Beams Document 3128-v3

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Specifications for the Project X Injection Absorber

Document #:
Beams-doc-3128-v3
Document type:
Note
Submitted by:
David E. Johnson
Updated by:
David E. Johnson
Document Created:
23 Jun 2008, 09:51
Contents Revised:
23 Jun 2008, 10:34
Metadata Revised:
23 Jun 2008, 10:34
Viewable by:
  • Public document
Modifiable by:

Quick Links:
Latest Version

Other Versions:
Beams-doc-3128-v2
23 Jun 2008, 10:30
Beams-doc-3128-v1
23 Jun 2008, 10:09
Beams-doc-3128-v0
23 Jun 2008, 09:51
Abstract:
The function of the Project X injection absorber is to accept protons generated after the secondary stripping foil which will intercept the un-stripped H- and H0 particles after the Recycler injection point. This absorber will not be used as a long term full intensity H- dump for Project X. Environmental and Residual dosage limits as well as the methodology for calculating concentrations will be reviewed. The expected beam intensity and the limits on the beam intensity to the absorber will be discussed in terms of the water and personnel protection. This note is meant to be used in determining requirements for the injection absorber and suggest potential geometry.
Keywords:
beam_dump Project X
DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.8.10, contact Beams Document Database Administrators