3414-v1 |
HINS 325 MHz Cavity Test Cave Documentation |
Rick Bossert et al. |
Project X
ACNET
HLRF
|
27 May 2020 |
3224-v1 |
AN 8 GEV CW LINAC WITH HIGH POTENTIAL BEAM POWER |
Chuck Ankenbrandt et al. |
Project X
Linac
|
07 Oct 2008 |
2611-v1 |
Essential Features of LARP Strands |
Lance Cooley |
Technology
|
11 Jan 2007 |
2345-v1 |
Fundamentals of RF Systems emphasis on Superconducting RF |
Ralph Pasquinelli |
HLRF
LLRF
|
13 Jul 2006 |
1374-v1 |
9-Cell Superconducting Capture Cavity Tuning Guidelines |
James K. Santucci |
Operations
|
24 Sep 2004 |
898-v2 |
Open Question on SCRF Linacs and the ATW machines |
Paul Lebrun |
Future Accelerators
|
04 Nov 2003 |
683-v1 |
TOWARDS A NEW LHC INTERACTON REGION DESIGN FOR A LUMINOSITY UPGRADE |
Mike Lamm et al. |
None
|
20 Jun 2003 |
577-v1 |
CKM Horizontal Input Coupler External Quality Factor Simulations |
Tim G. Berenc |
HLRF
|
29 Apr 2003 |
576-v1 |
The Design of a Physically Symmetric 2-Port RF Junction Applied to the CKM Input Coupler RF Feedthrough . |
Tim G. Berenc |
HLRF
|
29 Apr 2003 |
574-v1 |
The Effect of a Reflective Interface along the Input Waveguide on the Q Measurement of a Resonate Cavity. |
Tim G. Berenc |
HLRF
|
29 Apr 2003 |