Luminosity projection curves for Run II FY02-FY11
Document #:
Beams-doc-3540-v1
Document type:
Note
Submitted by:
Vaia Papadimitriou
Updated by:
Vaia Papadimitriou
Document Created:
29 Jan 2010, 11:38
Contents Revised:
29 Jan 2010, 11:38
Metadata Revised:
29 Jan 2010, 11:38
Viewable by:
Public document
Modifiable by:
beams
Quick Links:
Latest Version
Abstract:
Luminosity projections up to FY11.
For FY10, FY11 the projections are for 32.2 pb-1 per week for "minimum" and 52.1 pb-1 per week for "maximum"
A four week shutdown is being assumed for the summer of FY10.
Files in Document:
luminosity projection curves as of June 20, 2009
(lumprojection_FY04-FY11_June20_2009.ppt, 334.0 kB)
Topics:
Tevatron
Controls
:
SDA
Authors:
Vaia Papadimitriou
Keywords:
luminosity
[