Recycler Ring and Associated Transfer Line BPMs |
Brajesh Choudhary |
BPM
BPM
Beam Instrumentation
Beam Instrumentation
|
07 Feb 2003 |
401-v1 |
RR BPM Functional Specification |
Brajesh Choudhary |
RR2003Spring
BPM
Beam Instrumentation
|
07 Feb 2003 |
419-v1 |
Thoughts On Using A Wire To Simulate Beam Through a BPM Pickup |
Bob Webber |
BPM
BPM
Beam Instrumentation
|
29 Jan 2003 |
414-v1 |
Recycler Ion Clearing Field Power Supplies |
James A. Fitzgerald |
BPM
Beam Instrumentation
|
27 Jan 2003 |
407-v1 |
MI-60 RECYCLER AND LAB BPM MEASUREMENTS |
Dallas Heikkinen et al. |
BPM
Beam Instrumentation
|
27 Jan 2003 |
402-v1 |
Intrabeam Scattering in the Recycler Ring: A Fresh Look |
Krishnaswamy Gounder et al. |
Beam Dynamics
|
24 Jan 2003 |
390-v1 |
Notes for MI/RR Group Meeting of 04 Dec 2002 |
Bruce C. Brown |
MI-RR-Group
Commissioning
|
14 Jan 2003 |
389-v1 |
Notes for MI/RR Group Meeting of 27 Nov 2002 |
Bruce C. Brown |
MI-RR-Group
Studies
|
14 Jan 2003 |
388-v1 |
Notes for MI/RR Group Meeting of 18 Nov 2002 |
Bruce C. Brown |
MI-RR-Group
Commissioning
|
14 Jan 2003 |
387-v1 |
Notes for MI/RR Group Meeting of 6 Nov 2002 |
Bruce C. Brown |
MI-RR-Group
Commissioning
|
14 Jan 2003 |
383-v1 |
Notes for MI/RR Group Meeting of 7 Oct 2002 |
Bruce C. Brown |
MI-RR-Group
BPM
Beam Instrumentation
Studies
Controls
|
14 Jan 2003 |
382-v1 |
Notes for MI/RR Group Meeting of 30 Sep 2002 |
Bruce C. Brown et al. |
MI-RR-Group
RF
Vacuum
Studies
Vacuum
Beam Dynamics
Transfer Lines
|
14 Jan 2003 |
381-v1 |
Notes for MI/RR Group Meeting of 25 Sep 2002 |
Bruce C. Brown |
MI-RR-Group
Vacuum
Vacuum
Transfer Lines
|
14 Jan 2003 |
384-v1 |
Notes for MI/RR Group Meeting of 16 Oct 2002 |
Bruce C. Brown et al. |
Magnets
MI-RR-Group
Magnets
Studies
Stochastic Cooling
|
14 Jan 2003 |
284-v4 |
Notes for MI/RR Group Meeting of 23 Dec 2002 |
Bruce C. Brown et al. |
Beam Dynamics
MI-RR-Group
RF
Studies
Beam Dynamics
|
07 Jan 2003 |
141-v1 |
Software jobs for RR Flying Wire system |
Alberto Marchionni |
RR2003Winter
Beam Instrumentation
|
10 Dec 2002 |
377-v1 |
Transverse Beam Profile with Scraper Scans |
Daniel R. Broemmelsiek et al. |
Beam Instrumentation
Beam Dynamics
|
11 Oct 2002 |
375-v1 |
Vacuum Windows in Recycler Transfer Lines |
Carol J. Johnstone et al. |
Vacuum
Transfer Lines
Transfer Lines
|
27 Sep 2002 |
744-v1 |
Simulation of Pbar Stacking and Un-Stacking in the Recycler Ring |
Chandrashekhara M. Bhat |
Beam Dynamics
RF
Beam Instrumentation
Studies
|
01 Sep 2002 |
376-v1 |
A First Look at the Longitudinal Emittance in the Fermilab Recycler Ring |
Chandrashekhara M. Bhat |
RF
Beam Instrumentation
Beam Dynamics
|
02 Aug 2002 |
371-v1 |
Recycler Admittance Measurements |
Daniel R. Broemmelsiek et al. |
Beam Dynamics
|
29 Jul 2002 |
370-v1 |
Radial Position Shift Due to Synchrotron Oscillation |
Martin J. Hu |
BPM
Beam Dynamics
|
15 Jun 2002 |
702-v1 |
Recycler Ring Lifetime and Emittance Growth |
Terry G. Anderson et al. |
Vacuum
Stochastic Cooling
Beam Dynamics
Commissioning
|
08 Aug 2001 |
352-v1 |
Preparing the Proton Bunches in 2.5 MHz Buckets for MI Tune-up |
Chandrashekhara M. Bhat |
Beam Dynamics
RF
Beam Instrumentation
|
01 Jun 2001 |
366-v2 |
Recycler Ring Aperture Scan: Summary of Results |
Saeed Assadi et al. |
Studies
|
31 Dec 2000 |
363-v1 |
RQME DATA |
James T. Volk |
Magnets
|
20 Nov 2000 |
355-v1 |
Recycler Corrector Status |
David E. Johnson |
Alignment
|
09 Sep 2000 |
354-v1 |
Pbar Acceleration in the Main Injector for Run II: ESME Simulations |
Chandrashekhara M. Bhat et al. |
RF
Beam Instrumentation
Studies
|
26 Jul 2000 |
348-v1 |
Transverse Placement of Gradient Magnets |
Bruce C. Brown et al. |
Alignment
Magnets
Alignment
|
08 May 2000 |
345-v1 |
Recycler Lambertson Magnetic Design |
George W. Foster |
Magnets
Magnets
Vacuum
Transfer Lines
|
24 Mar 1999 |
329-v1 |
Recycler Commissioning Plan |
Gerald P. Jackson |
Studies
Commissioning
|
11 Nov 1998 |
338-v1 |
Recycler Quadrupole Magnetic Designs |
George W. Foster |
Magnets
Magnets
|
24 Sep 1998 |
296-v1 |
Mirror Magnet Designs for the Recycler Ring |
George W. Foster |
Magnets
Magnets
Transfer Lines
|
01 Aug 1998 |
315-v1 |
Main Injector and Recycler Ring Shielding Assessment |
Chandrashekhara M. Bhat et al. |
ES&H
Studies
|
01 Jul 1998 |
327-v1 |
Dispersion-Wave Generation of a High eta/sqrt(ß) Insert in the Recycler |
John A. Johnstone |
Lattice
Beam Instrumentation
Beam Dynamics
|
22 May 1998 |
328-v1 |
Transient Measurement of the Betatron Phase Advance Around the Recycler Ring |
Gerald P. Jackson |
Lattice
Beam Instrumentation
Controls
|
16 May 1998 |
323-v2 |
Beam Position Monitors for the Fermilab Recycler Ring |
Ed Barsotti, Jr. et al. |
BPM
BPM
Beam Instrumentation
|
29 Apr 1998 |
291-v1 |
Analytic Results on Requirements for Recycler Gradient Magnet Longitudinal Uniformity |
Bruce C. Brown |
Lattice
Magnets
|
22 Jan 1998 |
318-v2 |
Magnetic Design of Recycler Ring v.18 Gradient Dipoles |
George W. Foster |
Magnets
Magnets
|
01 Jan 1998 |
313-v1 |
Ferrite and Compensator Symmetry Requirements for Gradient Magnets |
Bruce C. Brown |
Magnets
|
19 Dec 1997 |
311-v1 |
Signs of Harmonics: Permanent Quad Tuning and Skew Components of Gradient Magnets |
Bruce C. Brown |
Magnets
|
03 Dec 1997 |
312-v1 |
Recycler Instrumentation: Detector and Electronics Locations |
Gregory L. Vogel |
Alignment
Beam Instrumentation
|
01 Dec 1997 |
310-v1 |
Options for Line-of-Sight Signal Transmission of the Recycler Stochastic Cooling Systems |
Gerald P. Jackson |
Magnets
Stochastic Cooling
|
27 Oct 1997 |
297-v1 |
Dynamic Aperture for the Recycler Lattices RRv16 and RRv17 |
Norman M. Gelfand |
Lattice
Beam Dynamics
|
18 Jul 1997 |
285-v2 |
Effects of the Longitudinal Variation in the Magnetic Field in the Recycler Combined Function Magnets |
Norman M. Gelfand |
Lattice
Magnets
|
20 Feb 1997 |
287-v1 |
Measurements of the Longitudinal Shape and Center of the Magnetic Field of PDD Dipoles |
Bruce C. Brown |
Magnets
Magnets
Transfer Lines
|
17 Feb 1997 |
234-v1 |
Rectangular Combined Function Magnets |
Norman M. Gelfand |
Magnets
Magnets
|
28 Jan 1997 |
233-v2 |
Effect of the Measured Sextupole Moment of the Recycler Magnets on the Chromaticity and the Dynamic Aperture |
Norman M. Gelfand |
Magnets
Magnets
|
11 Dec 1996 |
232-v1 |
Characteristics of the RRv9 Lattice as Determined from Tracking and Calculations of the Effects of the High Order Multiple Moments Listed in MI-0170 |
Norman M. Gelfand |
Lattice
Magnets
|
05 Dec 1996 |
229-v3 |
Reference Orbit Trajectory in a Combined Function Magnet |
Stephen D. Holmes |
Lattice
Magnets
Beam Dynamics
|
05 Dec 1996 |
230-v2 |
Translating Measured Multipoles onto the Reference Orbit in Recycler Combined Function Magnet |
Stephen D. Holmes |
Magnets
Magnets
|
05 Dec 1996 |
227-v1 |
Rogowski Coil Measurements of PQP003 and PQP004 |
Bruce C. Brown et al. |
Magnets
Magnets
Transfer Lines
|
25 Nov 1996 |
228-v1 |
Mechanical and Magnetic Tolerances in Recycler Prototype Magnets |
George W. Foster |
Magnets
|
20 Nov 1996 |
200-v1 |
Mass Separation in a Proton Analog of a 5 MeV Electron Beam |
Kirt J. Bertsche |
Beam Instrumentation
Electron Cooling
Electron Cooling
|
01 Aug 1996 |
196-v3 |
Evaluation of Resonance Widths from Recycler Magnetic Field Multipoles for Recycler Lattice RRV7 |
Stephen D. Holmes |
Lattice
Alignment
Magnets
|
31 Jul 1996 |
116-v1 |
Permanent Magnet Stability |
Jean-Francois Ostiguy |
Magnets
Magnets
|
14 Jun 1996 |
187-v1 |
Recycler Lattice (rrv6.) |
Sho Ohnuma |
Lattice
|
01 Jun 1996 |
182-v1 |
A Possible Strategy for Recycler Orbit Correction |
Stephen D. Holmes |
Magnets
Beam Instrumentation
|
26 Apr 1996 |
180-v1 |
Impedances and Beam Stability Issues of the Fermilab Recycler Ring |
Kingyuen B. Ng |
Instabilities
Beam Dynamics
|
18 Apr 1996 |
176-v1 |
Betatron Cooling for the Recycler |
John P. Marriner |
Stochastic Cooling
Beam Dynamics
|
10 Apr 1996 |
175-v1 |
Filter Momentum Cooling for the Recycler |
John P. Marriner |
Stochastic Cooling
Beam Dynamics
|
05 Apr 1996 |
173-v2 |
Evaluation of Resonance Widths from Recycler Magnetic Field Multipoles |
Stephen D. Holmes |
Optics
Lattice
Magnets
Studies
|
03 Apr 1996 |
170-v1 |
Closed Orbit Effects Due to Longitudinal Bend Center Displacement |
Bruce C. Brown |
Alignment
Transfer Lines
Transfer Lines
|
02 Apr 1996 |
158-v2 |
Recycler Beta Function Distortions from Systematic and Random Gradient Errors in Combined Function and Quadrupole Magnets |
Stephen D. Holmes et al. |
Lattice
Magnets
|
02 Apr 1996 |
174-v1 |
Momentum Stacking in the Recycler |
John P. Marriner |
Beam Dynamics
|
01 Apr 1996 |
172-v1 |
Stochastic Cooling of the Recycler Antiproton Stack Momentum Spread Including Intrabeam Scattering and Barrier Buckets |
Gerald P. Jackson |
Stochastic Cooling
|
29 Mar 1996 |
156-v1 |
Recycler Closed Orbit Distortion Expected from Random Magnetic Element Strength and Alignment Errors |
Stephen D. Holmes |
Alignment
Magnets
|
04 Mar 1996 |
155-v2 |
Recycler Closed Orbit Distortion from a Systematic Mismatch Between Long and Short Combined Function Magnet Strengths |
Stephen D. Holmes et al. |
Magnets
|
29 Feb 1996 |
154-v2 |
Transverse Schottky Detector for Antiproton Recycle Ring |
Ping J. Chou |
Beam Instrumentation
|
18 Dec 1995 |
145-v2 |
Outline of the 5 MeV Electron Test Beam Project |
Gerald P. Jackson |
Electron Cooling
Electron Cooling
|
21 Aug 1995 |
143-v1 |
Design Specifications for the 90o Dipoles for the Recycler Ring Electron Cooling Beamline |
Gerald P. Jackson |
Magnets
Magnets
Electron Cooling
|
14 Aug 1995 |
133-v1 |
Recycler Ring Lattice Design with Combined Function Magnets |
David E. Johnson |
Lattice
Magnets
|
03 Mar 1995 |
132-v2 |
High Beta Insert for MI-like Ring |
David E. Johnson |
Optics
Lattice
|
22 Feb 1995 |