A short note summarizing the results of two 36x36 stores that were done in November of 1995 during studies periods at the end of Run I. The studies uncovered a number of potential problems with 36x36 operations, but beam intensities were too low to draw any conclusion about the success of 36x36 operations with the predicted Run II beam parameters.