A proposal to site the BNL/BU g-2 Ring[1] at Fermilab is being considered. The possibility of implementing
a practical scheme quickly and inexpensively using existing Fermilab facililities soon to be available for adaptive
reuse is attractive both for fundamental physics reasons and for program continuity. This note presents a conceptual
solution to one of the major technical challenges raised by the proposal, viz., the bunching of Booster batches
in the Recycler to a few sub-μs bunches suitable for producing muon beam of required time structure. The result
given is by no means the last word on this subject, but it has potential for accommodating changes that may be
more economical or more tolerant of the operational vagaries of the Booster. Such development of the concept is
beginning. Costing using these initial results should be meaningful, but less idealized results should be available
soon