Beams Document 5064-v2

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Meson Test Improvements During the January 2016 Shutdown

Document #:
Beams-doc-5064-v2
Document type:
Note
Submitted by:
Michael R Backfish
Updated by:
Michael R Backfish
Document Created:
04 Feb 2016, 13:17
Contents Revised:
04 Feb 2016, 17:00
Metadata Revised:
04 Feb 2016, 17:00
Viewable by:
  • Public document
Modifiable by:

Quick Links:
Latest Version

Other Versions:
Beams-doc-5064-v1
04 Feb 2016, 13:17
Abstract:
This document outlines 2 of the 3 primary changes in the Meson Test beamline during the January 2016 shutdown. The changes for the shutdown are a new PWC in the air gap before MT5VT1, the high rate tracking area motion table was re-installed, and ultimately the vacuum system received much needed maintenance. The first two of these are covered in this document.
Files in Document:
Keywords:
pwc
DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.8.10, contact Beams Document Database Administrators